Keep Us Strong WikiLeaks logo

Currently released so far... 251287 / 251,287

Articles

Browse latest releases

Browse by creation date

Browse by origin

A B C D F G H I J K L M N O P Q R S T U V W Y Z

Browse by tag

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
AEMR ASEC AMGT AE AS AMED AVIAN AU AF AORC AGENDA AO AR AM APER AFIN ATRN AJ ABUD ARABL AL AG AODE ALOW ADANA AADP AND APECO ACABQ ASEAN AA AFFAIRS AID AGR AY AGS AFSI AGOA AMB ARF ANET ASCH ACOA AFLU AFSN AMEX AFDB ABLD AESC AFGHANISTAN AINF AVIATION ARR ARSO ANDREW ASSEMBLY AIDS APRC ASSK ADCO ASIG AC AZ APEC AFINM ADB AP ACOTA ASEX ACKM ASUP ANTITERRORISM ADPM AINR ARABLEAGUE AGAO AORG AMTC AIN ACCOUNT ASECAFINGMGRIZOREPTU AIDAC AINT ARCH AMGTKSUP ALAMI AMCHAMS ALJAZEERA AVIANFLU AORD AOREC ALIREZA AOMS AMGMT ABDALLAH AORCAE AHMED ACCELERATED AUC ALZUGUREN ANGEL AORL ASECIR AMG AMBASSADOR AEMRASECCASCKFLOMARRPRELPINRAMGTJMXL ADM ASES ABMC AER AMER ASE AMGTHA ARNOLDFREDERICK AOPC ACS AFL AEGR ASED AFPREL AGRI AMCHAM ARNOLD AN ANATO AME APERTH ASECSI AT ACDA ASEDC AIT AMERICA AMLB AMGE ACTION AGMT AFINIZ ASECVE ADRC ABER AGIT APCS AEMED ARABBL ARC ASO AIAG ACEC ASR ASECM ARG AEC ABT ADIP ADCP ANARCHISTS AORCUN AOWC ASJA AALC AX AROC ARM AGENCIES ALBE AK AZE AOPR AREP AMIA ASCE ALANAZI ABDULRAHMEN ABDULHADI AINFCY ARMS ASECEFINKCRMKPAOPTERKHLSAEMRNS AGRICULTURE AFPK AOCR ALEXANDER ATRD ATFN ABLG AORCD AFGHAN ARAS AORCYM AVERY ALVAREZ ACBAQ ALOWAR ANTOINE ABLDG ALAB AMERICAS AFAF ASECAFIN ASEK ASCC AMCT AMGTATK AMT APDC AEMRS ASECE AFSA ATRA ARTICLE ARENA AISG AEMRBC AFR AEIR ASECAF AFARI AMPR ASPA ASOC ANTONIO AORCL ASECARP APRM AUSTRALIAGROUP ASEG AFOR AEAID AMEDI ASECTH ASIC AFDIN AGUIRRE AUNR ASFC AOIC ANTXON ASA ASECCASC ALI AORCEUNPREFPRELSMIGBN ASECKHLS ASSSEMBLY ASECVZ AI ASECPGOV ASIR ASCEC ASAC ARAB AIEA ADMIRAL AUSGR AQ AMTG ARRMZY ANC APR AMAT AIHRC AFU ADEL AECL ACAO AMEMR ADEP AV AW AOR ALL ALOUNI AORCUNGA ALNEA ASC AORCO ARMITAGE AGENGA AGRIC AEM ACOAAMGT AGUILAR AFPHUM AMEDCASCKFLO AFZAL AAA ATPDEA ASECPHUM ASECKFRDCVISKIRFPHUMSMIGEG
ETRD ETTC EU ECON EFIN EAGR EAID ELAB EINV ENIV ENRG EPET EZ ELTN ELECTIONS ECPS ET ER EG EUN EIND ECONOMICS EMIN ECIN EINT EWWT EAIR EN ENGR ES EI ETMIN EL EPA EARG EFIS ECONOMY EC EK ELAM ECONOMIC EAR ESDP ECCP ELN EUM EUMEM ECA EAP ELEC ECOWAS EFTA EXIM ETTD EDRC ECOSOC ECPSN ENVIRONMENT ECO EMAIL ECTRD EREL EDU ENERG ENERGY ENVR ETRAD EAC EXTERNAL EFIC ECIP ERTD EUC ENRGMO EINZ ESTH ECCT EAGER ECPN ELNT ERD EGEN ETRN EIVN ETDR EXEC EIAD EIAR EVN EPRT ETTF ENGY EAIDCIN EXPORT ETRC ESA EIB EAPC EPIT ESOCI ETRB EINDQTRD ENRC EGOV ECLAC EUR ELF ETEL ENRGUA EVIN EARI ESCAP EID ERIN ELAN ENVT EDEV EWWY EXBS ECOM EV ELNTECON ECE ETRDGK EPETEIND ESCI ETRDAORC EAIDETRD ETTR EMS EAGRECONEINVPGOVBN EBRD EUREM ERGR EAGRBN EAUD EFI ETRDEINVECINPGOVCS EPEC ETRO ENRGY EGAR ESSO EGAD ENV ENER EAIDXMXAXBXFFR ELA EET EINVETRD EETC EIDN ERGY ETRDPGOV EING EMINCG EINVECON EURM EEC EICN EINO EPSC ELAP ELABPGOVBN EE ESPS ETRA ECONETRDBESPAR ERICKSON EEOC EVENTS EPIN EB ECUN EPWR ENG EX EH EAIDAR EAIS ELBA EPETUN ETRDEIQ EENV ECPC ETRP ECONENRG EUEAID EWT EEB EAIDNI ESENV EADM ECN ENRGKNNP ETAD ETR ECONETRDEAGRJA ETRG ETER EDUC EITC EBUD EAIF EBEXP EAIDS EITI EGOVSY EFQ ECOQKPKO ETRGY ESF EUE EAIC EPGOV ENFR EAGRE ENRD EINTECPS EAVI ETC ETCC EIAID EAIDAF EAGREAIDPGOVPRELBN EAOD ETRDA EURN EASS EINVA EAIDRW EON ECOR EPREL EGPHUM ELTM ECOS EINN ENNP EUPGOV EAGRTR ECONCS ETIO ETRDGR EAIDB EISNAR EIFN ESPINOSA EAIDASEC ELIN EWTR EMED ETFN ETT EADI EPTER ELDIN EINVEFIN ESS ENRGIZ EQRD ESOC ETRDECD ECINECONCS EAIT ECONEAIR