Keep Us Strong WikiLeaks logo

Currently released so far... 143912 / 251,287

Articles

Browse latest releases

Browse by creation date

Browse by origin

A B C D F G H I J K L M N O P Q R S T U V W Y Z

Browse by tag

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
AORC AS AF AM AJ ASEC AU AMGT APER ACOA ASEAN AG AFFAIRS AR AFIN ABUD AO AEMR ADANA AMED AADP AINF ARF ADB ACS AE AID AL AC AGR ABLD AMCHAMS AECL AINT AND ASIG AUC APECO AFGHANISTAN AY ARABL ACAO ANET AFSN AZ AFLU ALOW ASSK AFSI ACABQ AMB APEC AIDS AA ATRN AMTC AVIATION AESC ASSEMBLY ADPM ASECKFRDCVISKIRFPHUMSMIGEG AGOA ASUP AFPREL ARNOLD ADCO AN ACOTA AODE AROC AMCHAM AT ACKM ASCH AORCUNGA AVIANFLU AVIAN AIT ASECPHUM ATRA AGENDA AIN AFINM APCS AGENGA ABDALLAH ALOWAR AFL AMBASSADOR ARSO AGMT ASPA AOREC AGAO ARR AOMS ASC ALIREZA AORD AORG ASECVE ABER ARABBL ADM AMER ALVAREZ AORCO ARM APERTH AINR AGRI ALZUGUREN ANGEL ACDA AEMED ARC AMGMT AEMRASECCASCKFLOMARRPRELPINRAMGTJMXL ASECAFINGMGRIZOREPTU ABMC AIAG ALJAZEERA ASR ASECARP ALAMI APRM ASECM AMPR AEGR AUSTRALIAGROUP ASE AMGTHA ARNOLDFREDERICK AIDAC AOPC ANTITERRORISM ASEG AMIA ASEX AEMRBC AFOR ABT AMERICA AGENCIES AGS ADRC ASJA AEAID ANARCHISTS AME AEC ALNEA AMGE AMEDCASCKFLO AK ANTONIO ASO AFINIZ ASEDC AOWC ACCOUNT ACTION AMG AFPK AOCR AMEDI AGIT ASOC ACOAAMGT AMLB AZE AORCYM AORL AGRICULTURE ACEC AGUILAR ASCC AFSA ASES ADIP ASED ASCE ASFC ASECTH AFGHAN ANTXON APRC AFAF AFARI ASECEFINKCRMKPAOPTERKHLSAEMRNS AX ALAB ASECAF ASA ASECAFIN ASIC AFZAL AMGTATK ALBE AMT AORCEUNPREFPRELSMIGBN AGUIRRE AAA ABLG ARCH AGRIC AIHRC ADEL AMEX ALI AQ ATFN AORCD ARAS AINFCY AFDB ACBAQ AFDIN AOPR AREP ALEXANDER ALANAZI ABDULRAHMEN ABDULHADI ATRD AEIR AOIC ABLDG AFR ASEK AER ALOUNI AMCT AVERY ASECCASC ARG APR AMAT AEMRS AFU ATPDEA ALL ASECE ANDREW
EAIR ECON ETRD EAGR EAID EFIN ETTC ENRG EMIN ECPS EG EPET EINV ELAB EU ECONOMICS EC EZ EUN EN ECIN EWWT EXTERNAL ENIV ES ESA ELN EFIS EIND EPA ELTN EXIM ET EINT EI ER EAIDAF ETRO ETRDECONWTOCS ECTRD EUR ECOWAS ECUN EBRD ECONOMIC ENGR ECONOMY EFND ELECTIONS EPECO EUMEM ETMIN EXBS EAIRECONRP ERTD EAP ERGR EUREM EFI EIB ENGY ELNTECON EAIDXMXAXBXFFR