Viewing cable 08MOSCOW104, ATOMSTROYEXPORT TO BUILD NUCLEAR PLANTS IN BULGARIA

If you are new to these pages, please read an introduction on the structure of a cable as well as how to discuss them with others. See also the FAQs

Understanding cables
Every cable message consists of three parts:
  • The top box shows each cables unique reference number, when and by whom it originally was sent, and what its initial classification was.
  • The middle box contains the header information that is associated with the cable. It includes information about the receiver(s) as well as a general subject.
  • The bottom box presents the body of the cable. The opening can contain a more specific subject, references to other cables (browse by origin to find them) or additional comment. This is followed by the main contents of the cable: a summary, a collection of specific topics and a comment section.
To understand the justification used for the classification of each cable, please use this WikiSource article as reference.

Discussing cables
If you find meaningful or important information in a cable, please link directly to its unique reference number. Linking to a specific paragraph in the body of a cable is also possible by copying the appropriate link (to be found at theparagraph symbol). Please mark messages for social networking services like Twitter with the hash tags #cablegate and a hash containing the reference ID e.g. #08MOSCOW104.
Reference ID Created Released Classification Origin
08MOSCOW104 2008-01-16 16:04 2011-08-24 01:00 UNCLASSIFIED//FOR OFFICIAL USE ONLY Embassy Moscow
VZCZCXRO3977
PP RUEHAG RUEHDF RUEHIK RUEHLZ RUEHROV
DE RUEHMO #0104 0161604
ZNR UUUUU ZZH
P 161604Z JAN 08
FM AMEMBASSY MOSCOW
TO RUEHC/SECSTATE WASHDC PRIORITY 6154
INFO RUCNMEM/EU MEMBER STATES COLLECTIVE PRIORITY
RHMFIUU/DEPT OF ENERGY WASHINGTON DC PRIORITY
UNCLAS MOSCOW 000104 
 
SIPDIS 
 
SENSITIVE 
SIPDIS 
 
E.O. 12958: N/A 
TAGS: KNNP PREL ENRG BU RS
SUBJECT: ATOMSTROYEXPORT TO BUILD NUCLEAR PLANTS IN BULGARIA 
 
1.  (SBU)  Summary:  AtomStroyExport will sign a six billion 
dollar contract to construct two third-generation nuclear 
reactors in Bulgaria.  The signing will take place on January 
18 during President Putin's visit to Bulgaria.  As part of a 
joint venture with Areva and Siemens, AtomStroyExport will be 
the prime contractor for the reactors.  Rosatom Director 
Kiriyenko has lauded the contract as signifying Russia's 
entry into the EU market for nuclear power plant 
construction.  End Summary. 
 
2.  (SBU)  Background:  The Soviet Union began construction 
of the Belene nuclear power plant in 1987.  At the request of 
the Bulgarian government, work ceased in 1991.  In November 
2006, Bulgaria and Russia signed a Letter of Intent to resume 
construction.  The EU did not agree to the project until late 
2007. 
 
3.  (SBU)  Alexey Ubeev, Deputy Director of External 
Relations of AtomStroyExport (ASE) confirmed to us January 16 
that ASE would sign a six billion dollar contract to build 
two third-generation nuclear reactors at the Belene site. 
The signing will take place on January 18 during President 
Putin's 2-day state visit.  While he would not elaborate on 
the details of the contract, Ubeev did say that ASE would be 
the primary contractor and that Areva and Siemens would be 
the European partners.  Russia will provide and install the 
reactor vessels and the turbines, with all of their 
associated hardware.  As part of the joint venture, Areva 
(France) and Siemens (Germany) will design, provide and 
install digital instrumentation and control systems, 
electrical equipment and some safety systems for the project. 
 Ubeev told us that all the work completed before the 1991 
construction halt would have to be removed to bring the plant 
up to contemporary standards.  This conforms with a recent 
statement by Rosatom Director Kiriyenko that the design of 
any nuclear power plants built in the EU would be in full 
compliance with EU safety standards. 
 
4.  (SBU)  Ubeev indicated that once the contract is signed, 
construction should begin later in 2008.  The goal is to have 
both reactors operational by 2014.  He mentioned that 
Kiriyenko had praised the contract as representing Russia's 
entry into the EU market for nuclear power plant construction. 
BURNS