ECONEFIN EUNJ ENRGKNNPMNUCPARMPRELNPTIAEAJMXL ELAD EFIM ETIC EFND EFN ETLN ENGRD EWRG ETA EIN EAIRECONRP EXIMOPIC ERA ENRGJM ECONEGE ENVI ECHEVARRIA EMINETRD EAD ECONIZ EENG ELBR EWWC ELTD EAIDMG ETRK EIPR EISNLN ETEX EPTED EFINECONCS EPCS EAG ETRDKIPR ED EAIO ETRDEC ENRGPARMOTRASENVKGHGPGOVECONTSPLEAID ECONEINVEFINPGOVIZ ERNG EFINU EURFOR EWWI ELTNSNAR ETD EAIRASECCASCID EOXC ESTN EAIDAORC EAGRRP ETRDEMIN ELABPHUMSMIGKCRMBN ETRDEINVTINTCS EGHG EAIDPHUMPRELUG EAGRBTIOBEXPETRDBN EDA EPETPGOV ELAINE EUCOM EMW EFINECONEAIDUNGAGM ELB EINDETRD EMI ETRDECONWTOCS EINR ESTRADA EHUM EFNI ELABV ENR EMN EXO EWWTPRELPGOVMASSMARRBN EATO END EP EINVETC ECONEFINETRDPGOVEAGRPTERKTFNKCRMEAID ELTRN EIQ ETTW EAI ENGRG ETRED ENDURING ETTRD EAIDEGZ EOCN EINF EUPREL ENRL ECPO ENLT EEFIN EPPD ECOIN EUEAGR EISL EIDE ENRGSD EINVECONSENVCSJA EAIG ENTG EEPET EUNCH EPECO ETZ EPAT EPTE EAIRGM ETRDPREL EUNGRSISAFPKSYLESO ETTN EINVKSCA ESLCO EBMGT ENRGTRGYETRDBEXPBTIOSZ EFLU ELND EFINOECD EAIDHO EDUARDO ENEG ECONEINVETRDEFINELABETRDKTDBPGOVOPIC EFINTS ECONQH ENRGPREL EUNPHUM EINDIR EPE EMINECINECONSENVTBIONS EFINM ECRM EQ EWWTSP ECONPGOVBN
KFLO KPKO KDEM KFLU KTEX KMDR KPAO KCRM KIDE KN KNNP KG KMCA KZ KJUS KWBG KU KDMR KAWC KCOR KPAL KOMC KTDB KTIA KISL KHIV KHUM KTER KCFE KTFN KS KIRF KTIP KIRC KSCA KICA KIPR KPWR KWMN KE KGIC KGIT KSTC KACT KSEP KFRD KUNR KHLS KCRS KRVC KUWAIT KVPR KSRE KMPI KMRS KNRV KNEI KCIP KSEO KITA KDRG KV KSUM KCUL KPET KBCT KO KSEC KOLY KNAR KGHG KSAF KWNM KNUC KMNP KVIR KPOL KOCI KPIR KLIG KSAC KSTH KNPT KINL KPRP KRIM KICC KIFR KPRV KAWK KFIN KT KVRC KR KHDP KGOV KPOW KTBT KPMI KPOA KRIF KEDEM KFSC KY KGCC KATRINA KWAC KSPR KTBD KBIO KSCI KRCM KNNB KBNC KIMT KCSY KINR KRAD KMFO KCORR KW KDEMSOCI KNEP KFPC KEMPI KBTR KFRDCVISCMGTCASCKOCIASECPHUMSMIGEG KNPP KTTB KTFIN KBTS KCOM KFTN KMOC KOR KDP KPOP KGHA KSLG KMCR KJUST KUM KMSG KHPD KREC KIPRTRD KPREL KEN KCSA KCRIM KGLB KAKA KWWT KUNP KCRN KISLPINR KLFU KUNC KEDU KCMA KREF KPAS KRKO KNNC KLHS KWAK KOC KAPO KTDD KOGL KLAP KECF KCRCM KNDP KSEAO KCIS KISM KREL KISR KISC KKPO KWCR KPFO KUS KX KWCI KRFD KWPG KTRD KH KLSO KEVIN KEANE KACW KWRF KNAO KETTC KTAO KWIR KVCORR KDEMGT KPLS KICT KWGB KIDS KSCS KIRP KSTCPL KDEN KLAB KFLOA KIND KMIG KPPAO KPRO KLEG KGKG KCUM KTTP KWPA KIIP KPEO KICR KNNA KMGT KCROM KMCC KLPM KNNPGM KSIA KSI KWWW KOMS KESS KMCAJO KWN KTDM KDCM KCM KVPRKHLS KENV KCCP KGCN KCEM KEMR KWMNKDEM KNNPPARM KDRM KWIM KJRE KAID KWMM KPAONZ KUAE KTFR KIF KNAP KPSC KSOCI KCWI KAUST KPIN KCHG KLBO KIRCOEXC KI KIRCHOFF KSTT KNPR KDRL KCFC KLTN KPAOKMDRKE KPALAOIS KESO KKOR KSMT KFTFN KTFM KDEMK KPKP KOCM KNN KISLSCUL KFRDSOCIRO KINT KRG KWMNSMIG KSTCC KPAOY KFOR KWPR KSEPCVIS KGIV KSEI KIL KWMNPHUMPRELKPAOZW KQ KEMS KHSL KTNF KPDD KANSOU KKIV KFCE KTTC KGH KNNNP KK KSCT KWNN KAWX KOMCSG KEIM KTSD KFIU KDTB KFGM KACP KWWMN KWAWC KSPA KGICKS KNUP KNNO KISLAO KTPN KSTS KPRM KPALPREL KPO KTLA KCRP KNMP KAWCK KCERS KDUM KEDM KTIALG KWUN KPTS KPEM KMEPI KAWL KHMN KCRO KCMR KPTD KCROR KMPT KTRF KSKN KMAC KUK KIRL KEM KSOC KBTC KOM KINP KDEMAF KTNBT KISK KRM KWBW KBWG KNNPMNUC KNOP KSUP KCOG KNET KWBC KESP KMRD KEBG KFRDKIRFCVISCMGTKOCIASECPHUMSMIGEG KPWG KOMCCO KRGY KNNF KPROG KJAN KFRED KPOKO KM KWMNCS KMPF KJWC KJU KSMIG KALR KRAL KDGOV KPA KCRMJA KCRI KAYLA KPGOV KRD KNNPCH KFEM KPRD KFAM KALM KIPRETRDKCRM KMPP KADM KRFR KMWN KWRG KTIAPARM KTIAEUN KRDP KLIP KDDEM KTIAIC KWKN KPAD KDM KRCS KWBGSY KEAI KIVP KPAOPREL KUNH KTSC KIPT KNP KJUSTH KGOR KEPREL KHSA KGHGHIV KNNR KOMH KRCIM KWPB KWIC KINF KPER KILS KA KNRG KCSI KFRP KLFLO KFE KNPPIS KQM KQRDQ KERG KPAOPHUM KSUMPHUM KVBL KARIM KOSOVO KNSD KUIR KWHG KWBGXF KWMNU KPBT KKNP KERF KCRT KVIS KWRC KVIP KTFS KMARR KDGR KPAI KDE KTCRE KMPIO KUNRAORC KHOURY KAWS KPAK KOEM KCGC KID KVRP KCPS KIVR KBDS KWOMN KIIC KTFNJA KARZAI KMVP KHJUS KPKOUNSC KMAR KIBL KUNA KSA KIS KJUSAF KDEV KPMO KHIB KIRD KOUYATE KIPRZ KBEM KPAM KDET KPPD KOSCE KJUSKUNR KICCPUR KRMS KWMNPREL KWMJN KREISLER KWM KDHS KRV KPOV KWMNCI KMPL KFLD KWWN KCVM KIMMITT KCASC KOMO KNATO KDDG KHGH KRF KSCAECON KWMEN KRIC
