Keep Us Strong WikiLeaks logo

Currently released so far... 251287 / 251,287

Articles

Browse latest releases

Browse by creation date

Browse by origin

A B C D F G H I J K L M N O P Q R S T U V W Y Z

Browse by tag

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
AEMR ASEC AMGT AE AS AMED AVIAN AU AF AORC AGENDA AO AR AM APER AFIN ATRN AJ ABUD ARABL AL AG AODE ALOW ADANA AADP AND APECO ACABQ ASEAN AA AFFAIRS AID AGR AY AGS AFSI AGOA AMB ARF ANET ASCH ACOA AFLU AFSN AMEX AFDB ABLD AESC AFGHANISTAN AINF AVIATION ARR ARSO ANDREW ASSEMBLY AIDS APRC ASSK ADCO ASIG AC AZ APEC AFINM ADB AP ACOTA ASEX ACKM ASUP ANTITERRORISM ADPM AINR ARABLEAGUE AGAO AORG AMTC AIN ACCOUNT ASECAFINGMGRIZOREPTU AIDAC AINT ARCH AMGTKSUP ALAMI AMCHAMS ALJAZEERA AVIANFLU AORD AOREC ALIREZA AOMS AMGMT ABDALLAH AORCAE AHMED ACCELERATED AUC ALZUGUREN ANGEL AORL ASECIR AMG AMBASSADOR AEMRASECCASCKFLOMARRPRELPINRAMGTJMXL ADM ASES ABMC AER AMER ASE AMGTHA ARNOLDFREDERICK AOPC ACS AFL AEGR ASED AFPREL AGRI AMCHAM ARNOLD AN ANATO AME APERTH ASECSI AT ACDA ASEDC AIT AMERICA AMLB AMGE ACTION AGMT AFINIZ ASECVE ADRC ABER AGIT APCS AEMED ARABBL ARC ASO AIAG ACEC ASR ASECM ARG AEC ABT ADIP ADCP ANARCHISTS AORCUN AOWC ASJA AALC AX AROC ARM AGENCIES ALBE AK AZE AOPR AREP AMIA ASCE ALANAZI ABDULRAHMEN ABDULHADI AINFCY ARMS ASECEFINKCRMKPAOPTERKHLSAEMRNS AGRICULTURE AFPK AOCR ALEXANDER ATRD ATFN ABLG AORCD AFGHAN ARAS AORCYM AVERY ALVAREZ ACBAQ ALOWAR ANTOINE ABLDG ALAB AMERICAS AFAF ASECAFIN ASEK ASCC AMCT AMGTATK AMT APDC AEMRS ASECE AFSA ATRA ARTICLE ARENA AISG AEMRBC AFR AEIR ASECAF AFARI AMPR ASPA ASOC ANTONIO AORCL ASECARP APRM AUSTRALIAGROUP ASEG AFOR AEAID AMEDI ASECTH ASIC AFDIN AGUIRRE AUNR ASFC AOIC ANTXON ASA ASECCASC ALI AORCEUNPREFPRELSMIGBN ASECKHLS ASSSEMBLY ASECVZ AI ASECPGOV ASIR ASCEC ASAC ARAB AIEA ADMIRAL AUSGR AQ AMTG ARRMZY ANC APR AMAT AIHRC AFU ADEL AECL ACAO AMEMR ADEP AV AW AOR ALL ALOUNI AORCUNGA ALNEA ASC AORCO ARMITAGE AGENGA AGRIC AEM ACOAAMGT AGUILAR AFPHUM AMEDCASCKFLO AFZAL AAA ATPDEA ASECPHUM ASECKFRDCVISKIRFPHUMSMIGEG
