Keep Us Strong WikiLeaks logo

Currently released so far... 251287 / 251,287

Articles

Browse latest releases

Browse by creation date

Browse by origin

A B C D F G H I J K L M N O P Q R S T U V W Y Z

Browse by tag

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
AEMR ASEC AMGT AE AS AMED AVIAN AU AF AORC AGENDA AO AR AM APER AFIN ATRN AJ ABUD ARABL AL AG AODE ALOW ADANA AADP AND APECO ACABQ ASEAN AA AFFAIRS AID AGR AY AGS AFSI AGOA AMB ARF ANET ASCH ACOA AFLU AFSN AMEX AFDB ABLD AESC AFGHANISTAN AINF AVIATION ARR ARSO ANDREW ASSEMBLY AIDS APRC ASSK ADCO ASIG AC AZ APEC AFINM ADB AP ACOTA ASEX ACKM ASUP ANTITERRORISM ADPM AINR ARABLEAGUE AGAO AORG AMTC AIN ACCOUNT ASECAFINGMGRIZOREPTU AIDAC AINT ARCH AMGTKSUP ALAMI AMCHAMS ALJAZEERA AVIANFLU AORD AOREC ALIREZA AOMS AMGMT ABDALLAH AORCAE AHMED ACCELERATED AUC ALZUGUREN ANGEL AORL ASECIR AMG AMBASSADOR AEMRASECCASCKFLOMARRPRELPINRAMGTJMXL ADM ASES ABMC AER AMER ASE AMGTHA ARNOLDFREDERICK AOPC ACS AFL AEGR ASED AFPREL AGRI AMCHAM ARNOLD AN ANATO AME APERTH ASECSI AT ACDA ASEDC AIT AMERICA AMLB AMGE ACTION AGMT AFINIZ ASECVE ADRC ABER AGIT APCS AEMED ARABBL ARC ASO AIAG ACEC ASR ASECM ARG AEC ABT ADIP ADCP ANARCHISTS AORCUN AOWC ASJA AALC AX AROC ARM AGENCIES ALBE AK AZE AOPR AREP AMIA ASCE ALANAZI ABDULRAHMEN ABDULHADI AINFCY ARMS ASECEFINKCRMKPAOPTERKHLSAEMRNS AGRICULTURE AFPK AOCR ALEXANDER ATRD ATFN ABLG AORCD AFGHAN ARAS AORCYM AVERY ALVAREZ ACBAQ ALOWAR ANTOINE ABLDG ALAB AMERICAS AFAF ASECAFIN ASEK ASCC AMCT AMGTATK AMT APDC AEMRS ASECE AFSA ATRA ARTICLE ARENA AISG AEMRBC AFR AEIR ASECAF AFARI AMPR ASPA ASOC ANTONIO AORCL ASECARP APRM AUSTRALIAGROUP ASEG AFOR AEAID AMEDI ASECTH ASIC AFDIN AGUIRRE AUNR ASFC AOIC ANTXON ASA ASECCASC ALI AORCEUNPREFPRELSMIGBN ASECKHLS ASSSEMBLY ASECVZ AI ASECPGOV ASIR ASCEC ASAC ARAB AIEA ADMIRAL AUSGR AQ AMTG ARRMZY ANC APR AMAT AIHRC AFU ADEL AECL ACAO AMEMR ADEP AV AW AOR ALL ALOUNI AORCUNGA ALNEA ASC AORCO ARMITAGE AGENGA AGRIC AEM ACOAAMGT AGUILAR AFPHUM AMEDCASCKFLO AFZAL AAA ATPDEA ASECPHUM ASECKFRDCVISKIRFPHUMSMIGEG
ETRD ETTC EU ECON EFIN EAGR EAID ELAB EINV ENIV ENRG EPET EZ ELTN ELECTIONS ECPS ET ER EG EUN EIND ECONOMICS EMIN ECIN EINT EWWT EAIR EN ENGR ES EI ETMIN EL EPA EARG EFIS ECONOMY EC EK ELAM ECONOMIC EAR ESDP ECCP ELN EUM EUMEM ECA EAP ELEC ECOWAS EFTA EXIM ETTD EDRC ECOSOC ECPSN ENVIRONMENT ECO EMAIL ECTRD EREL EDU ENERG ENERGY ENVR ETRAD EAC EXTERNAL EFIC ECIP ERTD EUC ENRGMO EINZ ESTH ECCT EAGER ECPN ELNT ERD EGEN ETRN EIVN ETDR EXEC EIAD EIAR EVN EPRT ETTF ENGY EAIDCIN EXPORT ETRC ESA EIB EAPC EPIT ESOCI ETRB EINDQTRD ENRC EGOV ECLAC EUR ELF ETEL ENRGUA EVIN EARI ESCAP EID ERIN ELAN ENVT EDEV EWWY EXBS ECOM EV ELNTECON