Viewing cable 08KABUL1050, PRT CHAGHCHARAN: No Improvements in sight to Runway at

If you are new to these pages, please read an introduction on the structure of a cable as well as how to discuss them with others. See also the FAQs

Understanding cables
Every cable message consists of three parts:
  • The top box shows each cables unique reference number, when and by whom it originally was sent, and what its initial classification was.
  • The middle box contains the header information that is associated with the cable. It includes information about the receiver(s) as well as a general subject.
  • The bottom box presents the body of the cable. The opening can contain a more specific subject, references to other cables (browse by origin to find them) or additional comment. This is followed by the main contents of the cable: a summary, a collection of specific topics and a comment section.
To understand the justification used for the classification of each cable, please use this WikiSource article as reference.

Discussing cables
If you find meaningful or important information in a cable, please link directly to its unique reference number. Linking to a specific paragraph in the body of a cable is also possible by copying the appropriate link (to be found at theparagraph symbol). Please mark messages for social networking services like Twitter with the hash tags #cablegate and a hash containing the reference ID e.g. #08KABUL1050.
Reference ID Created Released Classification Origin
08KABUL1050 2008-04-28 11:37 2011-08-24 01:00 UNCLASSIFIED//FOR OFFICIAL USE ONLY Embassy Kabul
VZCZCXRO9587
RR RUEHBW RUEHIK RUEHPW RUEHYG
DE RUEHBUL #1050/01 1191137
ZNR UUUUU ZZH
R 281137Z APR 08
FM AMEMBASSY KABUL
TO RUEHC/SECSTATE WASHDC 3716
RUEHVL/AMEMBASSY VILNIUS 0054
INFO RUCNAFG/AFGHANISTAN COLLECTIVE
RUEKJCS/OSD WASHINGTON DC
RUEKJCS/JOINT STAFF WASHINGTON DC
RHMFIUU/HQ USCENTCOM MACDILL AFB FL
RHEHAAA/NATIONAL SECURITY COUNCIL WASHINGTON DC
RUEAIIA/CIA WASHINGTON DC
RHEFDIA/DIA WASHINGTON DC
UNCLAS SECTION 01 OF 02 KABUL 001050 
 
SIPDIS 
 
DEPARTMENT FOR SCA/FO SCA/A, S/CRS, EUR/RPM 
NSC FOR WOOD 
OSD FOR SHIVERS 
CENTCOM FOR CG CSTC-A, CG CJTF-101 POLAD 
 
SENSITIVE 
SIPDIS 
 
E.O. 12958: N/A 
TAGS: MOPS EAIR PGOV EFIN PREL AF
SUBJECT: PRT CHAGHCHARAN: No Improvements in sight to Runway at 
Chaghcharan Airport 
 
REF:  Vilnius 272 
 
1. (SBU) Summary: The Chaghcharan airport improvement project has 
had an off-again, on-again existence since the Asian Development 
Bank (ADB) first provided funding in 2004.  The project as 
originally conceived by the Afghan government would cost 
approximately USD 3 million to refurbish runways, aprons and taxi 
ways.  In mid-2007, the Lithuanian-led PRT voiced concerns about the 
improvements since they would make the runway unsuitable for C-130 
traffic, which it can currently receive.  The Combined Security 
Transition Command-Afghanistan (CSTC-A) initially expressed interest 
in bringing the airport up to the C-130 standard, but was unable to 
provide the funding.  The Ministry of Transportation and Civil 
Aviation (MoTCA) has used up all the ADB funding on cost over-runs 
at other airports.  The Afghan government has requested additional 
funding from the ADB, and Lithuania has tentatively allocated part 
of its budget for Afghanistan operations to improve the airport.  It 
is unlikely that the airstrip will be improved in the near to medium 
term. 
 
In The Beginning 
---------------- 
2. (SBU) In November 2004, the ADB provided approximately USD 20 
million to the Afghan government for the rehabilitation and widening 
of existing runways and construction of aprons and taxi ways at 
selected regional airports.  The plan was to spend approximately USD 
3 million each on seven regional airports.  During the first round 
of bidding, a Turkish company submitted a bid for USD 13 million for 
the Chaghcharan project.  The bidding was subsequently re-opened but 
no bidders were qualified. 
 
3. (SBU) In mid-2007, the Lithuanian-led PRT in Ghor province became 
concerned when they learned that the refurbished runway would only 
support aircraft up to an operational weight of 21 tons.  The 
operational weight of a C-130 is approximately 71 tons, and the PRT 
is heavily dependent on C-130 traffic for life support due to its 
remote location and lack of serviceable roads.  Currently, 
Chaghcharan receives four to six C-130s in a week.  If the airstrip 
were refurbished only to the level requested by the Afghan 
government, the planned thin-crust runway would not support C-130s. 
Without C-130 supply flights, the PRT would have to close. 
 
Search for Alternative Sources of Funding 
----------------------------------------- 
4. (SBU) In its 2007 budget for Afghanistan operations, Lithuania 
did not allocate funds to upgrade the airport.  They contacted 
different entities to try to identify alternative sources of 
funding.  CSTC-A expressed interest in funding the difference 
between the amount that ADB would provide and the amount needed to 
make the airport C-130 worthy, since the airport is strategically 
important due to its location in the approximate geo-center of 
Afghanistan.  (Ghor's small population and limited agricultural and 
craft production are insufficient to make a strong economic argument 
for the airport.)  CSTC-A engineers estimated that it would cost 
approximately USD 28 million to make the Chaghcharan airport C-130 
capable. 
 
Lithuania Makes the Rounds 
--------------------------- 
5. (SBU) Lithuanian representatives raised their concerns with the 
governor of Ghor Province, CSTC-A, ISAF HQ, the ADB and the MoTCA. 
After several on-again, off-again rounds between the ADB and the 
MoTCA, the project stalled because it was dependent on having funds 
left over after other, higher-priority airports were refurbished 
(such as Badghis, Faryab and Badakhshan).  Unfortunately, cost 
over-runs have used up all the ADB funding.  CENTCOM has directed 
CSTC-A to focus on airports in southern Afghanistan and to be more 
"careful" about spending U.S. funds, and therefore CSTC-A has 
withdrawn its potential support for the Chaghcharan airport. 
 
Effort Continues 
---------------- 
6. (SBU) In March 2008, the MoTCA told the Lithuanians and ISAF that 
it would ask the ADB for additional funding for the Chaghcharan 
airport.  The MoTCA said that if the ADB turned down its request, 
MoTCA would go to the Ministry of Finance to identify other funding. 
 Lithuania has tentatively decided to allocate part of its budget 
for Afghanistan to improve the airport. 
 
KABUL 00001050  002 OF 002 
 
 
WOOD