Keep Us Strong WikiLeaks logo

Currently released so far... 251287 / 251,287

Articles

Browse latest releases

Browse by creation date

Browse by origin

A B C D F G H I J K L M N O P Q R S T U V W Y Z

Browse by tag

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
AEMR ASEC AMGT AE AS AMED AVIAN AU AF AORC AGENDA AO AR AM APER AFIN ATRN AJ ABUD ARABL AL AG AODE ALOW ADANA AADP AND APECO ACABQ ASEAN AA AFFAIRS AID AGR AY AGS AFSI AGOA AMB ARF ANET ASCH ACOA AFLU AFSN AMEX AFDB ABLD AESC AFGHANISTAN AINF AVIATION ARR ARSO ANDREW ASSEMBLY AIDS APRC ASSK ADCO ASIG AC AZ APEC AFINM ADB AP ACOTA ASEX ACKM ASUP ANTITERRORISM ADPM AINR ARABLEAGUE AGAO AORG AMTC AIN ACCOUNT ASECAFINGMGRIZOREPTU AIDAC AINT ARCH AMGTKSUP ALAMI AMCHAMS ALJAZEERA AVIANFLU AORD AOREC ALIREZA AOMS AMGMT ABDALLAH AORCAE AHMED ACCELERATED AUC ALZUGUREN ANGEL AORL ASECIR AMG AMBASSADOR AEMRASECCASCKFLOMARRPRELPINRAMGTJMXL ADM ASES ABMC AER AMER ASE AMGTHA ARNOLDFREDERICK AOPC ACS AFL AEGR ASED AFPREL AGRI AMCHAM ARNOLD AN ANATO AME APERTH ASECSI AT ACDA ASEDC AIT AMERICA AMLB AMGE ACTION AGMT AFINIZ ASECVE ADRC ABER AGIT APCS AEMED ARABBL ARC ASO AIAG ACEC ASR ASECM ARG AEC ABT ADIP ADCP ANARCHISTS AORCUN AOWC ASJA AALC AX AROC ARM AGENCIES ALBE AK AZE AOPR AREP AMIA ASCE ALANAZI ABDULRAHMEN ABDULHADI AINFCY ARMS ASECEFINKCRMKPAOPTERKHLSAEMRNS AGRICULTURE AFPK AOCR ALEXANDER ATRD ATFN ABLG AORCD AFGHAN ARAS AORCYM AVERY ALVAREZ ACBAQ ALOWAR ANTOINE ABLDG ALAB AMERICAS AFAF ASECAFIN ASEK ASCC AMCT AMGTATK AMT APDC AEMRS ASECE AFSA ATRA ARTICLE ARENA AISG AEMRBC AFR AEIR ASECAF AFARI AMPR ASPA ASOC ANTONIO AORCL ASECARP APRM AUSTRALIAGROUP ASEG AFOR AEAID AMEDI ASECTH ASIC AFDIN AGUIRRE AUNR ASFC AOIC ANTXON ASA ASECCASC ALI AORCEUNPREFPRELSMIGBN ASECKHLS ASSSEMBLY ASECVZ AI ASECPGOV ASIR ASCEC ASAC ARAB AIEA ADMIRAL AUSGR AQ AMTG ARRMZY ANC APR AMAT AIHRC AFU ADEL AECL ACAO AMEMR ADEP AV AW AOR ALL ALOUNI AORCUNGA ALNEA ASC AORCO ARMITAGE AGENGA AGRIC AEM ACOAAMGT AGUILAR AFPHUM AMEDCASCKFLO AFZAL AAA ATPDEA ASECPHUM ASECKFRDCVISKIRFPHUMSMIGEG
