Keep Us Strong WikiLeaks logo

Currently released so far... 143912 / 251,287

Articles

Browse latest releases

Browse by creation date

Browse by origin

A B C D F G H I J K L M N O P Q R S T U V W Y Z

Browse by tag

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
AORC AS AF AM AJ ASEC AU AMGT APER ACOA ASEAN AG AFFAIRS AR AFIN ABUD AO AEMR ADANA AMED AADP AINF ARF ADB ACS AE AID AL AC AGR ABLD AMCHAMS AECL AINT AND ASIG AUC APECO AFGHANISTAN AY ARABL ACAO ANET AFSN AZ AFLU ALOW ASSK AFSI ACABQ AMB APEC AIDS AA ATRN AMTC AVIATION AESC ASSEMBLY ADPM ASECKFRDCVISKIRFPHUMSMIGEG AGOA ASUP AFPREL ARNOLD ADCO AN ACOTA AODE AROC AMCHAM AT ACKM ASCH AORCUNGA AVIANFLU AVIAN AIT ASECPHUM ATRA AGENDA AIN AFINM APCS AGENGA ABDALLAH ALOWAR AFL AMBASSADOR ARSO AGMT ASPA AOREC AGAO ARR AOMS ASC ALIREZA AORD AORG ASECVE ABER ARABBL ADM AMER ALVAREZ AORCO ARM APERTH AINR AGRI ALZUGUREN ANGEL ACDA AEMED ARC AMGMT AEMRASECCASCKFLOMARRPRELPINRAMGTJMXL ASECAFINGMGRIZOREPTU ABMC AIAG ALJAZEERA ASR ASECARP ALAMI APRM ASECM AMPR AEGR AUSTRALIAGROUP ASE AMGTHA ARNOLDFREDERICK AIDAC AOPC ANTITERRORISM ASEG AMIA ASEX AEMRBC AFOR ABT AMERICA AGENCIES AGS ADRC ASJA AEAID ANARCHISTS AME AEC ALNEA AMGE AMEDCASCKFLO AK ANTONIO ASO AFINIZ ASEDC AOWC ACCOUNT ACTION AMG AFPK AOCR AMEDI AGIT ASOC ACOAAMGT AMLB AZE AORCYM AORL AGRICULTURE ACEC AGUILAR ASCC AFSA ASES ADIP ASED ASCE ASFC ASECTH AFGHAN ANTXON APRC AFAF AFARI ASECEFINKCRMKPAOPTERKHLSAEMRNS AX ALAB ASECAF ASA ASECAFIN ASIC AFZAL AMGTATK ALBE AMT AORCEUNPREFPRELSMIGBN AGUIRRE AAA ABLG ARCH AGRIC AIHRC ADEL AMEX ALI AQ ATFN AORCD ARAS AINFCY AFDB ACBAQ AFDIN AOPR AREP ALEXANDER ALANAZI ABDULRAHMEN ABDULHADI ATRD AEIR AOIC ABLDG AFR ASEK AER ALOUNI AMCT AVERY ASECCASC ARG APR AMAT AEMRS AFU ATPDEA ALL ASECE ANDREW
EAIR ECON ETRD EAGR EAID EFIN ETTC ENRG EMIN ECPS EG EPET EINV ELAB EU ECONOMICS EC EZ EUN EN ECIN EWWT EXTERNAL ENIV ES ESA ELN EFIS EIND EPA ELTN EXIM ET EINT EI ER EAIDAF ETRO ETRDECONWTOCS ECTRD EUR ECOWAS ECUN EBRD ECONOMIC ENGR ECONOMY EFND ELECTIONS EPECO EUMEM ETMIN EXBS EAIRECONRP ERTD EAP ERGR EUREM EFI EIB ENGY ELNTECON EAIDXMXAXBXFFR ECOSOC EEB EINF ETRN ENGRD ESTH ENRC EXPORT EK ENRGMO ECO EGAD EXIMOPIC ETRDPGOV EURM ETRA ENERG ECLAC EINO ENVIRONMENT EFIC ECIP ETRDAORC ENRD EMED EIAR ECPN ELAP ETCC EAC ENEG ESCAP EWWC ELTD ELA EIVN ELF ETR EFTA EMAIL EL EMS EID ELNT ECPSN ERIN ETT EETC ELAN ECHEVARRIA EPWR EVIN ENVR ENRGJM ELBR EUC EARG EAPC EICN EEC EREL EAIS ELBA EPETUN EWWY ETRDGK EV EDU EFN EVN EAIDETRD ENRGTRGYETRDBEXPBTIOSZ ETEX ESCI EAIDHO EENV ETRC ESOC EINDQTRD EINVA EFLU EGEN ECE EAGRBN