PREL PINR PGOV PHUM PTER PE PREF PARM PBTS PINS PHSA PK PL PM PNAT PHAS PO PROP PGOVE PA PU POLITICAL PPTER POL PALESTINIAN PHUN PIN PAMQ PPA PSEC POLM PBIO PSOE PDEM PAK PF PKAO PGOVPRELMARRMOPS PMIL PV POLITICS PRELS POLICY PRELHA PIRN PINT PGOG PERSONS PRC PEACE PROCESS PRELPGOV PROV PFOV PKK PRE PT PIRF PSI PRL PRELAF PROG PARMP PERL PUNE PREFA PP PGOB PUM PROTECTION PARTIES PRIL PEL PAGE PS PGO PCUL PLUM PIF PGOVENRGCVISMASSEAIDOPRCEWWTBN PMUC PCOR PAS PB PKO PY PKST PTR PRM POUS PRELIZ PGIC PHUMS PAL PNUC PLO PMOPS PHM PGOVBL PBK PELOSI PTE PGOVAU PNR PINSO PRO PLAB PREM PNIR PSOCI PBS PD PHUML PERURENA PKPA PVOV PMAR PHUMCF PUHM PHUH PRELPGOVETTCIRAE PRT PROPERTY PEPFAR PREI POLUN PAR PINSF PREFL PH PREC PPD PING PQL PINSCE PGV PREO PRELUN POV PGOVPHUM PINRES PRES PGOC PINO POTUS PTERE PRELKPAO PRGOV PETR PGOVEAGRKMCAKNARBN PPKO PARLIAMENT PEPR PMIG PTBS PACE PETER PMDL PVIP PKPO POLMIL PTEL PJUS PHUMNI PRELKPAOIZ PGOVPREL POGV PEREZ POWELL PMASS PDOV PARN PG PPOL PGIV PAIGH PBOV PETROL PGPV PGOVL POSTS PSO PRELEU PRELECON PHUMPINS PGOVKCMABN PQM PRELSP PRGO PATTY PRELPGOVEAIDECONEINVBEXPSCULOIIPBTIO PGVO PROTESTS PRELPLS PKFK PGOVEAIDUKNOSWGMHUCANLLHFRSPITNZ PARAGRAPH PRELGOV POG PTRD PTERM PBTSAG PHUMKPAL PRELPK PTERPGOV PAO PRIVATIZATION PSCE PPAO PGOVPRELPHUMPREFSMIGELABEAIDKCRMKWMN PARALYMPIC PRUM PKPRP PETERS PAHO PARMS PGREL PINV POINS PHUMPREL POREL PRELNL PHUMPGOV PGOVQL PLAN PRELL PARP PROVE PSOC PDD PRELNP PRELBR PKMN PGKV PUAS PRELTBIOBA PBTSEWWT PTERIS PGOVU PRELGG PHUMPRELPGOV PFOR PEPGOV PRELUNSC PRAM PICES PTERIZ PREK PRELEAGR PRELEUN PHUME PHU PHUMKCRS PRESL PRTER PGOF PARK PGOVSOCI PTERPREL PGOVEAID PGOVPHUMKPAO PINSKISL PREZ PGOVAF PARMEUN PECON PINL POGOV PGOVLO PIERRE PRELPHUM PGOVPZ PGOVKCRM PBST PKPAO PHUMHUPPS PGOVPOL PASS PPGOV PROGV PAGR PHALANAGE PARTY PRELID PGOVID PHUMR PHSAQ PINRAMGT PSA PRELM PRELMU PIA PINRPE PBTSRU PARMIR PEDRO PNUK PVPR PINOCHET PAARM PRFE PRELEIN PINF PCI PSEPC PGOVSU PRLE PDIP PHEM PRELB PORG PGGOC POLG POPDC PGOVPM PWMN PDRG PHUMK PINB PRELAL PRER PFIN PNRG PRED POLI PHUMBO PHYTRP PROLIFERATION PHARM PUOS PRHUM PUNR PENA PGOVREL PETRAEUS PGOVKDEM PGOVENRG PHUS PRESIDENT PTERKU PRELKSUMXABN PGOVSI PHUMQHA PKISL PIR PGOVZI PHUMIZNL PKNP PRELEVU PMIN PHIM PHUMBA PUBLIC PHAM PRELKPKO PMR PARTM PPREL PN PROL PDA PGOVECON PKBL PKEAID PERM PRELEZ PRELC PER PHJM PGOVPRELPINRBN PRFL PLN PWBG PNG PHUMA PGOR PHUMPTER POLINT PPEF PKPAL PNNL PMARR PAC PTIA PKDEM PAUL PREG PTERR PTERPRELPARMPGOVPBTSETTCEAIRELTNTC PRELJA POLS PI PNS PAREL PENV PTEROREP PGOVM PINER PBGT PHSAUNSC PTERDJ PRELEAID PARMIN PKIR PLEC PCRM PNET PARR PRELETRD PRELBN PINRTH PREJ PEACEKEEPINGFORCES PEMEX PRELZ PFLP PBPTS PTGOV PREVAL PRELSW PAUM PRF PHUMKDEM PATRICK PGOVKMCAPHUMBN PRELA PNUM PGGV PGOVSMIGKCRMKWMNPHUMCVISKFRDCA PBT PIND PTEP PTERKS PGOVJM PGOT PRELMARR PGOVCU PREV PREFF PRWL PET PROB PRELPHUMP PHUMAF PVTS PRELAFDB PSNR PGOVECONPRELBU PGOVZL PREP PHUMPRELBN PHSAPREL PARCA PGREV PGOVDO PGON PCON PODC PRELOV PHSAK PSHA PGOVGM PRELP POSCE PGOVPTER PHUMRU PINRHU PARMR PGOVTI PPEL PMAT PAN PANAM PGOVBO PRELHRC