ETRD ETTC EU ECON EFIN EAGR EAID ELAB EINV ENIV ENRG EPET EZ ELTN ELECTIONS ECPS ET ER EG EUN EIND ECONOMICS EMIN ECIN EINT EWWT EAIR EN ENGR ES EI ETMIN EL EPA EARG EFIS ECONOMY EC EK ELAM ECONOMIC EAR ESDP ECCP ELN EUM EUMEM ECA EAP ELEC ECOWAS EFTA EXIM ETTD EDRC ECOSOC ECPSN ENVIRONMENT ECO EMAIL ECTRD EREL EDU ENERG ENERGY ENVR ETRAD EAC EXTERNAL EFIC ECIP ERTD EUC ENRGMO EINZ ESTH ECCT EAGER ECPN ELNT ERD EGEN ETRN EIVN ETDR EXEC EIAD EIAR EVN EPRT ETTF ENGY EAIDCIN EXPORT ETRC ESA EIB EAPC EPIT ESOCI ETRB EINDQTRD ENRC EGOV ECLAC EUR ELF ETEL ENRGUA EVIN EARI ESCAP EID ERIN ELAN ENVT EDEV EWWY EXBS ECOM EV ELNTECON ECE ETRDGK EPETEIND ESCI ETRDAORC EAIDETRD ETTR EMS EAGRECONEINVPGOVBN EBRD EUREM ERGR EAGRBN EAUD EFI ETRDEINVECINPGOVCS EPEC ETRO ENRGY EGAR ESSO EGAD ENV ENER EAIDXMXAXBXFFR ELA EET EINVETRD EETC EIDN ERGY ETRDPGOV EING EMINCG EINVECON EURM EEC EICN EINO EPSC ELAP ELABPGOVBN EE ESPS ETRA ECONETRDBESPAR ERICKSON EEOC EVENTS EPIN EB ECUN EPWR ENG EX EH EAIDAR EAIS ELBA EPETUN ETRDEIQ EENV ECPC ETRP ECONENRG EUEAID EWT EEB EAIDNI ESENV EADM ECN ENRGKNNP ETAD ETR ECONETRDEAGRJA ETRG ETER EDUC EITC EBUD EAIF EBEXP EAIDS EITI EGOVSY EFQ ECOQKPKO ETRGY ESF EUE EAIC EPGOV ENFR EAGRE ENRD EINTECPS EAVI ETC ETCC EIAID EAIDAF EAGREAIDPGOVPRELBN EAOD ETRDA EURN EASS EINVA EAIDRW EON ECOR EPREL EGPHUM ELTM ECOS EINN ENNP EUPGOV EAGRTR ECONCS ETIO ETRDGR EAIDB EISNAR EIFN ESPINOSA EAIDASEC ELIN EWTR EMED ETFN ETT EADI EPTER ELDIN EINVEFIN ESS ENRGIZ EQRD ESOC ETRDECD ECINECONCS EAIT ECONEAIR ECONEFIN EUNJ ENRGKNNPMNUCPARMPRELNPTIAEAJMXL ELAD EFIM ETIC EFND EFN ETLN ENGRD EWRG ETA EIN EAIRECONRP EXIMOPIC ERA ENRGJM ECONEGE ENVI ECHEVARRIA EMINETRD EAD ECONIZ EENG ELBR EWWC ELTD EAIDMG ETRK EIPR EISNLN ETEX EPTED EFINECONCS EPCS EAG ETRDKIPR ED EAIO ETRDEC ENRGPARMOTRASENVKGHGPGOVECONTSPLEAID ECONEINVEFINPGOVIZ ERNG EFINU EURFOR EWWI ELTNSNAR ETD EAIRASECCASCID EOXC ESTN EAIDAORC EAGRRP ETRDEMIN ELABPHUMSMIGKCRMBN ETRDEINVTINTCS EGHG EAIDPHUMPRELUG EAGRBTIOBEXPETRDBN EDA EPETPGOV ELAINE EUCOM EMW EFINECONEAIDUNGAGM ELB EINDETRD EMI ETRDECONWTOCS EINR ESTRADA EHUM EFNI ELABV ENR EMN EXO EWWTPRELPGOVMASSMARRBN EATO END EP EINVETC ECONEFINETRDPGOVEAGRPTERKTFNKCRMEAID ELTRN EIQ ETTW EAI ENGRG