ECOSOC EEB EINF ETRN ENGRD ESTH ENRC EXPORT EK ENRGMO ECO EGAD EXIMOPIC ETRDPGOV EURM ETRA ENERG ECLAC EINO ENVIRONMENT EFIC ECIP ETRDAORC ENRD EMED EIAR ECPN ELAP ETCC EAC ENEG ESCAP EWWC ELTD ELA EIVN ELF ETR EFTA EMAIL EL EMS EID ELNT ECPSN ERIN ETT EETC ELAN ECHEVARRIA EPWR EVIN ENVR ENRGJM ELBR EUC EARG EAPC EICN EEC EREL EAIS ELBA EPETUN EWWY ETRDGK EV EDU EFN EVN EAIDETRD ENRGTRGYETRDBEXPBTIOSZ ETEX ESCI EAIDHO EENV ETRC ESOC EINDQTRD EINVA EFLU EGEN ECE EAGRBN EON EFINECONCS EIAD ECPC ENV ETDR EAGER ETRDKIPR EWT EDEV ECCP ECCT EARI EINVECON ED ETRDEC EMINETRD EADM ENRGPARMOTRASENVKGHGPGOVECONTSPLEAID ETAD ECOM ECONETRDEAGRJA EMINECINECONSENVTBIONS ESSO ETRG ELAM ECA EENG EITC ENG ERA EPSC ECONEINVETRDEFINELABETRDKTDBPGOVOPIC EIPR ELABPGOVBN EURFOR ETRAD EUE EISNLN ECONETRDBESPAR ELAINE EGOVSY EAUD EAGRECONEINVPGOVBN EINVETRD EPIN ECONENRG EDRC ESENV EB ENER ELTNSNAR EURN ECONPGOVBN ETTF ENVT EPIT ESOCI EFINOECD ERD EDUC EUM ETEL EUEAID ENRGY ETD EAGRE EAR EAIDMG EE EET ETER ERICKSON EIAID EX EAG EBEXP ESTN EAIDAORC EING EGOV EEOC EAGRRP EVENTS ENRGKNNPMNUCPARMPRELNPTIAEAJMXL ETRDEMIN EPETEIND EAIDRW ENVI ETRDEINVECINPGOVCS EPEC EDUARDO EGAR EPCS EPRT EAIDPHUMPRELUG EPTED ETRB EPETPGOV ECONQH EAIDS EFINECONEAIDUNGAGM EAIDAR EAGRBTIOBEXPETRDBN ESF EINR ELABPHUMSMIGKCRMBN EIDN ETRK ESTRADA EXEC EAIO EGHG ECN EDA ECOS EPREL EINVKSCA ENNP ELABV ETA EWWTPRELPGOVMASSMARRBN EUCOM EAIDASEC ENR END EP ERNG ESPS EITI EINTECPS EAVI ECONEFINETRDPGOVEAGRPTERKTFNKCRMEAID ELTRN EADI ELDIN ELND ECRM EINVEFIN EAOD EFINTS EINDIR ENRGKNNP ETRDEIQ ETC EAIRASECCASCID EINN ETRP EAIDNI EFQ ECOQKPKO EGPHUM EBUD EAIT ECONEINVEFINPGOVIZ EWWI ENERGY ELB EINDETRD EMI ECONEAIR ECONEFIN EHUM EFNI EOXC EISNAR ETRDEINVTINTCS EIN EFIM EMW ETIO ETRDGR EMN EXO EATO EWTR ELIN EAGREAIDPGOVPRELBN EINVETC ETTD EIQ ECONCS EPPD ESS EUEAGR ENRGIZ EISL EUNJ EIDE ENRGSD ELAD ESPINOSA ELEC EAIG ESLCO ENTG ETRDECD EINVECONSENVCSJA EEPET EUNCH ECINECONCS