ECE ETRDGK EPETEIND ESCI ETRDAORC EAIDETRD ETTR EMS EAGRECONEINVPGOVBN EBRD EUREM ERGR EAGRBN EAUD EFI ETRDEINVECINPGOVCS EPEC ETRO ENRGY EGAR ESSO EGAD ENV ENER EAIDXMXAXBXFFR ELA EET EINVETRD EETC EIDN ERGY ETRDPGOV EING EMINCG EINVECON EURM EEC EICN EINO EPSC ELAP ELABPGOVBN EE ESPS ETRA ECONETRDBESPAR ERICKSON EEOC EVENTS EPIN EB ECUN EPWR ENG EX EH EAIDAR EAIS ELBA EPETUN ETRDEIQ EENV ECPC ETRP ECONENRG EUEAID EWT EEB EAIDNI ESENV EADM ECN ENRGKNNP ETAD ETR ECONETRDEAGRJA ETRG ETER EDUC EITC EBUD EAIF EBEXP EAIDS EITI EGOVSY EFQ ECOQKPKO ETRGY ESF EUE EAIC EPGOV ENFR EAGRE ENRD EINTECPS EAVI ETC ETCC EIAID EAIDAF EAGREAIDPGOVPRELBN EAOD ETRDA EURN EASS EINVA EAIDRW EON ECOR EPREL EGPHUM ELTM ECOS EINN ENNP EUPGOV EAGRTR ECONCS ETIO ETRDGR EAIDB EISNAR EIFN ESPINOSA EAIDASEC ELIN EWTR EMED ETFN ETT EADI EPTER ELDIN EINVEFIN ESS ENRGIZ EQRD ESOC ETRDECD ECINECONCS EAIT ECONEAIR ECONEFIN EUNJ ENRGKNNPMNUCPARMPRELNPTIAEAJMXL ELAD EFIM ETIC EFND EFN ETLN ENGRD EWRG ETA EIN EAIRECONRP EXIMOPIC ERA ENRGJM ECONEGE ENVI ECHEVARRIA EMINETRD EAD ECONIZ EENG ELBR EWWC ELTD EAIDMG ETRK EIPR EISNLN ETEX EPTED EFINECONCS EPCS EAG ETRDKIPR ED EAIO ETRDEC ENRGPARMOTRASENVKGHGPGOVECONTSPLEAID ECONEINVEFINPGOVIZ ERNG EFINU EURFOR EWWI ELTNSNAR ETD EAIRASECCASCID EOXC ESTN EAIDAORC EAGRRP ETRDEMIN ELABPHUMSMIGKCRMBN ETRDEINVTINTCS EGHG EAIDPHUMPRELUG EAGRBTIOBEXPETRDBN EDA EPETPGOV ELAINE EUCOM EMW EFINECONEAIDUNGAGM ELB EINDETRD EMI ETRDECONWTOCS EINR ESTRADA EHUM EFNI ELABV ENR EMN EXO EWWTPRELPGOVMASSMARRBN EATO END EP EINVETC ECONEFINETRDPGOVEAGRPTERKTFNKCRMEAID ELTRN EIQ ETTW EAI ENGRG ETRED ENDURING ETTRD EAIDEGZ EOCN EINF EUPREL ENRL ECPO ENLT EEFIN EPPD ECOIN EUEAGR EISL EIDE ENRGSD EINVECONSENVCSJA EAIG ENTG EEPET EUNCH EPECO ETZ EPAT EPTE EAIRGM ETRDPREL EUNGRSISAFPKSYLESO ETTN EINVKSCA ESLCO EBMGT ENRGTRGYETRDBEXPBTIOSZ EFLU ELND EFINOECD EAIDHO EDUARDO ENEG ECONEINVETRDEFINELABETRDKTDBPGOVOPIC EFINTS ECONQH ENRGPREL EUNPHUM EINDIR EPE EMINECINECONSENVTBIONS EFINM ECRM EQ EWWTSP ECONPGOVBN
KFLO KPKO KDEM KFLU KTEX KMDR KPAO KCRM KIDE KN KNNP KG KMCA KZ KJUS KWBG KU KDMR KAWC KCOR KPAL KOMC KTDB KTIA KISL KHIV KHUM KTER KCFE KTFN KS KIRF KTIP KIRC KSCA KICA KIPR KPWR KWMN KE KGIC KGIT KSTC KACT KSEP KFRD KUNR KHLS KCRS KRVC KUWAIT KVPR KSRE KMPI KMRS KNRV KNEI KCIP KSEO KITA KDRG KV KSUM KCUL KPET KBCT KO KSEC KOLY KNAR KGHG KSAF KWNM KNUC KMNP KVIR KPOL KOCI KPIR KLIG KSAC KSTH KNPT KINL KPRP KRIM KICC KIFR KPRV KAWK KFIN KT KVRC KR KHDP KGOV KPOW KTBT KPMI KPOA KRIF KEDEM KFSC KY KGCC KATRINA KWAC KSPR KTBD KBIO KSCI KRCM KNNB KBNC KIMT KCSY KINR KRAD KMFO KCORR KW KDEMSOCI KNEP KFPC KEMPI KBTR KFRDCVISCMGTCASCKOCIASECPHUMSMIGEG KNPP