Browse by classification

Community resources

courage is contagious

Viewing cable 05PARIS1052, PARIS CLUB - JANUARY 2005 TOUR D'HORIZON

If you are new to these pages, please read an introduction on the structure of a cable as well as how to discuss them with others. See also the FAQs

Understanding cables
Every cable message consists of three parts:
  • The top box shows each cables unique reference number, when and by whom it originally was sent, and what its initial classification was.
  • The middle box contains the header information that is associated with the cable. It includes information about the receiver(s) as well as a general subject.
  • The bottom box presents the body of the cable. The opening can contain a more specific subject, references to other cables (browse by origin to find them) or additional comment. This is followed by the main contents of the cable: a summary, a collection of specific topics and a comment section.
To understand the justification used for the classification of each cable, please use this WikiSource article as reference.

Discussing cables
If you find meaningful or important information in a cable, please link directly to its unique reference number. Linking to a specific paragraph in the body of a cable is also possible by copying the appropriate link (to be found at theparagraph symbol). Please mark messages for social networking services like Twitter with the hash tags #cablegate and a hash containing the reference ID e.g. #05PARIS1052.
Reference ID Created Released Classification Origin
05PARIS1052 2005-02-18 11:11 2011-08-30 01:44 UNCLASSIFIED//FOR OFFICIAL USE ONLY Embassy Paris
This record is a partial extract of the original cable. The full text of the original cable is not available.
UNCLAS SECTION 01 OF 13 PARIS 001052 
 
SIPDIS 
 
SENSITIVE 
 
STATE FOR EB/IFD 
TREASURY FOR DO/IDD AND OUSED/IMF 
SECDEF FOR USDP/DSAA 
PASS EXIM FOR CLAIMS -- EDELARIVA 
PASS USDA FOR CCC -- ALEUNG/DERICKSON/KCHADWICK 
PASS USAID FOR CLAIMS 
PASS DOD FOR DSCS -- PBERG 
 
E.O. 12958: N/A 
TAGS: EFIN ECON EAID XM XA XH XB XF FR
SUBJECT: PARIS CLUB - JANUARY 2005 TOUR D'HORIZON 
 
 
SENSITIVE BUT UNCLASSIFIED.  NOT FOR INTERNET DISTRIBUTION 
 
-------- 
SUMMARY 
-------- 
 
1. (U) Following are summaries of country discussions during 
the January 12-13, 2005 Paris Club session.  The Paris Club's 
President, Jean-Pierre Jouyet, chaired the session.  Secretary 
General (SecGen) Emmanuel Moulin represented the Secretariat. 
Representatives of non-Paris Club members Brazil, Israel and 
Korea attended discussions on those countries to which they 
are creditors.  The next session of the Paris Club is 
scheduled for the week of March 7, 2005. 
 