KPKO KIPR KWBG KPAL KDEM KTFN KNNP KGIC KTIA KCRM KDRG KWMN KJUS KIDE KSUM KTIP KFRD KMCA KMDR KCIP KTDB KPAO KPWR KOMC KU KIRF KCOR KHLS KISL KSCA KGHG KS KSTH KSEP KE KPAI KWAC KFRDKIRFCVISCMGTKOCIASECPHUMSMIGEG KPRP KVPR KAWC KUNR KZ KPLS KN KSTC KMFO KID KNAR KCFE KRIM KFLO KCSA KG KFSC KSCI KFLU KMIG KRVC KV KVRP KMPI KNEI KAPO KOLY KGIT KSAF KIRC KNSD KBIO KHIV KHDP KBTR KHUM KSAC KACT KRAD KPRV KTEX KPIR KDMR KMPF KPFO KICA KWMM KICC KR KCOM KAID KINR KBCT KOCI KCRS KTER KSPR KDP KFIN KCMR KMOC KUWAIT KIPRZ KSEO KLIG KWIR KISM KLEG KTBD KCUM KMSG KMWN KREL KPREL KAWK KIMT KCSY KESS KWPA KNPT KTBT KCROM KPOW KFTN KPKP KICR KGHA KOMS KJUST KREC KOC KFPC KGLB KMRS KTFIN KCRCM KWNM KHGH KRFD KY KGCC KFEM KVIR KRCM KEMR KIIP KPOA KREF KJRE KRKO KOGL KSCS KGOV KCRIM KEM KCUL KRIF KCEM KITA KCRN KCIS KSEAO KWMEN KEANE KNNC KNAP KEDEM KNEP KHPD KPSC KIRP KUNC KALM KCCP KDEN KSEC KAYLA KIMMITT KO KNUC KSIA KLFU KLAB KTDD KIRCOEXC KECF KIPRETRDKCRM KNDP KIRCHOFF KJAN KFRDSOCIRO KWMNSMIG KEAI KKPO KPOL KRD KWMNPREL KATRINA KBWG KW KPPD KTIAEUN KDHS KRV KBTS KWCI KICT KPALAOIS KPMI KWN KTDM KWM KLHS KLBO KDEMK KT KIDS KWWW KLIP KPRM KSKN KTTB KTRD KNPP KOR KGKG KNN KTIAIC KSRE KDRL KVCORR KDEMGT KOMO KSTCC KMAC KSOC KMCC KCHG KSEPCVIS KGIV KPO KSEI KSTCPL KSI KRMS KFLOA KIND KPPAO KCM KRFR KICCPUR KFRDCVISCMGTCASCKOCIASECPHUMSMIGEG KNNB KFAM KWWMN KENV KGH KPOP KFCE KNAO KTIAPARM KWMNKDEM KDRM KNNNP KEVIN KEMPI KWIM KGCN KUM KMGT KKOR KSMT KISLSCUL KNRV KPRO KOMCSG KLPM KDTB KFGM KCRP KAUST KNNPPARM KUNH KWAWC KSPA KTSC KUS KSOCI KCMA KTFR KPAOPREL KNNPCH KWGB KSTT KNUP KPGOV KUK KMNP KPAS KHMN KPAD KSTS KCORR KI KLSO KWNN KNP KPTD KESO KMPP KEMS KPAONZ KPOV KTLA KPAOKMDRKE KNMP KWMNCI KWUN KRDP KWKN KPAOY KEIM KGICKS KIPT KREISLER KTAO KJU KLTN KWMNPHUMPRELKPAOZW KEN KQ KWPR KSCT KGHGHIV KEDU KRCIM KFIU KWIC KNNO KILS KTIALG KNNA KMCAJO KINP KRM KLFLO KPA KOMCCO KKIV KHSA KDM KRCS KWBGSY KISLAO KNPPIS KNNPMNUC KCRI KX KWWT KPAM KVRC KERG KK KSUMPHUM KACP KSLG KIF KIVP KHOURY KNPR KUNRAORC KCOG KCFC KWMJN KFTFN KTFM KPDD KMPIO KCERS KDUM KDEMAF KMEPI KHSL KEPREL KAWX KIRL KNNR KOMH KMPT KISLPINR KADM KPER KTPN KSCAECON KA KJUSTH KPIN KDEV KCSI KNRG KAKA KFRP KTSD KINL KJUSKUNR KQM KQRDQ KWBC KMRD KVBL KOM KMPL KEDM KFLD KPRD KRGY KNNF KPROG KIFR KPOKO KM KWMNCS KAWS KLAP KPAK KHIB KOEM KDDG KCGC