KTTB KTFIN KBTS KCOM KFTN KMOC KOR KDP KPOP KGHA KSLG KMCR KJUST KUM KMSG KHPD KREC KIPRTRD KPREL KEN KCSA KCRIM KGLB KAKA KWWT KUNP KCRN KISLPINR KLFU KUNC KEDU KCMA KREF KPAS KRKO KNNC KLHS KWAK KOC KAPO KTDD KOGL KLAP KECF KCRCM KNDP KSEAO KCIS KISM KREL KISR KISC KKPO KWCR KPFO KUS KX KWCI KRFD KWPG KTRD KH KLSO KEVIN KEANE KACW KWRF KNAO KETTC KTAO KWIR KVCORR KDEMGT KPLS KICT KWGB KIDS KSCS KIRP KSTCPL KDEN KLAB KFLOA KIND KMIG KPPAO KPRO KLEG KGKG KCUM KTTP KWPA KIIP KPEO KICR KNNA KMGT KCROM KMCC KLPM KNNPGM KSIA KSI KWWW KOMS KESS KMCAJO KWN KTDM KDCM KCM KVPRKHLS KENV KCCP KGCN KCEM KEMR KWMNKDEM KNNPPARM KDRM KWIM KJRE KAID KWMM KPAONZ KUAE KTFR KIF KNAP KPSC KSOCI KCWI KAUST KPIN KCHG KLBO KIRCOEXC KI KIRCHOFF KSTT KNPR KDRL KCFC KLTN KPAOKMDRKE KPALAOIS KESO KKOR KSMT KFTFN KTFM KDEMK KPKP KOCM KNN KISLSCUL KFRDSOCIRO KINT KRG KWMNSMIG KSTCC KPAOY KFOR KWPR KSEPCVIS KGIV KSEI KIL KWMNPHUMPRELKPAOZW KQ KEMS KHSL KTNF KPDD KANSOU KKIV KFCE KTTC KGH KNNNP KK KSCT KWNN KAWX KOMCSG KEIM KTSD KFIU KDTB KFGM KACP KWWMN KWAWC KSPA KGICKS KNUP KNNO KISLAO KTPN KSTS KPRM KPALPREL KPO KTLA KCRP KNMP KAWCK KCERS KDUM KEDM KTIALG KWUN KPTS KPEM KMEPI KAWL KHMN KCRO KCMR KPTD KCROR KMPT KTRF KSKN KMAC KUK KIRL KEM KSOC KBTC KOM KINP KDEMAF KTNBT KISK KRM KWBW KBWG KNNPMNUC KNOP KSUP KCOG KNET KWBC KESP KMRD KEBG KFRDKIRFCVISCMGTKOCIASECPHUMSMIGEG KPWG KOMCCO KRGY KNNF KPROG KJAN KFRED KPOKO KM KWMNCS KMPF KJWC KJU KSMIG KALR KRAL KDGOV KPA KCRMJA KCRI KAYLA KPGOV KRD KNNPCH KFEM KPRD KFAM KALM KIPRETRDKCRM KMPP KADM KRFR KMWN KWRG KTIAPARM KTIAEUN KRDP KLIP KDDEM KTIAIC KWKN KPAD KDM KRCS KWBGSY KEAI KIVP KPAOPREL KUNH KTSC KIPT KNP KJUSTH KGOR KEPREL KHSA KGHGHIV KNNR KOMH KRCIM KWPB KWIC KINF KPER KILS KA KNRG KCSI KFRP KLFLO KFE KNPPIS KQM KQRDQ KERG KPAOPHUM KSUMPHUM KVBL KARIM KOSOVO KNSD KUIR KWHG KWBGXF KWMNU KPBT KKNP KERF KCRT KVIS KWRC KVIP KTFS KMARR KDGR KPAI KDE KTCRE KMPIO KUNRAORC KHOURY KAWS KPAK KOEM KCGC KID KVRP KCPS KIVR KBDS KWOMN KIIC KTFNJA KARZAI KMVP KHJUS KPKOUNSC KMAR KIBL KUNA KSA KIS KJUSAF KDEV KPMO KHIB KIRD KOUYATE KIPRZ KBEM KPAM KDET KPPD KOSCE KJUSKUNR KICCPUR KRMS KWMNPREL KWMJN KREISLER KWM KDHS KRV KPOV KWMNCI KMPL KFLD KWWN KCVM KIMMITT KCASC KOMO KNATO KDDG KHGH KRF KSCAECON KWMEN KRIC
PREL PINR PGOV PHUM PTER PE PREF PARM PBTS PINS PHSA PK PL PM PNAT PHAS PO PROP PGOVE PA PU POLITICAL PPTER POL PALESTINIAN PHUN PIN PAMQ PPA PSEC POLM PBIO PSOE PDEM PAK PF PKAO PGOVPRELMARRMOPS PMIL PV POLITICS PRELS POLICY PRELHA PIRN PINT PGOG PERSONS PRC PEACE PROCESS PRELPGOV PROV PFOV PKK PRE PT PIRF PSI PRL PRELAF PROG PARMP PERL PUNE PREFA PP PGOB PUM PROTECTION PARTIES PRIL PEL PAGE PS PGO PCUL PLUM