2. (U) NOTE: INDIVIDUAL CREDITOR POSITIONS REPORTED IN THIS 
MESSAGE SHOULD BE TREATED AS "PARIS CLUB CONFIDENTIAL" AND 
NOT/NOT DISCUSSED WITH DEBTOR COUNTRY REPRESENTATIVES, NOR 
WITH NON-PARIS CLUB PARTICIPANTS. 
 
3. (SBU) Discussed in this session: 
 
Algeria -- Implementation of bilateral agreements 
Angola -- IMF Update (Brazil) 
Argentina -- Perspectives for upcoming negotiation 
       (Israel) 
Chad - IMF update, extension of the current agreement 
Dominican Republic -- IMF Update, comparability of 
     treatment issues, financing assurances 
Haiti -- IMF update 
Honduras -- IMF update 
Iraq -- EDR tables 
Kyrgyz Republic - IMF update, financing assurances 
(Turkey) 
Nigeria -- 2005 debt repayment schedule (Brazil) 
Peru -- buyback, Secretariat report (Brazil) 
Poland -- prepayments (Brazil) 
Russia -- buyback proposal 
Rwanda -- IMF update 
Serbia and Montenegro - - IMF update 
Vietnam -- update 
Zambia -- IMF update 
 
4. (U) ACTION/FOLLOW-UP/UPCOMING ITEMS 
Methodology -- Possible publication of rules concerning 
buybacks and prepayments 
 
March negotiation -- Kyrgyz Republic, pending Russian 
financing assurances; Peru buyback 
 
 
April negotiation --potential Honduras, Zambia and Rwanda HIPC 
treatments, potential DR debt rescheduling 
 
TBD negotiation -- Russia buyback 
 
------- 
ALGERIA 
------- 
5. (SBU) The IMF rep said the Board was considering that same 
day the results from the 2004 Article IV consultations.  On 
December 21 staff presented its report, with a debt 
sustainability analysis in it. 
 
6. (SBU) Russia said its debt is still unsettled after two 
years of talks.  The Algerians do not want to accept the 1995 
Agreed Minute nor the terms of Russia's agreement on joining 
the Paris Club.  Russia still hopes to settle the debt 
pursuant to Paris Club rules, and plans another round of talks 
in the first quarter of 2005.  The Paris Club should not 
accept any buybacks because Russia has not gotten a single 
payment from Algeria in seven years, and should remind Algeria 
to pay up per Paris Club rules.  The UK said it has 1.9 
million in arrears on short-term debt, Algeria is not 
responding, and so it would like to be mentioned in any letter 
too.  Italy said it also has a dispute about old claims, but 
would prefer to be mentioned separately from the Russians. 
Spain said it also has arrears, and will confirm later the 
amount.  Responding to an inquiry from the Netherlands, the 
Secretariat explained that the 1997 Memorandum of 
 
SIPDIS 
Understanding admitting Russia to the Paris Club, provided it 
would grant an upfront discount of 35 percent to its eligible 
debtors, up to 65 percent for those countries to which Russia 
was the biggest military supplier.  Algeria contends Russia 
was its biggest military supplier, but never provided any 
proof.  The Secretariat proposed that Algeria send its data to 
the Secretariat for verification. 
 
7. (SBU) The President noted the consensus to have the 
Secretariat draft separate letters reminding Algeria to clear 
 
SIPDIS 
its arrears and proposing settlement of the Russian claims 
with verification through the Secretariat. 
 
------- 
ANGOLA 
------- 
8. (SBU) The IMF reported that staff plan to visit on January 
19; this trip is pending IMF receipt of GOA financial 
documents on SONANGOL and details about external debt 
negotiations with bilateral creditors.  Economic performance 
has improved; on the debt side, Portuguese banks opened a 
credit line for USD 100 million on November 19, and the GoA is 
talking to Bulgaria about its USD 68.8 million debt and with 
Hungary on its USD 5.7 million debt (as of June 2004).  The 
World Bank rep said the Bank hopes to present a strategy on 
February 17, conditioned on an IMF agreement and conclusion of 
a Poverty Reduction Strategy Paper (PRSP). 
 
9. (SBU) The Secretariat said it had contacted the GoA Finance 
Minister late last year, and had said the Secretariat would be 
available to explain Paris Club rules and expectations.  The 
Finance Minister had welcomed the call, and arranged for a 
delegation to visit Paris on January 17. 
 
10.  (SBU) Spain expressed its thanks for the Secretariat's 
actions. 
 
--------- 
ARGENTINA 
--------- 
11. (SBU) The IMF indicated it had seen press reports that the 
GoA is considering not continuing with an IMF program after 
its private bond exchange is completed, but has had no 
official word.  The President of the Paris Club proposed 
delaying action on a letter to the GoA until the close of the 
GOA's bond exchange. 
 
12. (SBU) Germany said since it had been the one to originally 
propose sending a letter, it wants to make the point that 
Argentina has made no payments for three years thus turning it 
into a de facto deferral.  It is necessary to demand payment. 
It is not very happy to delay a letter for another 6 to 8 
weeks.  Argentina does not want another IMF program.  It wants 
to pay the remaining balance of its obligations to the Fund 
and then end its relationship with the IMF.  Without a 
program, the Paris Club does not reschedule debt, and so it 
would not be possible to invite the GoA for a negotiation. 
 