PGOV PREL PK PTER PINR PO PHUM PARM PREF PINF PRL PM PINS PROP PALESTINIAN PE PBTS PNAT PHSA PL PA PSEPC POSTS POLITICS POLICY POL PU PAHO PHUMPGOV PGOG PARALYMPIC PGOC PNR PREFA PMIL POLITICAL PROV PRUM PBIO PAK POV POLG PAR POLM PHUMPREL PKO PUNE PROG PEL PROPERTY PKAO PRE PSOE PHAS PNUM PGOVE PY PIRF PRES POWELL PP PREM PCON PGOVPTER PGOVPREL PODC PTBS PTEL PGOVTI PHSAPREL PD PG PRC PVOV PLO PRELL PEPFAR PREK PEREZ PINT POLI PPOL PARTIES PT PRELUN PH PENA PIN PGPV PKST PROTESTS PHSAK PRM PROLIFERATION PGOVBL PAS PUM PMIG PGIC PTERPGOV PSHA PHM PHARM PRELHA PELOSI PGOVKCMABN PQM PETER PJUS PKK POUS PTE PGOVPRELPHUMPREFSMIGELABEAIDKCRMKWMN PERM PRELGOV PAO PNIR PARMP PRELPGOVEAIDECONEINVBEXPSCULOIIPBTIO PHYTRP PHUML PFOV PDEM PUOS PN PRESIDENT PERURENA PRIVATIZATION PHUH PIF POG PERL PKPA PREI PTERKU PSEC PRELKSUMXABN PETROL PRIL POLUN PPD PRELUNSC PREZ PCUL PREO PGOVZI POLMIL PERSONS PREFL PASS PV PETERS PING PQL PETR PARMS PNUC PS PARLIAMENT PINSCE PROTECTION PLAB PGV PBS PGOVENRGCVISMASSEAIDOPRCEWWTBN PKNP PSOCI PSI PTERM PLUM PF PVIP PARP PHUMQHA PRELNP PHIM PRELBR PUBLIC PHUMKPAL PHAM PUAS PBOV PRELTBIOBA PGOVU PHUMPINS PICES PGOVENRG PRELKPKO PHU PHUMKCRS POGV PATTY PSOC PRELSP PREC PSO PAIGH PKPO PARK PRELPLS PRELPK PHUS PPREL PTERPREL PROL PDA PRELPGOV PRELAF PAGE PGOVGM PGOVECON PHUMIZNL PMAR PGOVAF PMDL PKBL PARN PARMIR PGOVEAIDUKNOSWGMHUCANLLHFRSPITNZ PDD PRELKPAO PKMN PRELEZ PHUMPRELPGOV PARTM PGOVEAGRKMCAKNARBN PPEL PGOVPRELPINRBN PGOVSOCI PWBG PGOVEAID PGOVPM PBST PKEAID PRAM PRELEVU PHUMA PGOR PPA PINSO PROVE PRELKPAOIZ PPAO PHUMPRELBN PGVO PHUMPTER PAGR PMIN PBTSEWWT PHUMR PDOV PINO PARAGRAPH PACE PINL PKPAL PTERE PGOVAU PGOF PBTSRU PRGOV PRHUM PCI PGO PRELEUN PAC PRESL PORG PKFK PEPR PRELP PMR PRTER PNG PGOVPHUMKPAO PRELECON PRELNL PINOCHET PAARM PKPAO PFOR PGOVLO PHUMBA POPDC PRELC PHUME PER PHJM POLINT PGOVPZ PGOVKCRM PAUL PHALANAGE PARTY PPEF PECON PEACE PROCESS PPGOV PLN PRELSW PHUMS PRF PEDRO PHUMKDEM PUNR PVPR PATRICK PGOVKMCAPHUMBN PRELA PGGV PSA PGOVSMIGKCRMKWMNPHUMCVISKFRDCA PGIV PRFE POGOV PBT PAMQ