ETRED ENDURING ETTRD EAIDEGZ EOCN EINF EUPREL ENRL ECPO ENLT EEFIN EPPD ECOIN EUEAGR EISL EIDE ENRGSD EINVECONSENVCSJA EAIG ENTG EEPET EUNCH EPECO ETZ EPAT EPTE EAIRGM ETRDPREL EUNGRSISAFPKSYLESO ETTN EINVKSCA ESLCO EBMGT ENRGTRGYETRDBEXPBTIOSZ EFLU ELND EFINOECD EAIDHO EDUARDO ENEG ECONEINVETRDEFINELABETRDKTDBPGOVOPIC EFINTS ECONQH ENRGPREL EUNPHUM EINDIR EPE EMINECINECONSENVTBIONS EFINM ECRM EQ EWWTSP ECONPGOVBN
KFLO KPKO KDEM KFLU KTEX KMDR KPAO KCRM KIDE KN KNNP KG KMCA KZ KJUS KWBG KU KDMR KAWC KCOR KPAL KOMC KTDB KTIA KISL KHIV KHUM KTER KCFE KTFN KS KIRF KTIP KIRC KSCA KICA KIPR KPWR KWMN KE KGIC KGIT KSTC KACT KSEP KFRD KUNR KHLS KCRS KRVC KUWAIT KVPR KSRE KMPI KMRS KNRV KNEI KCIP KSEO KITA KDRG KV KSUM KCUL KPET KBCT KO KSEC KOLY KNAR KGHG KSAF KWNM KNUC KMNP KVIR KPOL KOCI KPIR KLIG KSAC KSTH KNPT KINL KPRP KRIM KICC KIFR KPRV KAWK KFIN KT KVRC KR KHDP KGOV KPOW KTBT KPMI KPOA KRIF KEDEM KFSC KY KGCC KATRINA KWAC KSPR KTBD KBIO KSCI KRCM KNNB KBNC KIMT KCSY KINR KRAD KMFO KCORR KW KDEMSOCI KNEP KFPC KEMPI KBTR KFRDCVISCMGTCASCKOCIASECPHUMSMIGEG KNPP KTTB KTFIN KBTS KCOM KFTN KMOC KOR KDP KPOP KGHA KSLG KMCR KJUST KUM KMSG KHPD KREC KIPRTRD KPREL KEN KCSA KCRIM KGLB KAKA KWWT KUNP KCRN KISLPINR KLFU KUNC KEDU KCMA KREF KPAS KRKO KNNC KLHS KWAK KOC KAPO KTDD KOGL KLAP KECF KCRCM KNDP KSEAO KCIS KISM KREL KISR KISC KKPO KWCR KPFO KUS KX KWCI KRFD KWPG KTRD KH KLSO KEVIN KEANE KACW KWRF KNAO KETTC KTAO KWIR KVCORR KDEMGT KPLS KICT KWGB KIDS KSCS KIRP KSTCPL KDEN KLAB KFLOA KIND KMIG KPPAO KPRO KLEG KGKG KCUM KTTP KWPA KIIP KPEO KICR KNNA KMGT KCROM KMCC KLPM KNNPGM KSIA KSI KWWW KOMS KESS KMCAJO KWN KTDM KDCM KCM KVPRKHLS KENV KCCP KGCN KCEM KEMR KWMNKDEM KNNPPARM KDRM KWIM KJRE KAID KWMM KPAONZ KUAE KTFR KIF KNAP KPSC KSOCI KCWI KAUST KPIN KCHG KLBO KIRCOEXC KI KIRCHOFF KSTT KNPR KDRL KCFC KLTN KPAOKMDRKE KPALAOIS KESO KKOR KSMT KFTFN KTFM KDEMK KPKP KOCM KNN KISLSCUL KFRDSOCIRO KINT KRG KWMNSMIG KSTCC KPAOY KFOR KWPR KSEPCVIS KGIV KSEI KIL KWMNPHUMPRELKPAOZW KQ KEMS KHSL KTNF KPDD KANSOU KKIV KFCE KTTC KGH KNNNP KK KSCT KWNN KAWX KOMCSG KEIM KTSD KFIU KDTB KFGM KACP KWWMN KWAWC KSPA KGICKS KNUP KNNO