13.  (SBU) Noting the acquiescence among creditors, the 
President said he would have the Secretariat circulate a draft 
letter in a few weeks.  The IMF added that the Argentine debt 
offering is expected to close on February 25; absent any 
official notification to the contrary, the Fund does expect 
the GOA to request a resumption of IMF support due to the 
large amount coming due to the IMF in 2005. 
 
---- 
CHAD 
---- 
14. (SBU) The Chair reminded creditors that Chad reached its 
HIPC decision point in May 2001 but went off track of its 
PRGF; Cologne terms are possible if it gets back on track. 
The IMF reported that talks began in August for a PRGF.  The 
GoC has taken a range of measures.  In November 2004, 
agreement was reached for a 3-year program at 45 percent of 
quota.  Executive Board discussion is scheduled February 7. 
Staff indicated the GoC has completed all prior actions 
including clearance of arrears on non-rescheduable debt.  The 
GoC also made progress on HIPC triggers, and has said it will 
do everything possible to get to HIPC completion point in 
2005.  Its economic performance is much better thanks to high 
oil income.  It will be stabilizing by 2023 at a debt to 
export ratio around 85 percent.  The Secretariat closed the 
discussion with the observation that good economic performance 
does not alter HIPC triggers. 
 
------------------ 
DOMINICAN REPUBLIC 
------------------ 
15. (SBU) The IMF reported that late last month, Fund 
management approved a memorandum of economic policy.  The GoDR 
requested a 28-month Standby Arrangement at 85 percent of 
quota, canceling the current standby.  Assuming the Paris Club 
agrees to financing assurances, staff will prepare a memo for 
Board consideration on January 31.  The GODR reports it 
completed all 16 required prior actions listed in the staff 
report.  A rescheduling is required due to deficits on the 
fiscal side with debt servicing obligations, not problems with 
the balance of payments.  It needs a USD 800 million package, 
sourced from bond restructuring, private sector debt 
restructuring, IDB funds, a concessional deal from Venezuela, 
banks, and the Paris Club.  The GoDR claimed to have made 
payments to eliminate its stock of arrears.  It is 
implementing its bond restructuring.  It did a road show to 
meet with commercial banks, which reacted amenably.  It is 
preparing a prospectus for bondholders for an exchange offer 
to be presented over the next few weeks.  The World Bank rep 
stated that the Bank had approved an adjustment loan in 2004, 
and it is engaged in talks now on a new country assistance 
strategy that would go to the Board in May or June 2005. 
 
16. (SBU) The Secretariat reviewed the timetable, and urged 
the Paris Club to avoid last year's scenario, where 
comparability of treatment (CoT) proved elusive.  The 
Secretariat urged financing assurances be conditioned on CoT, 
 
SIPDIS 
and/or it could envision financing assurances granted only for 
the first year to see what might be the results. 
 
17.  (SBU) The USDEL noted that the GoDR still had a very 
small amount of arrears that had not been cleared; endorsed 
conditioning financing assurances on CoT and putting them on a 
one-year leash; and inquired whether the financing gap may be 
somewhat smaller due to likely additional private financing 
that the GODR had secured. 
 
18. (SBU) Spain reported the GoDR had arrears last year of USD 
16 million, now the amount is only one million.  It is wise to 
link financing assurances to CoT plus clearance of arrears 
plus a one-year limit. 
 
19. (SBU) The UK reported all arrears cleared, and all its 
claims are post-ccod so it would be participating in the 
upcoming negotiation only as an observer. 
 
20. (SBU) Canada reported USD 200,000 arrears, and agrees with 
Spain on the proposals regarding financing assurances. 
 
21. (SBU) Norway has a problem with the DR, since it has a 
loan in technical default for a dam project.  Negotiations 
continue, with hopes for conclusion in February, but if the 
dispute is not settled Norway will have considerable claims in 
default: USD 35 million.  It agrees with Spain on financing 
assurances, and does not want to invite the GoDR to 
negotiations if arrears exist. 
 
22. (SBU) Japan has USD 6 million in arrears; supports the 
three conditions on financing assurances. 
 
23. (SBU) Italy has 2.3 million arrears about to be paid, 
[which the GODR says it will paid shortly].   Its claims are 
only post-ccod, so it would be participating in the upcoming 
negotiation only as an observer. 
 
24. (SBU) Sweden has only post-ccod debt, and agrees with 
Norway.  The GOS is also a partner in the dam project with 
Norway, which has not been settled yet. 
 
25. (SBU) Germany has two small accounts in arrears, and 
supports the three conditions on financing assurances. 
 
26. (SBU) France agrees to the three conditions, and has 12 
million euros in technical arrears. 
 
27. (SBU) Responding to the inquiry about the size of the 
financing gap, the IMF confirmed that due to better fiscal 
performance, the gap will be about USD 327 million, since the 
non-financial sector public balance was 80 million stronger 
than anticipated.  IDB funds are 50 million higher in 2005, 
somewhat offsetting a 20 million decrease resulting from a 
shift in benefits to 2006 of certain benefits from the 
Venezuelan deal. The commercial bank deal has not 
materialized.  The IMF raised practical questions, namely, 
does the exchange offer need to close for CoT, and given that 
the IMF does not tolerate arrears to official creditors, if 
financing assurances are for 2005 only, would the Paris Club 
have two negotiations? 
 