ETRD ETTC EU ECON EFIN EAGR EAID ELAB EINV ENIV ENRG EPET EZ ELTN ELECTIONS ECPS ET ER EG EUN EIND ECONOMICS EMIN ECIN EINT EWWT EAIR EN ENGR ES EI ETMIN EL EPA EARG EFIS ECONOMY EC EK ELAM ECONOMIC EAR ESDP ECCP ELN EUM EUMEM ECA EAP ELEC ECOWAS EFTA EXIM ETTD EDRC ECOSOC ECPSN ENVIRONMENT ECO EMAIL ECTRD EREL EDU ENERG ENERGY ENVR ETRAD EAC EXTERNAL EFIC ECIP ERTD EUC ENRGMO EINZ ESTH ECCT EAGER ECPN ELNT ERD EGEN ETRN EIVN ETDR EXEC EIAD EIAR EVN EPRT ETTF ENGY EAIDCIN EXPORT ETRC ESA EIB EAPC EPIT ESOCI ETRB EINDQTRD ENRC EGOV ECLAC EUR ELF ETEL ENRGUA EVIN EARI ESCAP EID ERIN ELAN ENVT EDEV EWWY EXBS ECOM EV ELNTECON ECE ETRDGK EPETEIND ESCI ETRDAORC EAIDETRD ETTR EMS EAGRECONEINVPGOVBN EBRD EUREM ERGR EAGRBN EAUD EFI ETRDEINVECINPGOVCS EPEC ETRO ENRGY EGAR ESSO EGAD ENV ENER EAIDXMXAXBXFFR ELA EET EINVETRD EETC EIDN ERGY ETRDPGOV EING EMINCG EINVECON EURM EEC EICN EINO EPSC ELAP ELABPGOVBN EE ESPS ETRA ECONETRDBESPAR ERICKSON EEOC EVENTS EPIN EB ECUN EPWR ENG EX EH EAIDAR EAIS ELBA EPETUN ETRDEIQ EENV ECPC ETRP ECONENRG EUEAID EWT EEB EAIDNI ESENV EADM ECN ENRGKNNP ETAD ETR ECONETRDEAGRJA ETRG ETER EDUC EITC EBUD EAIF EBEXP EAIDS EITI EGOVSY EFQ ECOQKPKO ETRGY ESF EUE EAIC EPGOV ENFR EAGRE ENRD EINTECPS EAVI ETC ETCC EIAID EAIDAF EAGREAIDPGOVPRELBN EAOD ETRDA EURN EASS EINVA EAIDRW EON ECOR EPREL EGPHUM ELTM ECOS EINN ENNP EUPGOV EAGRTR ECONCS ETIO ETRDGR EAIDB EISNAR EIFN ESPINOSA EAIDASEC ELIN EWTR EMED ETFN ETT EADI EPTER ELDIN EINVEFIN ESS ENRGIZ EQRD ESOC ETRDECD ECINECONCS EAIT ECONEAIR ECONEFIN EUNJ ENRGKNNPMNUCPARMPRELNPTIAEAJMXL ELAD EFIM ETIC EFND EFN ETLN ENGRD EWRG ETA EIN EAIRECONRP EXIMOPIC ERA ENRGJM ECONEGE ENVI ECHEVARRIA EMINETRD EAD ECONIZ EENG ELBR EWWC ELTD EAIDMG ETRK EIPR EISNLN ETEX EPTED EFINECONCS EPCS EAG ETRDKIPR ED EAIO ETRDEC ENRGPARMOTRASENVKGHGPGOVECONTSPLEAID ECONEINVEFINPGOVIZ ERNG EFINU EURFOR EWWI ELTNSNAR ETD EAIRASECCASCID EOXC ESTN EAIDAORC EAGRRP ETRDEMIN ELABPHUMSMIGKCRMBN ETRDEINVTINTCS EGHG EAIDPHUMPRELUG EAGRBTIOBEXPETRDBN EDA EPETPGOV ELAINE EUCOM EMW EFINECONEAIDUNGAGM ELB EINDETRD EMI ETRDECONWTOCS EINR ESTRADA EHUM EFNI ELABV ENR EMN EXO EWWTPRELPGOVMASSMARRBN EATO END EP EINVETC ECONEFINETRDPGOVEAGRPTERKTFNKCRMEAID ELTRN EIQ ETTW EAI ENGRG