KISLAO KTPN KSTS KPRM KPALPREL KPO KTLA KCRP KNMP KAWCK KCERS KDUM KEDM KTIALG KWUN KPTS KPEM KMEPI KAWL KHMN KCRO KCMR KPTD KCROR KMPT KTRF KSKN KMAC KUK KIRL KEM KSOC KBTC KOM KINP KDEMAF KTNBT KISK KRM KWBW KBWG KNNPMNUC KNOP KSUP KCOG KNET KWBC KESP KMRD KEBG KFRDKIRFCVISCMGTKOCIASECPHUMSMIGEG KPWG KOMCCO KRGY KNNF KPROG KJAN KFRED KPOKO KM KWMNCS KMPF KJWC KJU KSMIG KALR KRAL KDGOV KPA KCRMJA KCRI KAYLA KPGOV KRD KNNPCH KFEM KPRD KFAM KALM KIPRETRDKCRM KMPP KADM KRFR KMWN KWRG KTIAPARM KTIAEUN KRDP KLIP KDDEM KTIAIC KWKN KPAD KDM KRCS KWBGSY KEAI KIVP KPAOPREL KUNH KTSC KIPT KNP KJUSTH KGOR KEPREL KHSA KGHGHIV KNNR KOMH KRCIM KWPB KWIC KINF KPER KILS KA KNRG KCSI KFRP KLFLO KFE KNPPIS KQM KQRDQ KERG KPAOPHUM KSUMPHUM KVBL KARIM KOSOVO KNSD KUIR KWHG KWBGXF KWMNU KPBT KKNP KERF KCRT KVIS KWRC KVIP KTFS KMARR KDGR KPAI KDE KTCRE KMPIO KUNRAORC KHOURY KAWS KPAK KOEM KCGC KID KVRP KCPS KIVR KBDS KWOMN KIIC KTFNJA KARZAI KMVP KHJUS KPKOUNSC KMAR KIBL KUNA KSA KIS KJUSAF KDEV KPMO KHIB KIRD KOUYATE KIPRZ KBEM KPAM KDET KPPD KOSCE KJUSKUNR KICCPUR KRMS KWMNPREL KWMJN KREISLER KWM KDHS KRV KPOV KWMNCI KMPL KFLD KWWN KCVM KIMMITT KCASC KOMO KNATO KDDG KHGH KRF KSCAECON KWMEN KRIC
PREL PINR PGOV PHUM PTER PE PREF PARM PBTS PINS PHSA PK PL PM PNAT PHAS PO PROP PGOVE PA PU POLITICAL PPTER POL PALESTINIAN PHUN PIN PAMQ PPA PSEC POLM PBIO PSOE PDEM PAK PF PKAO PGOVPRELMARRMOPS PMIL PV POLITICS PRELS POLICY PRELHA PIRN PINT PGOG PERSONS PRC PEACE PROCESS PRELPGOV PROV PFOV PKK PRE PT PIRF PSI PRL PRELAF PROG PARMP PERL PUNE PREFA PP PGOB PUM PROTECTION PARTIES PRIL PEL PAGE PS PGO PCUL PLUM PIF PGOVENRGCVISMASSEAIDOPRCEWWTBN PMUC PCOR PAS PB PKO PY PKST PTR PRM POUS PRELIZ PGIC PHUMS PAL PNUC PLO PMOPS PHM PGOVBL PBK PELOSI PTE PGOVAU PNR PINSO PRO PLAB PREM PNIR PSOCI PBS PD PHUML PERURENA PKPA PVOV PMAR PHUMCF PUHM PHUH PRELPGOVETTCIRAE PRT PROPERTY PEPFAR PREI POLUN PAR PINSF PREFL PH PREC PPD PING PQL PINSCE PGV PREO PRELUN POV PGOVPHUM PINRES PRES PGOC PINO POTUS PTERE PRELKPAO PRGOV PETR PGOVEAGRKMCAKNARBN PPKO PARLIAMENT PEPR PMIG PTBS PACE PETER PMDL PVIP PKPO POLMIL PTEL PJUS PHUMNI PRELKPAOIZ PGOVPREL POGV