EON EFINECONCS EIAD ECPC ENV ETDR EAGER ETRDKIPR EWT EDEV ECCP ECCT EARI EINVECON ED ETRDEC EMINETRD EADM ENRGPARMOTRASENVKGHGPGOVECONTSPLEAID ETAD ECOM ECONETRDEAGRJA EMINECINECONSENVTBIONS ESSO ETRG ELAM ECA EENG EITC ENG ERA EPSC ECONEINVETRDEFINELABETRDKTDBPGOVOPIC EIPR ELABPGOVBN EURFOR ETRAD EUE EISNLN ECONETRDBESPAR ELAINE EGOVSY EAUD EAGRECONEINVPGOVBN EINVETRD EPIN ECONENRG EDRC ESENV EB ENER ELTNSNAR EURN ECONPGOVBN ETTF ENVT EPIT ESOCI EFINOECD ERD EDUC EUM ETEL EUEAID ENRGY ETD EAGRE EAR EAIDMG EE EET ETER ERICKSON EIAID EX EAG EBEXP ESTN EAIDAORC EING EGOV EEOC EAGRRP EVENTS ENRGKNNPMNUCPARMPRELNPTIAEAJMXL ETRDEMIN EPETEIND EAIDRW ENVI ETRDEINVECINPGOVCS EPEC EDUARDO EGAR EPCS EPRT EAIDPHUMPRELUG EPTED ETRB EPETPGOV ECONQH EAIDS EFINECONEAIDUNGAGM EAIDAR EAGRBTIOBEXPETRDBN ESF EINR ELABPHUMSMIGKCRMBN EIDN ETRK ESTRADA EXEC EAIO EGHG ECN EDA ECOS EPREL EINVKSCA ENNP ELABV ETA EWWTPRELPGOVMASSMARRBN EUCOM EAIDASEC ENR END EP ERNG ESPS EITI EINTECPS EAVI ECONEFINETRDPGOVEAGRPTERKTFNKCRMEAID ELTRN EADI ELDIN ELND ECRM EINVEFIN EAOD EFINTS EINDIR ENRGKNNP ETRDEIQ ETC EAIRASECCASCID EINN ETRP EAIDNI EFQ ECOQKPKO EGPHUM EBUD EAIT ECONEINVEFINPGOVIZ EWWI ENERGY ELB EINDETRD EMI ECONEAIR ECONEFIN EHUM EFNI EOXC EISNAR ETRDEINVTINTCS EIN EFIM EMW ETIO ETRDGR EMN EXO EATO EWTR ELIN EAGREAIDPGOVPRELBN EINVETC ETTD EIQ ECONCS EPPD ESS EUEAGR ENRGIZ EISL EUNJ EIDE ENRGSD ELAD ESPINOSA ELEC EAIG ESLCO ENTG ETRDECD EINVECONSENVCSJA EEPET EUNCH ECINECONCS
KPKO KIPR KWBG KPAL KDEM KTFN KNNP KGIC KTIA KCRM KDRG KWMN KJUS KIDE KSUM KTIP KFRD KMCA KMDR KCIP KTDB KPAO KPWR KOMC KU KIRF KCOR KHLS KISL KSCA KGHG KS KSTH KSEP KE KPAI KWAC KFRDKIRFCVISCMGTKOCIASECPHUMSMIGEG KPRP KVPR KAWC KUNR KZ KPLS KN KSTC KMFO KID KNAR KCFE KRIM KFLO KCSA KG KFSC KSCI KFLU KMIG KRVC KV KVRP KMPI KNEI KAPO KOLY KGIT KSAF KIRC KNSD KBIO KHIV KHDP KBTR KHUM KSAC KACT KRAD KPRV KTEX KPIR KDMR KMPF KPFO KICA KWMM KICC KR KCOM KAID KINR KBCT KOCI KCRS KTER KSPR KDP KFIN KCMR KMOC KUWAIT KIPRZ KSEO KLIG KWIR KISM KLEG KTBD KCUM KMSG KMWN KREL KPREL KAWK KIMT KCSY KESS KWPA KNPT KTBT KCROM KPOW KFTN KPKP KICR KGHA KOMS KJUST KREC KOC KFPC KGLB KMRS KTFIN KCRCM KWNM KHGH KRFD KY KGCC KFEM KVIR KRCM KEMR KIIP KPOA KREF KJRE KRKO KOGL KSCS KGOV KCRIM KEM KCUL KRIF KCEM KITA KCRN KCIS KSEAO KWMEN KEANE KNNC KNAP KEDEM KNEP KHPD KPSC KIRP KUNC KALM KCCP KDEN KSEC KAYLA KIMMITT KO KNUC KSIA KLFU KLAB KTDD KIRCOEXC KECF KIPRETRDKCRM KNDP KIRCHOFF KJAN KFRDSOCIRO KWMNSMIG KEAI KKPO KPOL KRD KWMNPREL KATRINA KBWG KW KPPD KTIAEUN KDHS KRV KBTS KWCI KICT KPALAOIS KPMI KWN KTDM KWM KLHS KLBO