28. (SBU) The Secretariat aligned itself with the USDEL 
remarks, saying creditors need a better idea of the 2006 
financing gap.  A March invitation would be premature; April 
might be better to give creditors a chance to learn the 
evolution of the exchange offer. 
----- 
HAITI 
----- 
29. (SBU) The IMF said an EPCA was prepared on January 10, in 
part based on Paris Club forbearance.  If security permits, a 
mission will return the week of January 17 to assist with 
institution building and lay the groundwork for a program. 
 
30.  (SBU) In the absence of the World Bank rep, the 
Secretariat reported for the World Bank that all arrears were 
 
SIPDIS 
cleared on January 6, thanks to a Citibank loan.  Immediately 
thereafter the World Bank approved assistance of USD 61 
million for reconstruction and USD 12 million for natural 
resource management, 51 percent in grant form. The Secretariat 
will await the EPCA.  It indicated some creditors (e.g., 
France) have indicated they will not apply penalties in 
recognition of the political turmoil. 
 
-------- 
HONDURAS 
-------- 
31. (SBU) The IMF reported a mission will visit in late 
January to discuss a second PRGF review, HIPC triggers, and 
Article IV consultations.  March may be too early for a Paris 
Club negotiation since the Board is not likely to discuss 
Honduras until just after the Paris Club session. 
 
32. (SBU) The Secretariat suggested it would try to schedule 
Honduras for a negotiation in April. 
 
---- 
IRAQ 
---- 
33. (SBU) The Chair invited creditors to attend the 
information session scheduled the following day for non-Paris 
Club creditors. 
 
34. (SBU) The USDEL reported it had signed its bilateral 
agreement with the IIG, and had cancelled 100 percent of Iraq 
debt upfront, with no further obligations.  On the EDR tables, 
the USDEL still has concerns about the methodology, and hopes 
to circulate a paper by the next session. 
35. (SBU) The Chair noted the methodology is the same as that 
used for the HIPC countries, and proposed that the tables be 
initialed, de-linking them from later methodological 
discussions.  Creditors agreed.  In a parting observation, the 
Chair noted that canceling all debts is on the margin of 
acceptable Paris Club behavior, since normally conditionality 
is observed, and creditors wait until other creditors 
implement their accords. 
--------------- 
KYRGYZ REPUBLIC 
--------------- 
36. (SBU) Russia blocked financing assurances for the Kyrgyz's 
follow-on PRGF and request for an extension Kyrgyz's 
consolidation period (to correspond with the extension of the 
current PRGF).  Russia would not agree to extend the 
consolidation period or financing assurances, demanding that 
Kyrgyz first clear $220,000 in arrears to Russia.  The 
Secretariat pointed out the inconsistency of Russia's 
 
SIPDIS 
position: by agreeing to extend the consolidation period, 
Russia was effectively folding the arrears into the previous 
rescheduling.  The Russian delegate said he would check with 
Moscow and get back to the Secretariat to confirm Russia's 
position.  In the meantime, the IMF plans to issue the staff 
paper for the follow-on PRGF in late January or early February 
(the paper will indicate that financing assurances are still 
pending).  Assuming financing assurances are in place, Kyrgyz 
will be invited to the March Paris Club meeting, at which time 
creditors will negotiate the terms of a stock treatment.  Most 
creditors seemed amenable to a significant concessional stock 
treatment, but wanted the IMF to provide further analysis on 
alternative debt reduction scenarios (for example, under 
London and Toronto terms). 
 
------- 
NIGERIA 
------- 
37. (SBU) The IMF reported it will hold Article IV 
consultations on March 4, and will do a new debt 
sustainability analysis.  After the 2005 budget is approved, 
staff will visit Abuja to help the GoN design a new 
macroeconomic policy framework. 
38. (SBU) The Secretariat reported on its preliminary meeting 
on allocating 2005 payments, and noting it wished to avoid 
airing the arguments again, said it would work on a proposal 
to see how increased payments under the 2004 formula might 
satisfy all creditors (although the GON has not agreed to 
increase payments above the $1B threshold). 
 
39. (SBU) Determined to air its objection, Germany said it is 
unwilling to return to the 2004 compromise.  It is not at all 
optimistic that increased payments are likely, given the vague 
answer from the Nigerian Finance Minister the day before.  It 
can, however, go along with the Secretariat proposal.  The 
Netherlands and Italy took the same position as Germany. 
Germany added that it would like to hear more at the next 
session about how Nigeria's NEEDS program would compare to an 
upper credit tranche Fund programsince conditionality is a big 
deal for the Paris Club.  The IMF rep commented that its rules 
on enhanced surveillance have been made much more specific 
since the Finance Minister departed her employment at the WB. 
Further, the IMF rep stated for the record that the Fund's 
agreement on enhanced surveillance for Nigeria was not an 
"endorsement" of the GON's program as equivalent to the usual 
upper credit tranche program, which is required for a Paris 
Club treatment. 
 
40. (SBU) The Chair noted the consensus on procedure, and 
directed the Secretariat to crunch the numbers and have a 
working paper ready for the next session. 
 
---- 
PERU 
---- 
41. (SBU) The IMF reported a mission would visit in mid 
February for a second review under the current precautionary 
standby arrangement.  The World Bank reported that the economy 
is doing well; the main risk is political. 
 
42.  (SBU) The Chair reported on the Peruvian request for a 
buyback.  It has offered USD 1.5 billion for previously 
rescheduled debt, to reduce its debt profile, by the second 
half of 2005.  It proposes a March negotiation. The key is 
methodology.  Peru argues the right price is net present 
value, but the rate includes three components: political risk, 
country spread, and a liquidity premium for cash.  Peru wants 
to cap the buyback price at par.  For the Paris Club, a 
liquidity premium is debatable, and not consistent with the 
appropriate market rate.  Essentially, Peru wants a 
rescheduling of its debt without rescheduling.  The Chair 
circulated a draft reply. 
 