PEREZ POWELL PMASS PDOV PARN PG PPOL PGIV PAIGH PBOV PETROL PGPV PGOVL POSTS PSO PRELEU PRELECON PHUMPINS PGOVKCMABN PQM PRELSP PRGO PATTY PRELPGOVEAIDECONEINVBEXPSCULOIIPBTIO PGVO PROTESTS PRELPLS PKFK PGOVEAIDUKNOSWGMHUCANLLHFRSPITNZ PARAGRAPH PRELGOV POG PTRD PTERM PBTSAG PHUMKPAL PRELPK PTERPGOV PAO PRIVATIZATION PSCE PPAO PGOVPRELPHUMPREFSMIGELABEAIDKCRMKWMN PARALYMPIC PRUM PKPRP PETERS PAHO PARMS PGREL PINV POINS PHUMPREL POREL PRELNL PHUMPGOV PGOVQL PLAN PRELL PARP PROVE PSOC PDD PRELNP PRELBR PKMN PGKV PUAS PRELTBIOBA PBTSEWWT PTERIS PGOVU PRELGG PHUMPRELPGOV PFOR PEPGOV PRELUNSC PRAM PICES PTERIZ PREK PRELEAGR PRELEUN PHUME PHU PHUMKCRS PRESL PRTER PGOF PARK PGOVSOCI PTERPREL PGOVEAID PGOVPHUMKPAO PINSKISL PREZ PGOVAF PARMEUN PECON PINL POGOV PGOVLO PIERRE PRELPHUM PGOVPZ PGOVKCRM PBST PKPAO PHUMHUPPS PGOVPOL PASS PPGOV PROGV PAGR PHALANAGE PARTY PRELID PGOVID PHUMR PHSAQ PINRAMGT PSA PRELM PRELMU PIA PINRPE PBTSRU PARMIR PEDRO PNUK PVPR PINOCHET PAARM PRFE PRELEIN PINF PCI PSEPC PGOVSU PRLE PDIP PHEM PRELB PORG PGGOC POLG POPDC PGOVPM PWMN PDRG PHUMK PINB PRELAL PRER PFIN PNRG PRED POLI PHUMBO PHYTRP PROLIFERATION PHARM PUOS PRHUM PUNR PENA PGOVREL PETRAEUS PGOVKDEM PGOVENRG PHUS PRESIDENT PTERKU PRELKSUMXABN PGOVSI PHUMQHA PKISL PIR PGOVZI PHUMIZNL PKNP PRELEVU PMIN PHIM PHUMBA PUBLIC PHAM PRELKPKO PMR PARTM PPREL PN PROL PDA PGOVECON PKBL PKEAID PERM PRELEZ PRELC PER PHJM PGOVPRELPINRBN PRFL PLN PWBG PNG PHUMA PGOR PHUMPTER POLINT PPEF PKPAL PNNL PMARR PAC PTIA PKDEM PAUL PREG PTERR PTERPRELPARMPGOVPBTSETTCEAIRELTNTC PRELJA POLS PI PNS PAREL PENV PTEROREP PGOVM PINER PBGT PHSAUNSC PTERDJ PRELEAID PARMIN PKIR PLEC PCRM PNET PARR PRELETRD PRELBN PINRTH PREJ PEACEKEEPINGFORCES PEMEX PRELZ PFLP PBPTS PTGOV PREVAL PRELSW PAUM PRF PHUMKDEM PATRICK PGOVKMCAPHUMBN PRELA PNUM PGGV PGOVSMIGKCRMKWMNPHUMCVISKFRDCA PBT PIND PTEP PTERKS PGOVJM PGOT PRELMARR PGOVCU PREV PREFF PRWL PET PROB PRELPHUMP PHUMAF PVTS PRELAFDB PSNR PGOVECONPRELBU PGOVZL PREP PHUMPRELBN PHSAPREL PARCA PGREV PGOVDO PGON PCON PODC PRELOV PHSAK PSHA PGOVGM PRELP POSCE PGOVPTER PHUMRU PINRHU PARMR PGOVTI PPEL PMAT PAN PANAM PGOVBO PRELHRC