PIF PGOVENRGCVISMASSEAIDOPRCEWWTBN PMUC PCOR PAS PB PKO PY PKST PTR PRM POUS PRELIZ PGIC PHUMS PAL PNUC PLO PMOPS PHM PGOVBL PBK PELOSI PTE PGOVAU PNR PINSO PRO PLAB PREM PNIR PSOCI PBS PD PHUML PERURENA PKPA PVOV PMAR PHUMCF PUHM PHUH PRELPGOVETTCIRAE PRT PROPERTY PEPFAR PREI POLUN PAR PINSF PREFL PH PREC PPD PING PQL PINSCE PGV PREO PRELUN POV PGOVPHUM PINRES PRES PGOC PINO POTUS PTERE PRELKPAO PRGOV PETR PGOVEAGRKMCAKNARBN PPKO PARLIAMENT PEPR PMIG PTBS PACE PETER PMDL PVIP PKPO POLMIL PTEL PJUS PHUMNI PRELKPAOIZ PGOVPREL POGV PEREZ POWELL PMASS PDOV PARN PG PPOL PGIV PAIGH PBOV PETROL PGPV PGOVL POSTS PSO PRELEU PRELECON PHUMPINS PGOVKCMABN PQM PRELSP PRGO PATTY PRELPGOVEAIDECONEINVBEXPSCULOIIPBTIO PGVO PROTESTS PRELPLS PKFK PGOVEAIDUKNOSWGMHUCANLLHFRSPITNZ PARAGRAPH PRELGOV POG PTRD PTERM PBTSAG PHUMKPAL PRELPK PTERPGOV PAO PRIVATIZATION PSCE PPAO PGOVPRELPHUMPREFSMIGELABEAIDKCRMKWMN PARALYMPIC PRUM PKPRP PETERS PAHO PARMS PGREL PINV POINS PHUMPREL POREL PRELNL PHUMPGOV PGOVQL PLAN PRELL PARP PROVE PSOC PDD PRELNP PRELBR PKMN PGKV PUAS PRELTBIOBA PBTSEWWT PTERIS PGOVU PRELGG PHUMPRELPGOV PFOR PEPGOV PRELUNSC PRAM PICES PTERIZ PREK PRELEAGR PRELEUN PHUME PHU PHUMKCRS PRESL PRTER PGOF PARK PGOVSOCI PTERPREL PGOVEAID PGOVPHUMKPAO PINSKISL PREZ PGOVAF PARMEUN PECON PINL POGOV PGOVLO PIERRE PRELPHUM PGOVPZ PGOVKCRM PBST PKPAO PHUMHUPPS PGOVPOL PASS PPGOV PROGV PAGR PHALANAGE PARTY PRELID PGOVID PHUMR PHSAQ PINRAMGT PSA PRELM PRELMU PIA PINRPE PBTSRU PARMIR PEDRO PNUK PVPR PINOCHET PAARM PRFE PRELEIN PINF PCI PSEPC PGOVSU PRLE PDIP PHEM PRELB PORG PGGOC POLG POPDC PGOVPM PWMN PDRG PHUMK PINB PRELAL PRER PFIN PNRG PRED POLI PHUMBO PHYTRP PROLIFERATION PHARM PUOS PRHUM PUNR PENA PGOVREL PETRAEUS PGOVKDEM PGOVENRG PHUS PRESIDENT PTERKU PRELKSUMXABN PGOVSI PHUMQHA PKISL PIR PGOVZI PHUMIZNL PKNP PRELEVU PMIN PHIM PHUMBA PUBLIC PHAM PRELKPKO PMR PARTM PPREL PN PROL PDA PGOVECON PKBL PKEAID PERM PRELEZ PRELC PER PHJM PGOVPRELPINRBN PRFL PLN PWBG PNG PHUMA PGOR PHUMPTER POLINT PPEF PKPAL PNNL PMARR PAC PTIA PKDEM PAUL PREG PTERR PTERPRELPARMPGOVPBTSETTCEAIRELTNTC PRELJA POLS PI PNS PAREL PENV PTEROREP PGOVM PINER PBGT PHSAUNSC PTERDJ PRELEAID PARMIN PKIR PLEC PCRM PNET PARR PRELETRD PRELBN PINRTH PREJ PEACEKEEPINGFORCES PEMEX PRELZ PFLP PBPTS PTGOV PREVAL PRELSW PAUM PRF PHUMKDEM PATRICK PGOVKMCAPHUMBN PRELA PNUM PGGV PGOVSMIGKCRMKWMNPHUMCVISKFRDCA PBT PIND PTEP PTERKS PGOVJM PGOT PRELMARR PGOVCU PREV PREFF PRWL PET PROB PRELPHUMP PHUMAF PVTS PRELAFDB PSNR PGOVECONPRELBU PGOVZL PREP PHUMPRELBN PHSAPREL PARCA PGREV PGOVDO PGON PCON PODC PRELOV PHSAK PSHA PGOVGM PRELP POSCE PGOVPTER PHUMRU PINRHU PARMR PGOVTI PPEL PMAT PAN PANAM PGOVBO PRELHRC