43. (SBU) Spain agreed there is no case for a liquidity 
premium.  It is not sure about a cap at face value, since 
giving a choice between a buyback and prepayment leads to the 
same thing as a cap.  The Secretariat argued that the problem 
is that a cap allows Peru to select among creditors.  If a cap 
is put on the price, than those creditors with higher rates 
are penalized.  That is why a market rate is needed, so that 
the terms are the same for all, with creditors free to accept 
or refuse. 
 
44. (SBU) The Chair noted the consensus to send the letter to 
Peru. 
 
------ 
POLAND 
------ 
45. (SBU) The IMF had nothing to add.  The Secretariat noted 
that the Poles made an offer, and that it had communicated to 
them the methodology agreed upon in the December session.  The 
Poles now need to know who is participating so they can 
prepare financials.  So far, the Secretariat has not told them 
who is participating per the Belgian request. 
 
46. (SBU) France still has no position about participation. 
Italy will not participate.  Canada has two agencies that will 
participate, but its Wheat Board will not.  Finland will 
participate.  The UK intends to participate but does not yet 
have authorization; it hopes to get it within a week.  Sweden 
will participate.  The USDEL said it might participate. 
Norway said it still knows nothing, requested a deadline, and 
asked what to do with debt for ecology swaps.  Spain does not 
know yet.  Denmark will have an answer in a week. 
 
47. (SBU) Jouyet set a deadline of January 21 for creditors to 
advise the Secretariat whether they are in or out of the 
prepayment arrangement. 
 
------ 
RUSSIA 
------ 
48. (SBU) An anticipated negotiation to effect Russia's 
proposal to buy back as much as USD 12 billion of debt owed to 
Paris Club creditor countries did not take place as Russia 
abruptly called for a postponement.  The Russian head of 
delegation explained that there were still big differences 
between Russia and its creditors regarding the general 
parameters for negotiating the buyback operation, but hoped to 
be able to narrow them over the next several weeks to make a 
negotiation possible. 
 
------ 
RWANDA 
------ 
49. (SBU) The IMF reported that a mission is working on a 
fourth PRGF review (not complete), and got agreement on a 
medium-term framework.  Its program is on track but there are 
issues about 2005 spending.  There is too much non-essential 
spending, e.g., a hotel project, loans to civil servants, new 
aircraft purchases.  If the fourth review is successfully 
concluded, staff could bring Rwanda to the Board in late March 
for a decision on completion point.  Much of the technical 
work on a debt sustainability analysis has already been 
completed.  Preliminary analysis indicates a significant need 
for topping up. 
 
--------------------- 
SERBIA AND MONTENEGRO 
--------------------- 
50. (SBU) While the IMF has some concerns about the current 
account deficit and inflation, the GoS&M have adopted a policy 
package to address the concerns, which has led to substantial 
fiscal tightening.  Presentation of the fifth review and 
Article IV consultations is scheduled for the Board in April. 
 
51. (SBU) Russia reported Serbia has USD 1.68 million in 
arrears, and asked if the Secretariat would prepare a letter 
reminding Serbia to clear arrears. 
 
52. (SBU) The Chair, noting the consensus, directed the 
Secretariat to prepare a letter. 
 
SIPDIS 
 
------- 
VIETNAM 
------- 
53. (SBU) The IMF reported that the 3rd PRGF expired April 
2004.  No follow-up program was contemplated.  The Board 
discussed Article IV consultations on November 22, 2004. 
Vietnam is not a HIPC-eligible country so there is no follow- 
up on the debt side.  Its NPV debt to export ratio is 39 
percent according to 2003 data. 
 
54. (SBU) Norway reported that on November 2, 2004, it signed 
a declaration of intent to do a debt for development swap, 
probably including debt forgiveness.  They have invited the 
International Fund for Agricultural Development to 
participate.  The beneficiary is a decentralized agricultural 
board.  The deal covers all claims, which total USD 5.7 
million.  All are non-ODA commercial export credits, all 
development-oriented.  All will be forgiven if Vietnam spends 
all on development.  This will be one single transaction to 
fund two years of the program.  Norway hopes to conclude the 
transaction in February or March. 
 
55. (SBU) Under the existing standard debt swap provision, 
creditors are limited to the amount of non-concessional debt 
they can be included in a debt swap operation.  The 
Secretariat noted that Norway had exceeded that threshold, 
 
SIPDIS 
however no creditors objected.  The Chair thanked Norway for 
the information. 
 
------ 
ZAMBIA 
------ 
56.  (SBU) The IMF reported that there is a fairly high 
probability of reaching HIPC completion point in March. A 
mission to conduct the 2nd review under its PRGF is scheduled 
at the end of January.  The program is on track so there 
should be no hold up at the Board meeting.  Nevertheless, 
there is one complication regarding data.  Zambia has a 
serious debt management problem.  During an October conversion 
of debt management software, large amounts of data were wiped 
out and totally lost.  Reconciliation is ongoing, and the IMF 
hopes to have an accounting basis upon which to complete its 
debt sustainability analysis.  The IMF hopes the Club can help 
with the reconciliation process, particularly regarding US 
PL480 loans and Japan. 
 
57. (SBU) Russia said it has considerable arrears, totaling 
USD 30.7 million in post-ccod from October 2004 maturities. 
In June 2004, the Club agreed to extend the 2002 Agreed Minute 
to June 2005, if all arrears are paid; therefore the debtor 
should be informed to clear its arrears. It also asked if 
topping up would be needed; the IMF replied probably not. 
 
58.  (U) Baghdad minimize considered. 
LEACH