Browse by classification

Community resources

courage is contagious

Viewing cable 09USUNNEWYORK89, FIFTH COMMITTEE ACTION ON THE 2008/2009 BUDGET

If you are new to these pages, please read an introduction on the structure of a cable as well as how to discuss them with others. See also the FAQs

Understanding cables
Every cable message consists of three parts:
  • The top box shows each cables unique reference number, when and by whom it originally was sent, and what its initial classification was.
  • The middle box contains the header information that is associated with the cable. It includes information about the receiver(s) as well as a general subject.
  • The bottom box presents the body of the cable. The opening can contain a more specific subject, references to other cables (browse by origin to find them) or additional comment. This is followed by the main contents of the cable: a summary, a collection of specific topics and a comment section.
To understand the justification used for the classification of each cable, please use this WikiSource article as reference.

Discussing cables
If you find meaningful or important information in a cable, please link directly to its unique reference number. Linking to a specific paragraph in the body of a cable is also possible by copying the appropriate link (to be found at theparagraph symbol). Please mark messages for social networking services like Twitter with the hash tags #cablegate and a hash containing the reference ID e.g. #09USUNNEWYORK89.
Reference ID Created Released Classification Origin
09USUNNEWYORK89 2009-02-03 22:45 2011-08-26 00:00 UNCLASSIFIED USUN New York
VZCZCXYZ0027
PP RUEHWEB

DE RUCNDT #0089/01 0342245
ZNR UUUUU ZZH
P 032245Z FEB 09
FM USMISSION USUN NEW YORK
TO SECSTATE WASHDC PRIORITY 5763
UNCLAS USUN NEW YORK 000089 
 
SIPDIS 
 
E.O. 12958: N/A 
TAGS: AORC KUNR PREL
SUBJECT: FIFTH COMMITTEE ACTION ON THE 2008/2009 BUDGET 
 
1. Summary:  The main session of the 63rd General Assembly 
concluded early morning on December 24, 2008. The Fifth 
Committee considered an extraordinary number of proposals 
most of which were deferred from the Main session of the 62nd 
General Assembly (GA).  At the outset of the session, the 
Organization was faced with a possible increase of $1 billion 
to the initial 2008-2009 budget approved by the 62nd GA, 
which would have reflected a 25% increase from the final 
2006-2007 budget.  The U.S. working with most Western States, 
particularly Japan, sought to limit the growth of the 
2008-2009 budget to approximately 15% bearing in mind that 
additional costs relating to Special Political Missions 
(SPMs) approved by the Security Council would alone increase 
the budget approximately 10%.  In the end, the 63rd GA 
approved $657 million in additional appropriations. Combined 
with the funding approved in the first resumed session of the 
62nd GA in March 2008 of $36 million, the total additional 
amount approved for the 2008-2009 biennium is $693 million. 
The overall 2008-2009 biennium budget now stands at $4.86 
billion. This represents an increase of 16.6% from the final 
2006-2007 biennium budget. However, because $45 million may 
not be assessed this year under the formulas adopted, the 
total amount assessed under the 2008-2009 biennium may be 
only $648 million, which would result in a 15.5% increase 
from the final 2006-2007 budget.  The GA invited the 
Secretary General to prepare the 2010-2011 biennium budget on 
the basis of a preliminary estimate of $4.87 billion.  Below 
is a summary of proposals adopted during the 63rd main 
session. More detailed reports are provided in SEPTELs on 
individual important proposals. END SUMMARY. 
 