Browse by classification

Community resources

courage is contagious

Viewing cable 06JOHANNESBURG95, SOUTH AFRICA: SERIOUS POWER DISRUPTIONS IN THE WESTERN CAPE

If you are new to these pages, please read an introduction on the structure of a cable as well as how to discuss them with others. See also the FAQs

Understanding cables
Every cable message consists of three parts:
  • The top box shows each cables unique reference number, when and by whom it originally was sent, and what its initial classification was.
  • The middle box contains the header information that is associated with the cable. It includes information about the receiver(s) as well as a general subject.
  • The bottom box presents the body of the cable. The opening can contain a more specific subject, references to other cables (browse by origin to find them) or additional comment. This is followed by the main contents of the cable: a summary, a collection of specific topics and a comment section.
To understand the justification used for the classification of each cable, please use this WikiSource article as reference.

Discussing cables
If you find meaningful or important information in a cable, please link directly to its unique reference number. Linking to a specific paragraph in the body of a cable is also possible by copying the appropriate link (to be found at theparagraph symbol). Please mark messages for social networking services like Twitter with the hash tags #cablegate and a hash containing the reference ID e.g. #06JOHANNESBURG95.
Reference ID Created Released Classification Origin
06JOHANNESBURG95 2006-03-13 09:27 2011-08-30 01:44 UNCLASSIFIED Consulate Johannesburg
VZCZCXRO6452
RR RUEHDU RUEHMR
DE RUEHJO #0095/01 0720927
ZNR UUUUU ZZH
R 130927Z MAR 06
FM AMCONSUL JOHANNESBURG
TO RUEHC/SECSTATE WASHDC 4929
INFO RUEHJO/AMCONSUL JOHANNESBURG 1544
RUCPDOC/DEPT OF COMMERCE WASHINGTON DC
RHMFIUU/DEPT OF ENERGY WASHINGTON DC
RUCNSAD/SADC COLLECTIVE
RUEHBU/AMEMBASSY BUENOS AIRES 0001
UNCLAS SECTION 01 OF 03 JOHANNESBURG 000095 
 