ETRED ENDURING ETTRD EAIDEGZ EOCN EINF EUPREL ENRL ECPO ENLT EEFIN EPPD ECOIN EUEAGR EISL EIDE ENRGSD EINVECONSENVCSJA EAIG ENTG EEPET EUNCH EPECO ETZ EPAT EPTE EAIRGM ETRDPREL EUNGRSISAFPKSYLESO ETTN EINVKSCA ESLCO EBMGT ENRGTRGYETRDBEXPBTIOSZ EFLU ELND EFINOECD EAIDHO EDUARDO ENEG ECONEINVETRDEFINELABETRDKTDBPGOVOPIC EFINTS ECONQH ENRGPREL EUNPHUM EINDIR EPE EMINECINECONSENVTBIONS EFINM ECRM EQ EWWTSP ECONPGOVBN
KFLO KPKO KDEM KFLU KTEX KMDR KPAO KCRM KIDE KN KNNP KG KMCA KZ KJUS KWBG KU KDMR KAWC KCOR KPAL KOMC KTDB KTIA KISL KHIV KHUM KTER KCFE KTFN KS KIRF KTIP KIRC KSCA KICA KIPR KPWR KWMN KE KGIC KGIT KSTC KACT KSEP KFRD KUNR KHLS KCRS KRVC KUWAIT KVPR KSRE KMPI KMRS KNRV KNEI KCIP KSEO KITA KDRG KV KSUM KCUL KPET KBCT KO KSEC KOLY KNAR KGHG KSAF KWNM KNUC KMNP KVIR KPOL KOCI KPIR KLIG KSAC KSTH KNPT KINL KPRP KRIM KICC KIFR KPRV KAWK KFIN KT KVRC KR KHDP KGOV KPOW KTBT KPMI KPOA KRIF KEDEM KFSC KY KGCC KATRINA KWAC KSPR KTBD KBIO KSCI KRCM KNNB KBNC KIMT KCSY KINR KRAD KMFO KCORR KW KDEMSOCI KNEP KFPC KEMPI KBTR KFRDCVISCMGTCASCKOCIASECPHUMSMIGEG KNPP KTTB KTFIN KBTS KCOM KFTN KMOC KOR KDP KPOP KGHA KSLG KMCR KJUST KUM KMSG KHPD KREC KIPRTRD KPREL KEN KCSA KCRIM KGLB KAKA KWWT KUNP KCRN KISLPINR KLFU KUNC KEDU KCMA KREF KPAS KRKO KNNC KLHS KWAK KOC KAPO KTDD KOGL KLAP KECF KCRCM KNDP KSEAO KCIS KISM KREL KISR KISC KKPO KWCR KPFO KUS KX KWCI KRFD KWPG KTRD KH KLSO KEVIN KEANE KACW KWRF KNAO KETTC KTAO KWIR KVCORR KDEMGT KPLS KICT KWGB KIDS KSCS KIRP KSTCPL KDEN KLAB KFLOA KIND KMIG KPPAO KPRO KLEG KGKG KCUM KTTP KWPA KIIP KPEO KICR KNNA KMGT KCROM KMCC KLPM KNNPGM KSIA KSI KWWW KOMS KESS KMCAJO KWN KTDM KDCM KCM KVPRKHLS KENV KCCP KGCN KCEM KEMR KWMNKDEM KNNPPARM KDRM KWIM KJRE KAID KWMM KPAONZ KUAE KTFR KIF KNAP KPSC KSOCI KCWI KAUST KPIN KCHG KLBO KIRCOEXC KI KIRCHOFF KSTT KNPR KDRL KCFC KLTN KPAOKMDRKE KPALAOIS KESO KKOR KSMT KFTFN KTFM KDEMK KPKP KOCM KNN KISLSCUL KFRDSOCIRO KINT KRG KWMNSMIG KSTCC KPAOY KFOR KWPR KSEPCVIS KGIV KSEI KIL KWMNPHUMPRELKPAOZW KQ KEMS KHSL KTNF KPDD KANSOU KKIV KFCE KTTC KGH KNNNP KK KSCT KWNN KAWX KOMCSG KEIM KTSD KFIU KDTB KFGM KACP KWWMN KWAWC KSPA KGICKS KNUP KNNO