Browse by classification

Community resources

courage is contagious

Viewing cable 03OTTAWA412, MANITOBA: NEW ELECTRICITY OPTIONS

If you are new to these pages, please read an introduction on the structure of a cable as well as how to discuss them with others. See also the FAQs

Understanding cables
Every cable message consists of three parts:
  • The top box shows each cables unique reference number, when and by whom it originally was sent, and what its initial classification was.
  • The middle box contains the header information that is associated with the cable. It includes information about the receiver(s) as well as a general subject.
  • The bottom box presents the body of the cable. The opening can contain a more specific subject, references to other cables (browse by origin to find them) or additional comment. This is followed by the main contents of the cable: a summary, a collection of specific topics and a comment section.
To understand the justification used for the classification of each cable, please use this WikiSource article as reference.

Discussing cables
If you find meaningful or important information in a cable, please link directly to its unique reference number. Linking to a specific paragraph in the body of a cable is also possible by copying the appropriate link (to be found at theparagraph symbol). Please mark messages for social networking services like Twitter with the hash tags #cablegate and a hash containing the reference ID e.g. #03OTTAWA412.
Reference ID Created Released Classification Origin
03OTTAWA412 2003-02-11 16:05 2011-08-30 01:44 UNCLASSIFIED Embassy Ottawa
This record is a partial extract of the original cable. The full text of the original cable is not available.
UNCLAS SECTION 01 OF 04 OTTAWA 000412 
 
SIPDIS 
 
STATE FOR EB/ESC (MCMANUS AND ERVITI), WHA/CAN 
(MASON AND RUNNING), OES/EGC (REIFSNYDER AND 
DEROSA) 
WHITE HOUSE FOR NSC (SAMMIS and BROCK), OVP 
(KNUTSON) AND EOP (MCNALLY) 
DOE FOR S (HUDOME), IA A/S BAILEY, PUMPHREY, DE 
VITO AND DEUTSCH 
 
E.O. 12958: N/A 
TAGS: ENRG SENV CA
SUBJECT: MANITOBA: NEW ELECTRICITY OPTIONS 
 
THIS IS A PRODUCT OF AMERICAN PRESENCE 
POST WINNIPEG. 
 
1.  Summary and introduction.  The Province of 
Manitoba and its state-owned hydroelectricity 
utility, Manitoba Hydro, seek to greatly expand 
hydroelectricity exports to the United States 
from the already considerable level of 8.8 
terawatt hours, with a value of C$495 million 
per anum.  Officials estimate that an 
additional 5000 mw of electricity - equal to 
its total existing capacity - could be 
developed in Manitoba without significant local 
political, legal or social disruption.  Most of 
this new capacity could be made available for 
the U.S. market, helping to guarantee energy 
security for U.S. consumers from a close-by, 
clean, secure and relatively inexpensive source 
of power.  Two challenges have prevented this 
from coming to fruition: 1) A lack of 
transmission capability to get the electricity 
to the large U.S. markets of the Midwest, and 
2) The current uncertainty and price 
instability caused by industry restructuring in 
the United States and Canada, which makes 
Manitoba Hydro and outside investors reluctant 
to make the large capital investment in 
hydroelectricity infrastructure.  End Summary 
and Introduction. 
 
