Viewing cable 08KIGALI377, PROPOSALS FOR FY 2008 AMBASSADORS' FUND FOR

If you are new to these pages, please read an introduction on the structure of a cable as well as how to discuss them with others. See also the FAQs

Understanding cables
Every cable message consists of three parts:
  • The top box shows each cables unique reference number, when and by whom it originally was sent, and what its initial classification was.
  • The middle box contains the header information that is associated with the cable. It includes information about the receiver(s) as well as a general subject.
  • The bottom box presents the body of the cable. The opening can contain a more specific subject, references to other cables (browse by origin to find them) or additional comment. This is followed by the main contents of the cable: a summary, a collection of specific topics and a comment section.
To understand the justification used for the classification of each cable, please use this WikiSource article as reference.

Discussing cables
If you find meaningful or important information in a cable, please link directly to its unique reference number. Linking to a specific paragraph in the body of a cable is also possible by copying the appropriate link (to be found at theparagraph symbol). Please mark messages for social networking services like Twitter with the hash tags #cablegate and a hash containing the reference ID e.g. #08KIGALI377.
Reference ID Created Released Classification Origin
08KIGALI377 2008-05-30 11:41 2011-08-24 00:00 UNCLASSIFIED//FOR OFFICIAL USE ONLY Embassy Kigali
VZCZCXYZ0018
PP RUEHWEB

DE RUEHLGB #0377 1511141
ZNR UUUUU ZZH
P 301141Z MAY 08
FM AMEMBASSY KIGALI
TO RUEHC/SECSTATE WASHDC PRIORITY 5346
INFO RUEHGV/USMISSION GENEVA 0297
UNCLAS KIGALI 000377 
 
SENSITIVE 
SIPDIS 
 
DEPT FOR PRM/AFR 
 
E.O. 12958: N/A 
TAGS: PREF RW
SUBJECT: PROPOSALS FOR FY 2008 AMBASSADORS' FUND FOR 
REFUGEES 
 
REF: SECSTATE 06779 
 
ΒΆ1. (U) Embassy Kigali submits the following two proposals for 
consideration for funding by the FY 2008 Ambassadors' Fund 
for Refugees.  Note: Post will submit more detailed 
information on each project to PRM via unclass e-mail. 
 
Project: Concrete Drainage System and Spring Capping 
Description: The American Refugee Committee (ARC) is 
requesting $20,000 to conduct two projects.  For the first, 
ARC seeks funds to construct a concrete drainage system in 
Nyabiheke refugee camp to resolve health and safety problems 
with standing water and to ease relations with nearby farmers 
who must deal with unsatisfactory drainage and overflows from 
the current hand-dug drainage system.  ARC also requests 
funds to cap two springs to feed an existing water 
gravitation system in Kiziba refugee camp, making potable 
water available to the entire camp. 
 
Project: Family-size Kitchens with Fuel-efficient Cooking 
Stoves and Solar Oven Bread-baking Initiative 
Description:  The World Food Program (WFP) and ARC jointly 
request $20,000 to construct fuel-efficient cooking stoves 
for 800 families in Nyabiheke, Kiziba, and Gihembe refugee 
camps, reducing the amount of firewood needed for cooking and 
thereby reducing environmental degradation and the need to 
sell food rations for firewood.  WFP and ARC also request 
support to carry out a solar bread-baking oven project in 
each of the three camps, establishing income-generating 
projects to build the ovens and to use them to bake bread 
that would supply the camps. 
 
Justification: ARC received money from the FY 2007 
Ambassador's Fund for Refugees for a joint project with UNHCR 
and the Ministry of Local Government (MINALOC) to provide 
construction materials for houses for returnees from 
Tanzania.  ARC fulfilled its obligations on that project, 
though completion of the homes has been delayed due to 
problems on the part of MINALOC (septel to follow).  However, 
Post believes ARC will successfully carry out either of these 
two projects should it receive FY 2008 funds.  They have the 
expertise and capacity to implement their proposals and, 
unlike in last year's project, they would have responsibility 
for the completion of the entire project, not just the 
purchase and transfer of materials.  Both of the proposals 
meet needs of refugee camps in Rwanda that are not currently 
being funded and would have positive effects on large numbers 
of people, both refugees and the surrounding local 
populations. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ARIETTI