SIPDIS 
 
SIPDIS 
STATE PASS USAID AND USGS 
 
E.O. 12958: N/A 
TAGS: ENRG PGOV ASEC SF
SUBJECT: SOUTH AFRICA: SERIOUS POWER DISRUPTIONS IN THE WESTERN CAPE 
 
REF: A) CAPETOWN 73, B)CAPETOWN 77, C) PRETORIA 618 
 
JOHANNESBU 00000095  001.2 OF 003 
 
 
1. SUMMARY:  (U) Recent power outages in the Western Cape have 
resulted in major financial losses in the retail and tourism 
industries, with the Cape Chamber of Commerce predicting losses 
in the millions.  Further outages and/or rolling blackouts are 
likely until Unit 1 of the Koeberg nuclear power station is 
brought back on line - potentially in May 2006.  Until then, 
state-owned electric utility Eskom will scramble to provide 
sufficient power to keep Cape homes and businesses functioning. 
Eskom and the Department of Public Enterprises are accelerating 
plans to build new power plants and recommission previously 
mothballed power stations to prevent further damage to business 
and South Africa's investment prospects.  Minister for Minerals 
and Energy Lindiwe Hendriks said on March 9 that logistical 
problems would not affect electricity provided to South Africa's 
neighbors. 
 
2. (U) On the political side, just one day before the March 1 
elections, Minister of Public Enterprises Alec Erwin said that 
the police and National Intelligence Agency (NIA) were 
investigating the damage at Koeberg, since the "the bolt that 
caused the generator's destruction did not get there by 
accident."  Erwin added the NIA was ready to bring criminal 
charges against individuals and that they were also looking at 
other power outages which could have been caused by sabotage. 
Opposition politicians from the Democratic Alliance (DA) said 
that Erwin's allegation amounted to an abuse of political power. 
 After substantial media and political furor, Erwin said on 
March 3 (two days after the ruling African National Congress 
(ANC) finished behind the Democratic Alliance (DA) in Cape Town 
elections) that references to sabotage had been media spin, and 
that he had not used the term sabotage.  END SUMMARY 
 
What Happened 
------------- 
 
3. (U) Since mid-November 2005, starting with the time when 
Koeberg's Unit 1 was first taken down for scheduled refueling, 
maintenance and modifications - leaving only Unit 2 in 
operation, the entire Western Cape province has been plagued by 
regular power outages.  According to Eskom spokesman, Fanie 
Zulu, these were initially of short duration and due to 
generation, transmission and distribution network breakdowns and 
overloads.  The immediate causes were identified as natural and 
technical events that coalesced to produce the blackouts.  These 
events included excess power through the lines, flashovers 
caused by mist and ash-dust coatings on insulators and 
sub-stations caused by the spate of bush fires in vulnerable 
areas. 
 
4. (U) Since mid-December, the Western Cape has been dependent 
on the 900 MW of electricity supplied by Unit 2 and some 2,200 
MW transferred from coal-fired power stations in Mpumulanga.  On 
January 19, Eskom's CEO Thulani Gcabashe announced that on 
Christmas Day, while in the process of being returned to 
service, Unit 1 generator set was damaged by a large loose bolt 
that had somehow gotten into the set.  Together with unrelated 
network faults, these set in motion a series of rolling 
blackouts throughout the province. 
 
5. (U) Gcabashe stated that Unit 1 was likely to remain down for 
between three and nine months while Eskom made repairs or found 
a replacement generator.  A spokesman for Koeberg said that 
security on maintenance, supervision and materials accounting 
had been strictly applied and that an investigation into how the 
bolt got into the generator was in progress. Sabotage and 
malicious intent were not ruled out. 
 
6. (U) Since February, Unit 2 has twice responded to system 
disturbances and insufficient power from Mpumulanga by removing 
itself from the system in controlled (programmed) shutdowns. 
These caused havoc to Cape Town's (and the region's) electricity 
supply.  The Cape Chamber of Business estimated that damage to 
the economy was in excess of $100 million, and that Eskom's 
reputation as a reliable energy provider was severely dented. 
Eskom board chairman Valli Moosa said it would take some time to 
get Unit 2 back to full capacity and that Eskom could currently 
only supply about 2,200 MW. 
 