KISLAO KTPN KSTS KPRM KPALPREL KPO KTLA KCRP KNMP KAWCK KCERS KDUM KEDM KTIALG KWUN KPTS KPEM KMEPI KAWL KHMN KCRO KCMR KPTD KCROR KMPT KTRF KSKN KMAC KUK KIRL KEM KSOC KBTC KOM KINP KDEMAF KTNBT KISK KRM KWBW KBWG KNNPMNUC KNOP KSUP KCOG KNET KWBC KESP KMRD KEBG KFRDKIRFCVISCMGTKOCIASECPHUMSMIGEG KPWG KOMCCO KRGY KNNF KPROG KJAN KFRED KPOKO KM KWMNCS KMPF KJWC KJU KSMIG KALR KRAL KDGOV KPA KCRMJA KCRI KAYLA KPGOV KRD KNNPCH KFEM KPRD KFAM KALM KIPRETRDKCRM KMPP KADM KRFR KMWN KWRG KTIAPARM KTIAEUN KRDP KLIP KDDEM KTIAIC KWKN KPAD KDM KRCS KWBGSY KEAI KIVP KPAOPREL KUNH KTSC KIPT KNP KJUSTH KGOR KEPREL KHSA KGHGHIV KNNR KOMH KRCIM KWPB KWIC KINF KPER KILS KA KNRG KCSI KFRP KLFLO KFE KNPPIS KQM KQRDQ KERG KPAOPHUM KSUMPHUM KVBL KARIM KOSOVO KNSD KUIR KWHG KWBGXF KWMNU KPBT KKNP KERF KCRT KVIS KWRC KVIP KTFS KMARR KDGR KPAI KDE KTCRE KMPIO KUNRAORC KHOURY KAWS KPAK KOEM KCGC KID KVRP KCPS KIVR KBDS KWOMN KIIC KTFNJA KARZAI KMVP KHJUS KPKOUNSC KMAR KIBL KUNA KSA KIS KJUSAF KDEV KPMO KHIB KIRD KOUYATE KIPRZ KBEM KPAM KDET KPPD KOSCE KJUSKUNR KICCPUR KRMS KWMNPREL KWMJN KREISLER KWM KDHS KRV KPOV KWMNCI KMPL KFLD KWWN KCVM KIMMITT KCASC KOMO KNATO KDDG KHGH KRF KSCAECON KWMEN KRIC
PREL PINR PGOV PHUM PTER PE PREF PARM PBTS PINS PHSA PK PL PM PNAT PHAS PO PROP PGOVE PA PU POLITICAL PPTER POL PALESTINIAN PHUN PIN PAMQ PPA PSEC POLM PBIO PSOE PDEM PAK PF PKAO PGOVPRELMARRMOPS PMIL PV POLITICS PRELS POLICY PRELHA PIRN PINT PGOG PERSONS PRC PEACE PROCESS PRELPGOV PROV PFOV PKK PRE PT PIRF PSI PRL PRELAF PROG PARMP PERL PUNE PREFA PP PGOB PUM PROTECTION PARTIES PRIL PEL PAGE PS PGO PCUL PLUM PIF PGOVENRGCVISMASSEAIDOPRCEWWTBN PMUC PCOR PAS PB PKO PY PKST PTR PRM POUS PRELIZ PGIC PHUMS PAL PNUC PLO PMOPS PHM PGOVBL PBK PELOSI PTE PGOVAU PNR PINSO PRO PLAB PREM PNIR PSOCI PBS PD PHUML PERURENA PKPA PVOV PMAR PHUMCF PUHM PHUH PRELPGOVETTCIRAE PRT PROPERTY PEPFAR PREI POLUN PAR PINSF PREFL PH PREC PPD PING PQL PINSCE PGV PREO PRELUN POV PGOVPHUM PINRES PRES PGOC PINO POTUS PTERE PRELKPAO PRGOV PETR PGOVEAGRKMCAKNARBN PPKO PARLIAMENT PEPR PMIG PTBS PACE PETER PMDL PVIP PKPO POLMIL PTEL PJUS PHUMNI PRELKPAOIZ PGOVPREL POGV