REGULAR BUDGET 
 
2. 2010-2011 Budget Outline: The GA approved an estimate of 
$4.87 billion as the basis for the 2010-2011 budget. The GA 
also reaffirmed that the budget outline should be 
comprehensive and requested the SG to submit an annex on SPMs 
containing an updated estimate of the total 2010-2011 budget 
for such missions at the beginning of the 64th session as 
well as the total amount of resources needed to fully 
implement all mandated activities. USUN was not successful in 
having formal budget proposals from the Secretary General not 
yet approved by the GA included in the budget outline, 
despite widespread earlier agreement among Member States that 
in order to have a complete and transparent budget process 
these costs should be included in the budget outline to avoid 
a piece-meal approach to the budget that occurred in relation 
to the 2008-2009 budget.  As we understand, most Member 
States, including the major contributor States, were 
determined to keep the budget that would be initially 
presented to their capitals as low as possible.  The GA also 
requested the SG to issue future budget outlines no later 
than November 15 in off-budget years, if not sooner, 
emphasizing that the budget outline should be submitted 
sufficiently early in order to be a practical tool in the 
budget preparation process.  In this same resolution, the new 
level of the contingency fund was set at $36.5 million. 
 
3. Conditions of Service and Compensation for Officials Other 
than Secretariat Officials: This resolution requested the SG 
to revise the Pension Scheme Regulations for ICJ Members and 
the judges and ad-litem judges of the International Tribunal 
for the Former Yugoslavia (ICTY) and the International 
Criminal Tribunal for Rwanda (ICTR).  It further decided that 
any changes to the pension scheme would only apply to ICJ 
Members and the judges and ad-litem judges of the ICTY and 
the ICTR, but would not constitute a precedent for any other 
category of judges working in the UN system.  The GA included 
a prohibition on these judges receiving a pension at the same 
time they were currently serving on the ICC. This issue will 
be reviewed again at the 65th UNGA session.  Any expenditures 
resulting from this change will be reported in the final 
performance reports of the 2008-2009 budget and of the ICTY 
and ICTR. 
 
4. Development:  This resolution was the top priority for the 
G-77 for this session. The G-77 argued initially for approval 
of all 152 posts requested by the SG plus the retention of 
two posts proposed for elimination (the Special Advisor for 
Africa and assistant). However, after submitting a draft 
resolution for approval of all of those posts, in violation 
of the principle of consensus that normally governs the work 
of the Fifth Committee, the G-77 settled for ninety one new 
posts as well as retention of the Special Advisor on Africa 
(Under Secretary General level.)  The G-77 also agreed to the 
reduction of costs for travel, consultants, experts and 
contractual services, excluding the regional commissions. 
The establishment of approved posts will be staggered with 
posts for the regional economic commissions to be established 
effective January 1, 2009 and posts for DESA, LLDC/SIDS, 
NEPAD and UNCTAD to be established effective July 1, 2009. 
The resolution also requests the SG to report on the 
implementation of this resolution in the 2012-2013 budget. 
These decisions will cost $9.7 million for 2009 and 
 
approximately $22.2 million for 2010-2011. 
 
5. Department of Political Affairs: The General Assembly 
decided to strengthen the Department of Political Affairs by 
approving 49 new posts of varying levels with specific 
directions on posts and makeup of divisions. These decisions 
will cost $6.2 million for 2009 and approximately $17 million 
for 2010-2011. 
 
6. Information and Communications Technology (ICT)/Enterprise 
Resource Planning (ERP): The GA approved $20 million for the 
implementation of ERP comprising $5.1 million from the 
2008/2009 regular budget, $7.1 million from the July 
2008/June 2009 peacekeeping support account, and $7.8 million 
from 2008/2009 extrabudgetary resources.  The GA approved 
$2.3 million in interest accrued under the Integrated 
Management Information System Fund to be applied to the $5.1 
million requirement.  The remaining $2.8 million is to be 
absorbed within existing resources and reported on in the 
final performance report for the 2008-2009 biennium. 
 