Electricity in the Western Cape 
------------------------------- 
7. (U) The heart of the problem is that Cape Town lies some 
1,500 km from the major electricity supply center in Mpumulanga 
Province and that its demand for power exceeds available local 
supply.  The Western Cape has no natural energy resources and 
before 1984, when the Koeberg nuclear plant went on line, most 
of its electricity (and coal) was imported from Mpumulanga.  The 
long transmission line and rail route made electricity expensive 
and the distance at times created line instability resulting in 
 
JOHANNESBU 00000095  002.2 OF 003 
 
 
power outages in Cape Town.  The Koeberg nuclear power plant was 
built to remedy most of these short-comings.  It came online in 
1984 and is South Africa's only nuclear station.  The plant 
consists of two French-designed 920 MW reactors that have 
operated safely and efficiently for more than 20 years. 
 
8. (U) The Western Cape's daily demand for electricity averages 
about 3,700 MW, and peaks at around 5,100 MW in summer to 5,650 
MW in winter.  Supply is dependent on Koeberg's two reactor 
units which together supply a base load of 1,800 MW.  This is 
supplemented by the transfer of 2,000 to 3,000 MW (depending on 
the season and time of day) of power from plants in Mpumulanga. 
Transmission takes place over a 1,500 km, 400 kV line with a 
capacity of 3,500 MW - a secure load of about 2,900 MW.  Peaking 
or emergency power of some 1,500 MW is also available from two 
oil-fired gas turbine and two pump storage stations and two 
hydro plants. 
 
9. (U) With the full 1,800 MW from Koeberg the Western Cape 
needs to import a maximum of about 2,100 MW in summer and 2,500 
in winter, both comfortably within the transmission line 
capacity.  However, with one unit down imports become 3,000 and 
3,400 MW, respectively, which stretches the technical limits of 
transmission.  With both units out, the required imports for 
winter and summer (3,900 and 4,300 MW) exceed line capacity. 
 
Areas of Concern 
------------------- 
10. (U) The problem with reactor 1 being out of order is 
compounded by the fact that reactor 2 is running low on fuel and 
needs to be shut down for about 60 days for refueling and 
maintenance.  Eskom said that it will stretch Unit 2's reactor 
fuel cycle by running it at below capacity, hoping repairs to 
Unit 1 generator would be completed before reactor 2 runs out of 
fuel.  Nevertheless, Eskom estimates that the shortfall in 
supply to the Cape during the coming winter could be about 300 
MW, which will have to be catered for by scheduled supply side 
(load-shedding) and demand side (efficiency) management. 
 
Fallout 
------- 
11. (U) In the late February run up to the provincial elections, 
opposition political parties used the power problems in the 
Western Cape (the only hotly contested province) to attack the 
ANC-lead government.  Caught with little defense, Minister Erwin 
said that the National Intelligence Agency was investigating the 
damage at Koeberg and was expected to bring criminal charges 
shortly.  Erwin was widely quoted as saying that "the bolt that 
caused the generator's destruction did not get there by 
accident."  Minister for Minerals and Energy Lindiwe Hendricks 
made similar innuendos, saying that "the events (i.e. the power 
outages) curiously coincide with an important process in the 
democratic calendar of the country" and that "other forces are 
at play here." 
 
12. (U) DA leader Tony Leon characterized the comments - made by 
Erwin at a press conference in Cape Town on February 28 - as 
another example of the government's abuse of power, and ascribed 
the Koeberg damage to "negligence."  By March 3, Erwin denied 
reports that he said the reactor was sabotaged.  He said there 
was no evidence of a significant organized sabotage campaign, 
but that it was not an accident but an act of human 
instrumentality - "no one just dropped the bolt".  The 
accusations and counter-accusations continue in the media and 
parliament. 
 
13. (U) Concerns also revolve around the impact that the  power 
failures are having on the local economy and on investor 
confidence in Eskom's long-nurtured image as a low-cost, 
reliable supplier of quality electricity to South Africa's 
resource and manufacturing industries.  Questions concern 
Eskom's ability to deliver sufficient power for the country's 
economic expansion plans that include 6% GDP growth by 2010, and 
the soon-to-be-legislated Beneficiation Bill that aims to add 
value to the 70% of raw materials currently exported.  Both are 
heavily energy-dependent.  Mooted expansions in the resource 
industry include: BHP-Billiton's Mozal and Hillside aluminum 
plants in Maputo, Mozambique and KwaZulu-Natal, respectively; 
Alcan's potential new aluminum plant in the Eastern Cape; and 
major expansions in the platinum mining and ferro-alloy 
industries.  Failure by Eskom to ensure reliable and sufficient 
quantities of energy could severely impact these and other 
high-energy project plans. 
 