PEREZ POWELL PMASS PDOV PARN PG PPOL PGIV PAIGH PBOV PETROL PGPV PGOVL POSTS PSO PRELEU PRELECON PHUMPINS PGOVKCMABN PQM PRELSP PRGO PATTY PRELPGOVEAIDECONEINVBEXPSCULOIIPBTIO PGVO PROTESTS PRELPLS PKFK PGOVEAIDUKNOSWGMHUCANLLHFRSPITNZ PARAGRAPH PRELGOV POG PTRD PTERM PBTSAG PHUMKPAL PRELPK PTERPGOV PAO PRIVATIZATION PSCE PPAO PGOVPRELPHUMPREFSMIGELABEAIDKCRMKWMN PARALYMPIC PRUM PKPRP PETERS PAHO PARMS PGREL PINV POINS PHUMPREL POREL PRELNL PHUMPGOV PGOVQL PLAN PRELL PARP PROVE PSOC PDD PRELNP PRELBR PKMN PGKV PUAS PRELTBIOBA PBTSEWWT PTERIS PGOVU PRELGG PHUMPRELPGOV PFOR PEPGOV PRELUNSC PRAM PICES PTERIZ PREK PRELEAGR PRELEUN PHUME PHU PHUMKCRS PRESL PRTER PGOF PARK PGOVSOCI PTERPREL PGOVEAID PGOVPHUMKPAO PINSKISL PREZ PGOVAF PARMEUN PECON PINL POGOV PGOVLO PIERRE PRELPHUM PGOVPZ PGOVKCRM PBST PKPAO PHUMHUPPS PGOVPOL PASS PPGOV PROGV PAGR PHALANAGE PARTY PRELID PGOVID PHUMR PHSAQ PINRAMGT PSA PRELM PRELMU PIA PINRPE PBTSRU PARMIR PEDRO PNUK PVPR PINOCHET PAARM PRFE PRELEIN PINF PCI PSEPC PGOVSU PRLE PDIP PHEM PRELB PORG PGGOC POLG POPDC PGOVPM PWMN PDRG PHUMK PINB PRELAL PRER PFIN PNRG PRED POLI PHUMBO PHYTRP PROLIFERATION PHARM PUOS PRHUM PUNR PENA PGOVREL PETRAEUS PGOVKDEM PGOVENRG PHUS PRESIDENT PTERKU PRELKSUMXABN PGOVSI PHUMQHA PKISL PIR PGOVZI PHUMIZNL PKNP PRELEVU PMIN PHIM PHUMBA PUBLIC PHAM PRELKPKO PMR PARTM PPREL PN PROL PDA PGOVECON PKBL PKEAID PERM PRELEZ PRELC PER PHJM PGOVPRELPINRBN PRFL PLN PWBG PNG PHUMA PGOR PHUMPTER POLINT PPEF PKPAL PNNL PMARR PAC PTIA PKDEM PAUL PREG PTERR PTERPRELPARMPGOVPBTSETTCEAIRELTNTC PRELJA POLS PI PNS PAREL PENV PTEROREP PGOVM PINER PBGT PHSAUNSC PTERDJ PRELEAID PARMIN PKIR PLEC PCRM PNET PARR PRELETRD PRELBN PINRTH PREJ PEACEKEEPINGFORCES PEMEX PRELZ PFLP PBPTS PTGOV PREVAL PRELSW PAUM PRF PHUMKDEM PATRICK PGOVKMCAPHUMBN PRELA PNUM PGGV PGOVSMIGKCRMKWMNPHUMCVISKFRDCA PBT PIND PTEP PTERKS PGOVJM PGOT PRELMARR PGOVCU PREV PREFF PRWL PET PROB PRELPHUMP PHUMAF PVTS PRELAFDB PSNR PGOVECONPRELBU PGOVZL PREP PHUMPRELBN PHSAPREL PARCA PGREV PGOVDO PGON PCON PODC PRELOV PHSAK PSHA PGOVGM PRELP POSCE PGOVPTER PHUMRU PINRHU PARMR PGOVTI PPEL PMAT PAN PANAM PGOVBO PRELHRC