For the Enterprise content management project, The GA 
approved $2 million to be absorbed within regular budget 
existing resources and reported in the final performance 
report.  For disaster recovery and business continuity, the 
GA approved $7.1 million for the establishment of a new 
primary data center on the North Lawn comprising of $5.7 
million from the regular budget to be absorbed from within 
existing resources and reported in the final performance 
report and $1.4 million from the peacekeeping support 
account. The GA noted its deep regret that the Secretary 
General entered into a long-term lease for a secondary data 
center before the site's viability had been fully established 
and its concern that the delay in identifying an alternate 
site could lead to further costs including costs to the 
Capital Master Plan, and risk to data.  The GA urged the 
Secretary General to explore alternative uses for the leased 
space as a matter of urgency. 
 
In addition, the GA approved $2.5 million to be absorbed 
within existing resources under the regular budget and 
reported in the final performance report for disaster 
recovery and business continuity services to UN Headquarters, 
offices away from headquarters and field missions.  The GA 
further noted with appreciation the Government of Spain's 
commitment and approved a secondary active telecommunications 
facility at Valencia to support peacekeeping activities.  The 
budget requirement of $149 thousand for the establishment of 
this site will be funded from within resources approved for 
the UN Logistics Base for the period of July 1, 2008 - June 
30, 2009. 
 
7. Human Resources Management: A new HR regime, primarily to 
enhance the UN's ability to recruit and retain staff in the 
field, was adopted at a cost of $13.2 million which is 
included in the SPM budget and $80.9 million under the 
peacekeeping budget. See Septel USUN 0011. 
 
8. UN Common System: The GA approved a revised base/floor 
scale of gross and net salaries for staff in the professional 
and higher categories; a revised level of the hardship, 
mobility and non-removal allowances; and a revised flat-rate 
allowance for children and secondary dependent's allowances. 
Any costs incurred as a result of these decisions will be 
reported in the final performance report for the 2008-2009 
biennium. 
 
9. Administration of Justice: The GA approved complete 
overhaul of the organization's internal justice system for 
resolving employment-related disputes.  The GA requested that 
any costs implications resulting from this action be absorbed 
from within existing appropriations and actual costs reported 
on in the final performance report. The GA also requested the 
Secretary General to conclude cost-sharing agreements with 
the relevant Funds and Programs by June 30,2009. See Septel 
USUN 0030. 
 
10. Special Political Missions (SPMs): The GA approved 
budgets for 27 SPMs totaling $429,497,600.  The GA took note 
of an unencumbered balance of $15,850,800 for 2008 and 
decided to appropriate $413.6 million under the regular 
budget. The GA also approved a commitment authority of $5 
million for design work for the headquarters facilities for 
the UN Assistance Mission in Iraq.  According the 
Secretariat, there will be additional resource requests for 
SPMs in the next resumed session in March 2009. 
 
11. Program Budget Implications and Revised Estimates to the 
2008/2009 Biennium:  The program budget implications (PBIs) 
and revised estimates that were charged against the 2008-2009 
contingency fund this past session amounted to $7.069 
million.  With these recent charges, $5.12 million remains in 
the contingency fund for the 2008-2009 biennium. The PBIs and 
revised estimates included funding for a rule of law unit 
 
($575K); Durban II ($642.7K); Convention on the Elimination 
of All Forms of Racial Discrimination (CERD) ($404K); 
extension of the mandate for the SRSG for Children and Armed 
Conflict ($2.05M); Committee on the Rights of the Child 
($546K); Human Rights Council decisions ($1.85M); and  the 
Convention on the Rights of Persons with Disabilities ($1M). 
Another PBI that was considered, but costs were absorbed 
included the arms trade treaty. The United States called for 
a vote on the arms trade treaty PBI and voted no. Israel 
called for a vote on the Durban PBI and the U.S. voted no 
along with Israel and 6 other countries. The U.S. 
disassociated from consensus on the Committee on the Rights 
of the Child and the CERD PBIs. 
 