2.  Manitoba sees tremendous potential in the 
vast demand for energy in the U.S. Midwest. 
Chicago and Milwaukee are physically much 
closer to Manitoba than Ontario's industrial 
heartland, cutting down the distance required 
to transport the electricity, and the demand is 
far greater than in Manitoba's western 
neighbors of Saskatchewan and Alberta.  In a 
meeting with Embassy Energy Officer and 
Winnipeg Econ Assistant, Manitoba Hydro 
President and CEO Bob Brennan indicated that 
his company has estimated that Wisconsin alone 
will need close to 7000 mw of power in the next 
few years, an amount greater than all of 
Manitoba's potential development.  (Note: 
Medium-term in the construction of 
hydroelectric facilities means at least 10 
years). 
 
"Tell us what we have to do" 
--------------------------- 
 
3. Manitoba is clearly very interested in 
supplying new demand in the U.S. Midwest, but 
there is no way to get the power there. 
Manitoba Energy Minister Sale put it best when 
he said, "Tell us what we have to do."  The 
lack of east-west transmission capability in 
the upper Midwest is one of the most 
significant problems Manitoba faces in 
exporting large quantities of power to the 
United States.  The energy Minister explained 
that the North American electricity market is 
divided into largely self-sufficient clusters, 
with only a minimum amount of interconnection 
between them.  The upper Midwest (including 
Minnesota and the Dakotas) is one "cluster" 
while Wisconsin, Illinois and Indiana is 
another.  Interconnectivity is weak between the 
two, and as a result it is impossible to move 
electricity - in any great quantities - to 
Milwaukee and Chicago.  Manitoba Hydro began 
full operations in February 2002 with the 
Midwest Independent System Operator (MISO) 
organization, permitting open wholesale 
transmission access to the Midwest market. 
Although MISO holds out the promise of expanded 
access to Midwest markets, Manitoba is 
disappointed with the lack of any progress to 
date in expanding transmission facilities 
between the upper Midwest (Minnesota and the 
Dakotas) and the adjacent markets to the south 
and east. 
 
4.  Manitoba Hydro has been exporting 
electricity to the United States since 1970, 
and consistently ranks among the top three 
exporters of electricity among Canadian 
provinces (behind Quebec and British Columbia), 
exporting over 8.8 terawatt hours in 2001-2002. 
Currently, Manitoba Hydro has nine long-term 
export trade agreements with six electric 
utilities and numerous short-term agreements 
with more than 30 electric utilities and 
marketers in the Midwestern United States, as 
well as the Canadian provinces of Ontario and 
Saskatchewan.  In July 2002, Manitoba Hydro 
contracted with Northern States Power (Xcel 
Energy) of Minnesota to sell 500 megawatts of 
power over 10 years, beginning in 2006, which 
replaces a similar 12-year deal between the two 
utilities that expires in 2005. 
 
Kyoto - Fiasco to Some, Opportunities to Others 
--------------------------------------------- -- 
 
5.  Although Canada's petroleum industry in 
Alberta and Saskatchewan, and its manufacturing 
heartland of Ontario, stand to be hurt by the 
emission control measures likely to flow from 
GOC implementation of Kyoto, Manitoba sees 
opportunities.  The province views itself as 
having a natural advantage in its "clean" 
surplus hydro-generated electricity and in 
developing peripheral energy industries in 
ethanol - to capitalize on Manitoba's surplus 
of feed wheat - as well as an innovative 
proposal by the Ottawa-based Iogene company to 
derive ethanol from straw.  The GOM is also 
promoting development of hydrogen and wind 
energy sources, which it views as complementary 
to its hydro resources. 
 
6.  Manitoba's left-of-center New Democratic 
Party (NDP) government has been a staunch 
supporter of the Kyoto Accord for a number of 
years.  Manitoba Premier Gary Doer has 
consistently been the Prime Minister's 
strongest advocate among the Premiers for 
Canada's ratification of the deal.  Manitoba 
hopes to leverage the resulting goodwill into 
GOC support for a C$1 billion transmission line 
that would allow Manitoba to sell surplus 
hydroelectricity to Ontario, Canada's 
industrial heartland.  (Note: There is 
currently no large-scale transmission 
capability between Manitoba and southern 
Ontario). This possibility has been raised 
repeatedly in recent years, and Manitoba Energy 
Minister Tim Sale traveled to Ottawa in January 
to press the GOC on the issue.  Prime Minister 
Chretien has at times expressed interest in 
this idea, but his preference is a privately 
financed new north-south connection to the U.S. 
 