Browse by classification

Community resources

courage is contagious

Viewing cable 09LAHORE164, POWER IN PUNJAB: LIMITED OPTIONS FOR ADDING SUPPLY,

If you are new to these pages, please read an introduction on the structure of a cable as well as how to discuss them with others. See also the FAQs

Understanding cables
Every cable message consists of three parts:
  • The top box shows each cables unique reference number, when and by whom it originally was sent, and what its initial classification was.
  • The middle box contains the header information that is associated with the cable. It includes information about the receiver(s) as well as a general subject.
  • The bottom box presents the body of the cable. The opening can contain a more specific subject, references to other cables (browse by origin to find them) or additional comment. This is followed by the main contents of the cable: a summary, a collection of specific topics and a comment section.
To understand the justification used for the classification of each cable, please use this WikiSource article as reference.

Discussing cables
If you find meaningful or important information in a cable, please link directly to its unique reference number. Linking to a specific paragraph in the body of a cable is also possible by copying the appropriate link (to be found at theparagraph symbol). Please mark messages for social networking services like Twitter with the hash tags #cablegate and a hash containing the reference ID e.g. #09LAHORE164.
Reference ID Created Released Classification Origin
09LAHORE164 2009-08-08 10:24 2011-08-30 01:44 UNCLASSIFIED//FOR OFFICIAL USE ONLY Consulate Lahore
VZCZCXRO8024
RR RUEHLH RUEHPW
DE RUEHLH #0164/01 2201024
ZNR UUUUU ZZH
R 081024Z AUG 09
FM AMCONSUL LAHORE
TO RUEHC/SECSTATE WASHDC 4141
INFO RUEHIL/AMEMBASSY ISLAMABAD 4846
RUEHKP/AMCONSUL KARACHI 2126
RUEHPW/AMCONSUL PESHAWAR 1806
RUEHNE/AMEMBASSY NEW DELHI 0851
RUEHBUL/AMEMBASSY KABUL 0469
RUEHLO/AMEMBASSY LONDON 0179
RUCPDOC/DEPT OF COMMERCE WASHINGTON DC
RHMFISS/DEPT OF ENERGY WASHINGTON DC
RUEHC/USAID WASHDC
RUEHLH/AMCONSUL LAHORE 5296
UNCLAS SECTION 01 OF 03 LAHORE 000164 
 
SENSITIVE 
SIPDIS 
 
E.O. 12958: N/A 
TAGS: ECON EAID ECIN EINV ENRG ETRD PGOV PREL PK
SUBJECT: POWER IN PUNJAB: LIMITED OPTIONS FOR ADDING SUPPLY, 
OVERLOOKING EFFICIENCY 
 
REF: A. A.  LAHORE 154 
     B. B.  ISLAMABAD 1724 
 
1.  (SBU) Summary: The Punjab provincial government is 
increasingly concerned about persistent rolling blackouts, but 
has few options to respond to the electricity crisis.  In a July 
28 meeting with A/PO, son of the Chief Minister and Member of 
the Provincial Assembly, Hamza Sharif, acknowledged the 
necessity of the central government's three-point plan to meet 
the energy crisis: installing short-term rentals, paying off the 
"circular debt," and developing long-term power generation 
projects.  Punjab officials said they have several small 
electricity generation projects under way, but most power 
projects (including all private sector power projects over 50 
MW) are in the federal domain, and the provincial bureaucracy 
lacks the skills to drive such programs.  Even if the province 
had the funds and the expertise, the Pakistan Muslim 
League-Nawaz (PML-N)-led Punjab government must strike a careful 
balance between improving conditions and becoming associated 
with a problem that is otherwise an albatross around the neck of 
the Pakistan People's Party (PPP) federal government.  Given its 
constraints, Punjab's best option may be to focus on energy 
efficiency instead of generation.  End Summary. 
 