14. (U) A number of countries in the region import electricity 
from SA.  The potential squeeze on Eskom's generation capacity 
over the next few years, which was highlighted by the on-going 
blackouts in the Western Cape, has mobilized these countries 
into examining their energy vulnerabilities should SA reduce or 
 
JOHANNESBU 00000095  003.2 OF 003 
 
 
stop electricity exports. 
 
15. (U) Speaking at a regional hydropower conference, Minister 
for Minerals and Energy Lindiwe Hendriks said on March 9 that 
South Africa was not running out of power and that its internal 
problems should not affect supply to its neighbors.  Hendricks 
said that South Africa would not decide to cut down on its power 
supply agreements with Eskom's customers because of internal 
issues. 
 
Remedial Actions 
---------------- 
16. (U) Eskom executives and the Ministers of Public Enterprises 
and of Minerals and Energy have stated categorically that Eskom 
can and will be in the position to generate and deliver the 
power needs of the South African industry, given the huge 
amounts of capital that was budgeted for energy generation and 
infrastructure expansion over the next five to twenty years, 
amounting to some $20 billion.  Eskom claims that the Western 
Cape problems are unique, due to its location, lack of own 
energy resources, and the rapid expansion of demand for energy 
which is significantly beyond original estimates. 
 
17. (U) Thulani Gcabashe, Eskom's CEO said that Eskom was 
fast-tracking plans to build a combined cycle gas turbine 
generator in the Western Cape with a base load of between 1,800 
and 2,200 MW and that the board would make an investment 
decision in a couple of months.  Eskom also recently started 
building two peak-load oil-fired gas turbine generators, which 
would add 1,050 MW to the grid, and come on stream by April 
2007.  Similarly, the Department of Minerals and Energy has a 
tender out for two 500 MW Open Cycle Gas Turbine plants to be 
built in the region, but these will only be operational by about 
2008. 
 
18. (U) In the medium to longer term other options become 
available to the Western Cape, including the first unit of a 
pebble bed reactor (165 MW), power from the proposed natural 
gas-fired turbine plant in Namibia (using gas from the Kudu 
gasfield), and a similar 400 MW unit on the Cape west coast 
using natural gas from Forest Oil's Ibhubesi gas field.  The 
possibility of building a second conventional nuclear plant on 
the Koeberg site was also mention by Erwin. 
 
19. (U) Gcabashe and Erwin have agreed on the process for 
getting Unit 1 back on line.  The sequence would be to: borrow a 
200 ton rotor and stator bars from Electriciti de France and 
have the parts brought by barge to South Africa, probably within 
a month; synchronize Unit 1 with the power grid in the middle of 
May; refuel and service Unit 2 starting in the third week of May 
- there will be a week's overlap between starting of Unit 1 and 
the shutdown of Unit 2; run Unit 2 at decreasing power output 
over the next three months until stopped for refueling and 
maintenance towards the end of May; supply the electricity needs 
of the Western Cape from Mpumulanga.  During peak periods there 
could be a shortfall of some 300 MW, but Eskom is convinced that 
some 400 MW can be saved through demand-side and supply-side 
management innovations. 
 
20. (U) COMMENT: Eskom has stated on numerous occasions that the 
generation side of electricity supply is well under control (if 
somewhat tight under peak load conditions) and that the problem 
lies with a poorly maintained, old and out-of-date distribution 
infrastructure.  Most supply disruptions have resulted from 
equipment or line faults and are seldom due to insufficient 
generation capacity.  In addition, a number of transmission 
lines need upgrading to meet the ever increasing demand for 
power from an expanding economy and rapidly growing population 
base - some 70% of South Africans now have access to 
electricity, up from about 35% fifteen years ago. 
 
21. (U) Much of the blame rests with some 284 municipalities 
that buy bulk electricity from Eskom and distribute to 
rate-payers over their owned networks.  About 50% of 
municipalities have neither the skills nor resources to maintain 
their infrastructure.  To make matters worse, electricity 
revenues are used to cross-subsidize other services and not to 
maintain and renew equipment and systems.  As a consequence the 
SAG and Eskom developed the concept of regional electricity 
distributors (REDs) to overcome these problems.  Six REDs were 
to be established with pooled resources to cover the country and 
ensure stable, reliable and affordable electricity distribution. 
 The first mini-RED (the Cape Town Metro Area) went into 
operation on July 1 last year.  Unfortunately, legal and 
constitutional issues must be resolved before the next RED can 
be implemented.  An announcement on how to proceed is due this 
month.  END COMMENT. 