ITEMS NOT INCLUDED IN THE REGULAR BUDGET: 
 
TRIBUNALS 
 
12. Financing of International Criminal Tribunal for Rwanda 
(ICTR):  The GA approved an revised estimate of $38 million 
for 2008-2009 which brings the total appropriation for the 
ICTR to $305.4 million.  The assessment for 2008 was $136 
million and for 2009 it is $169.3 million. However, the GA 
decided that Member States' respective share of the Tax 
Equalization Fund as well as the increase in the estimated 
staff assessment in the amount of $15.7 million shall be 
applied to the Member States' apportionment. 
 
13. Financing of the International Tribunal for the Former 
Yugoslavia (ITY): The GA approved a revised estimate of $28.7 
million for 2008-2009 which brings the total appropriation 
for the ITY to $376.2 million.  The assessment for 2008 was 
$173.7 million and for 2009 it is $202.3 million.  However, 
the GA decided that Member States' respective share of the 
Tax Equalization Fund as well as the increase in the 
estimated staff assessment income in the amount of $21.2 
million shall be applied to the Member States' apportionment. 
 
PEACEKEEPING MISSIONS 
 
14. Financing of UN Mission in Ethiopia and Eritrea (UNMEE): 
The GA noted the Security Council decision to terminate the 
UNMEE mandate effective July 31, 2008 and decided to reduce 
the July 2008/June 2009 appropriation of $100.4 million to 
$37.02 million as well as the staff assessment income from 
$2.3 million to $1.1 million.  The GA then further decided to 
apportion among Member States $28.7 million for the period 
from August 1, 2008 - June 30, 2009 in addition to the $8.75 
million already apportioned from July 1-31, 2009. The GA also 
decided that Member States' respective share of the Tax 
Equalization Fund of the estimated staff assessment income of 
$916 thousand for the period of August 1, 2008- June 30, 2009 
shall be applied to the Member States' apportionment.  The GA 
will keep this item under review. 
 
15. Financing of the African Union-United Nations Hybrid 
Operation in Darfur (UNAMID): The GA decided to apportion 
among Member States $449.86 million for the period of January 
1 - June 30, 2009.  This is in addition to the amount of 
$919.4 million already apportioned to Members States. The GA 
also decided to authorize the Secretary General, upon advice 
of the Controller, to assess Member States, as required, a 
further amount of up to $200 million for operations for the 
period of January 1 - June 30, 2009.  The GA will keep this 
item under review. 
 
UN PENSION SYSTEM 
 
16. The GA approved an additional $2.2 million for the UN 
Joint Staff Pension Fund which will be covered by Fund 
resources and not charged against the regular budget. This 
action brings the total amount appropriated for the Fund in 
2008-2009 to $153 million.  The GA also approved changes in 
Fund benefits such as streamlining provisions governing 
family or former family members and allowing participants who 
return to active contributory services after a period of 
disability to count the disability period as contributory 
service without having to pay contributions for that time. 
In regards to investments, the GA approved the inclusion of 
contractual settlement provisions in the agreement with the 
Global Custodian of the Fund and welcomed the continued 
effort by the Secretary General to diversify its investments 
between developed and emerging markets. But the GA stressed 
the need to ensure that, under the current volatile market, 
investment decisions should be implemented cautiously taking 
into account the four main criteria for investment - safety, 
profitability, liquidity, and convertibility. 
 
DEFERRED ITEMS 
 
17. A few items with budget implications were deferred for 
action in the next resumed session in March, such as the 
Secretary General's proposed accountability framework and the 
contingent liability reserve for the United Nations Postal 
 
Administration. 
Rice