 
 
- - - 
 
LIGHTS OUT? LOCAL IMPACT OF A NATIONAL CRISIS 
 
- - - 
 
 
 
2.  (SBU) Trade groups and sweltering citizens took to the 
streets in Punjab province during the week of July 20 to protest 
massive disruptions of electricity supplies.  In the most 
extreme incident, marchers in Jhang district burned four railway 
cars (reftels).  Internal federal Water and Power Development 
Authority (WAPDA) estimates shown to Econoff July 28 put the 
current supply demand gap in Punjab alone at 3,000 megawatts 
(MW), and growing. 
 
 
 
- - - 
 
HAMZA SHARIF WORRIED ABOUT BLACKOUTS 
 
- - - 
 
 
 
3. (SBU) In a July 28 meeting with Acting Principal Officer, son 
of the Chief Minister and Member of the Provincial Assembly 
(MPA), Hamza Sharif, offered begrudging support for the central 
government's plans to meet the energy crisis, which the Chief 
Minister discussed with Prime Minister Gilani in a July 26 
summit in Lahore.  The PML-N has accepted the necessity of 
rental power projects, which will start in December and last for 
approximately three years.  He acknowledged, however, that 
rental power generation is an expensive and temporary fix.  In 
the medium-term, the federal government must take care of the 
"circular debt" problem, Hamza stated.  Finally, in the long 
term, the province and federal government must work together to 
identify viable power generation projects that could add to 
capacity.  "We need to move beyond Kalabagh and work together on 
other sites" that could generate electricity, he underlined. 
[Note: Kalabagh is a decades old proposal for a mega dam and 
hydro-electric project on the upper Indus River.  Punjab 
supports the controversial project but the other provinces are 
firmly opposed to it.  End Note.]  "India has added over 60 dams 
on its side; we need to do the same," he added. 
 
 
 
- - - 
 
PROVINCIAL EFFORTS TO ADD SUPPLY 
 
- - - 
 
 
 
LAHORE 00000164  002 OF 003 
 
 
 
4. (SBU) Punjab Secretary of Irrigation and Power Azam Khan told 
Econoff July 28 that Chief Minister Shahbaz Sharif has expressed 
concern about power outages since 2008, and had pressed for the 
Irrigation and Power Department to invigorate the power sector. 
In November 2008 the Chief Minister led a trade delegation to 
China where he signed several Memoranda of Understanding on 
economic cooperation, including one for work on hydroelectric 
power projects in the province.  Azam divulged that the province 
would likely select a Chinese firm for the 120MW Taunsa Barrage 
hydro-electric project now out to bid. 
 
 
 
5.  (U) The government of Punjab has initiated few power 
projects, Azam admitted, and most of those under consideration 
are still in the study or planning phases.  New generation that 
has reached the Request for Proposal (RFP) stage under 
provincial efforts totals 470MW, but none of that power will 
come on line soon.  In addition to Taunsa Barrage, the province 
has: 
 
     - Requested letters of interest for developing a 100MW 
power station to be located in the Chakwal/Khushab coal area. 
[Note: Post has conveyed a request for Trade and Development 
Assistance funds for the province to conduct a coal survey in 
the area.  End Note.] 
 
     - Requested letters of interest for 50MW captive power 
plants to serve each of four industrial estates in the province 
for a total contribution of 200MW. 
 
     - Requested letters of interest for developing a 48MW solar 
power plant in southern Punjab. 
 
     -  Identified 317 potential hydro-electric sites on 
existing Punjab canals and barrages that require feasibility 
studies which could contribute an estimated 600MW. 
 
     - Identified 48 potential new micro hydro-electric sites 
with a total of 350MW that still require feasibility studies. 
 
     - Hired consultants to study potential for wind power along 
a 250 kilometer corridor from Kallar Kahaar to Mianwali. 
 
 
 
[Note: The provincial government is allowed to lead the larger 
Taunsa Barrage and Chakwal/Khushab Coal projects because they 
are being developed as public private partnerships.  End Note.] 
Punjab's efforts may ease the electricity crisis in years ahead, 
but Khan cautioned that the province lacks the funds for 
feasibility studies and the expertise (and in some instances the 
authority) to lead power development projects. 
 