7.  Although as a government-owned utility 
Manitoba Hydro is exempt from taxation, the NDP 
government has increasingly turned to the 
utility as a revenue source, tapping it for 
C$354 million this year in fees, services 
charges, and a special "dividend" payment to 
help the government balance its budget.  The 
NDP government has given strong signals that it 
plans to build new generating facilities in 
northern Manitoba, but must secure additional 
export markets with long-term contracts to 
justify the capital expense. The province has 
also indicated a preference for building 
smaller projects like Wuskwatim (200 mw) or 
Gull (600 mw) before the large-scale Conawapa 
Dam (1400 mw).  The Wuskwatim project will cost 
about C$1 billion and take at least 10 years to 
build. 
 
 
 
Environmental Concerns Are Muted 
-------------------------------- 
8.  Manitoba Energy Minister Sale admitted to 
us that the hydro-electric generating 
facilities constructed in the 1960s were built 
too big and caused extensive environmental 
damage to traditional Indian hunting and 
fishing grounds in northern Manitoba.  One of 
the affected bands, Cross Lake, continues to 
fight a public relations battle with Manitoba 
Hydro, especially in the Minnesota market, even 
after Manitoba Hydro provided Cross Lake C$70 
million in compensation. Manitoba Hydro has 
settled with the other four bands that were 
affected by the flooding and the vast majority 
of Manitoba Indian bands are supportive of 
hydro-electricity development.  Minister Sale 
speculated that the Cross Lake band is being 
"used" by U.S. environmental groups who - he 
says - oppose any and all hydro-electricity 
expansion as a matter of principle.  He 
believes that Canadian environmental groups 
have more of a mixed reaction to the Cross Lake 
concerns, and he is confident that the smaller 
projects like Wuskwatim could proceed with 
little effective opposition from domestic 
groups. 
 
What next? 
---------- 
 
9.  Manitoba Hydro has immense hydro- 
electricity potential that could be developed 
with relatively little environmental impact. 
Even the construction of hundreds of miles of 
transmission lines from the remote northern 
generating stations to the U.S. border raises 
few eyebrows here.  Manitoba Hydro officials 
are aware of immense opportunities for sales of 
hydroelectricity in the United States, but have 
not had significant success in expanding beyond 
their relatively small base of supplying power 
to several upper Midwest states.  In addition 
to the limits imposed by existing transmission 
capacity, the partially de-regulated U.S. 
electricity utilities are not interested in the 
long-term contracts Manitoba Hydro would need 
to justify the construction of new dams or 
enhanced transmission cables. 
 
10.  Currently, Manitoba hopes that its support 
for the Kyoto Accord will result in a federally 
funded transmission line to take Manitoba's 
electricity to Ontario - replacing "dirtier" 
forms of energy generation there - but the 
federal government has made no commitment. 
Manitoba sees some opportunities for exports to 
Canada's western provinces, but the quantities 
are relatively small, and again the 
transmission lines are inadequate to handle 
much more traffic. 
 
Comment 
------- 
 
11.  Manitoba is committed to developing its 
hydroelectric generation potential and will 
ultimately find markets for it output, given 
its low cost of generation and relatively low 
barriers (compared to other jurisdictions) to 
transmission line construction.  The question 
that remains is who will get it.  There is an 
open window of opportunity for border states of 
the U.S. Midwest to work with Manitoba to 
overcome obstacles posed by transmission 
limitations and industry restructuring - and 
get a guaranteed supply of potentially low-cost 
electricity from a nearby source.  However, if 
American utilities miss this opportunity, 
Canadians will find a way to get Manitoba's 
abundant and inexpensive electricity to the 
Canadian heartland of Ontario where the 
appetite is equally large. 
CELLUCCI