 
 
- - - 
 
PUNJAB IRRIGATION AND POWER DEPARTMENT: POWER IN NAME ONLY 
 
- - - 
 
 
 
6.  (SBU) Azam and a deputy, Muhammad Yaqoob, said that 
historically, the power side of the Punjab Irrigation and Power 
Department (PIPD) was "not active."  Finance and personnel have 
instead focused on the irrigation system, they recounted.  In 
spite of the Chief Minister's directive to target the power 
sector, Azam acknowledged that PIPD faced two significant 
hurdles to play a more effective role: 1) insufficient funds, 
either locally generated or from the central government, and 2) 
lack of talent to deliver the projects.  The federal government 
dominates the energy sector, he added.  All private sector power 
projects over 50MW are federal by definition, he explained, but 
even smaller projects that could theoretically be handled at the 
provincial level are effectively dependent on central government 
money and expertise.  Even hydro-electric projects placed in the 
Punjab irrigation system were driven by the federal Water and 
Power Development Authority (WAPDA).  The province has little 
technical talent on hand, Azam said, because the qualified labor 
 
LAHORE 00000164  003 OF 003 
 
 
available is drawn to the large programs and better compensation 
of the central government or private consultancies, leaving PIPD 
without the capacity to undertake power projects at the 
provincial level.  Mujtaba Piracha, Program Director of the 
Punjab Resource Management Program (PRMP) and the leader of 
capacity building efforts in the provincial government, offered 
the same assessment to Econoff in an interview in June.  He said 
PRMP mirrors the PIPD approach and remains largely focused on 
the richer talent pool dedicated to irrigation issues.   Azam 
added that PIPD "only wants to get into things which we know how 
to handle."  That actually excludes power opportunities 
envisioned under the law as provincial topics, including captive 
power and small biomass fueled cogeneration plants. 
 
 
 
- - - 
 
FEDERAL GOVERNMENT CONTROLS THE SWITCH, PLUGS INTO CORRUPTION 
 
- - - 
 
 
 
7.  (SBU) The dominant role of the central government means that 
potential power producers must at least coordinate with the 
federal bureaucracy.  Numerous sugar mill owners with an 
interest in cane processing byproduct ("bagasse") fired 
cogeneration power plants told an interagency delegation in May 
2009 that they could not advance their projects at the 
provincial level because the central government controlled the 
pricing and concessions mill owners were seeking.  Some 
expressed reservations about the transparency of the federal 
process, a concern raised by other post contacts as well. 
Members of two prominent business families told Econoff that 
they have slowed or stopped federal power projects in the past 
because of the expectation of bribes.  Both added that they 
viewed the provincial government as "significantly less 
corrupt." 
 
 
 
- - - 
 
COMMENT: PUNJAB SHOULD LOOK TO ENERGY EFFICIENCY TO AVOID A 
MELTDOWN 
 
- - - 
 
 
 
8.  (SBU) Comment:  The provincial government has extremely 
limited capacity to improve the power supply situation, but 
faces the same popular backlash as the federal government. As 
the central government follows through with the painful but 
necessary commitment to set electricity tariffs at the actual 
cost of service, provincial fears that public unrest will again 
boil over if blackouts continue are quite real.  Given 
provincial constraints, Punjab's best option may be to focus on 
the areas over which it can exert more influence: the demand 
side of the equation.  USAID and the Asian Development Bank have 
argued that energy efficiency initiatives could quickly and 
cheaply have a positive impact on Pakistan's power crisis, but 
the province has not seriously explored a campaign to change 
consumer behavior, nor support for efficiency programs at the 
regional distribution companies.  USAID is already working on a 
model project with the Multan Electric Supply Company to manage 
demand timing, improve efficiency, reduce theft, and boost 
revenue.  The project's impact could be enhanced by a 
coordinated partnership with the Punjab government.  A 
provincial focus on energy usage leaves the federal government 
solely responsible for addressing inadequate supplies.  With 
support from foreign assistance programs, Punjab could make a 
meaningful contribution to solving the energy problem.  End 
Comment. 
LOWE