KDEMK KT KIDS KWWW KLIP KPRM KSKN KTTB KTRD KNPP KOR KGKG KNN KTIAIC KSRE KDRL KVCORR KDEMGT KOMO KSTCC KMAC KSOC KMCC KCHG KSEPCVIS KGIV KPO KSEI KSTCPL KSI KRMS KFLOA KIND KPPAO KCM KRFR KICCPUR KFRDCVISCMGTCASCKOCIASECPHUMSMIGEG KNNB KFAM KWWMN KENV KGH KPOP KFCE KNAO KTIAPARM KWMNKDEM KDRM KNNNP KEVIN KEMPI KWIM KGCN KUM KMGT KKOR KSMT KISLSCUL KNRV KPRO KOMCSG KLPM KDTB KFGM KCRP KAUST KNNPPARM KUNH KWAWC KSPA KTSC KUS KSOCI KCMA KTFR KPAOPREL KNNPCH KWGB KSTT KNUP KPGOV KUK KMNP KPAS KHMN KPAD KSTS KCORR KI KLSO KWNN KNP KPTD KESO KMPP KEMS KPAONZ KPOV KTLA KPAOKMDRKE KNMP KWMNCI KWUN KRDP KWKN KPAOY KEIM KGICKS KIPT KREISLER KTAO KJU KLTN KWMNPHUMPRELKPAOZW KEN KQ KWPR KSCT KGHGHIV KEDU KRCIM KFIU KWIC KNNO KILS KTIALG KNNA KMCAJO KINP KRM KLFLO KPA KOMCCO KKIV KHSA KDM KRCS KWBGSY KISLAO KNPPIS KNNPMNUC KCRI KX KWWT KPAM KVRC KERG KK KSUMPHUM KACP KSLG KIF KIVP KHOURY KNPR KUNRAORC KCOG KCFC KWMJN KFTFN KTFM KPDD KMPIO KCERS KDUM KDEMAF KMEPI KHSL KEPREL KAWX KIRL KNNR KOMH KMPT KISLPINR KADM KPER KTPN KSCAECON KA KJUSTH KPIN KDEV KCSI KNRG KAKA KFRP KTSD KINL KJUSKUNR KQM KQRDQ KWBC KMRD KVBL KOM KMPL KEDM KFLD KPRD KRGY KNNF KPROG KIFR KPOKO KM KWMNCS KAWS KLAP KPAK KHIB KOEM KDDG KCGC
PGOV PREL PK PTER PINR PO PHUM PARM PREF PINF PRL PM PINS PROP PALESTINIAN PE PBTS PNAT PHSA PL PA PSEPC POSTS POLITICS POLICY POL PU PAHO PHUMPGOV PGOG PARALYMPIC PGOC PNR PREFA PMIL POLITICAL PROV PRUM PBIO PAK POV POLG PAR POLM PHUMPREL PKO PUNE PROG PEL PROPERTY PKAO PRE PSOE PHAS PNUM PGOVE PY PIRF PRES POWELL PP PREM PCON PGOVPTER PGOVPREL PODC PTBS PTEL PGOVTI PHSAPREL PD PG PRC PVOV PLO PRELL PEPFAR PREK PEREZ PINT POLI PPOL PARTIES PT PRELUN PH PENA PIN PGPV PKST PROTESTS PHSAK PRM PROLIFERATION PGOVBL PAS PUM PMIG PGIC PTERPGOV PSHA PHM PHARM PRELHA PELOSI PGOVKCMABN PQM PETER PJUS PKK POUS PTE PGOVPRELPHUMPREFSMIGELABEAIDKCRMKWMN PERM PRELGOV PAO PNIR PARMP PRELPGOVEAIDECONEINVBEXPSCULOIIPBTIO PHYTRP PHUML PFOV PDEM PUOS PN PRESIDENT PERURENA PRIVATIZATION PHUH PIF POG PERL PKPA PREI PTERKU PSEC PRELKSUMXABN PETROL PRIL POLUN PPD PRELUNSC PREZ PCUL PREO PGOVZI POLMIL PERSONS PREFL PASS PV PETERS PING PQL PETR PARMS PNUC PS PARLIAMENT PINSCE PROTECTION PLAB PGV PBS PGOVENRGCVISMASSEAIDOPRCEWWTBN PKNP PSOCI PSI PTERM PLUM PF PVIP PARP PHUMQHA PRELNP PHIM PRELBR PUBLIC PHUMKPAL PHAM PUAS PBOV PRELTBIOBA PGOVU PHUMPINS PICES PGOVENRG PRELKPKO PHU PHUMKCRS POGV PATTY PSOC PRELSP PREC PSO PAIGH PKPO PARK PRELPLS PRELPK PHUS PPREL PTERPREL PROL PDA PRELPGOV PRELAF PAGE PGOVGM PGOVECON PHUMIZNL PMAR PGOVAF PMDL PKBL PARN PARMIR PGOVEAIDUKNOSWGMHUCANLLHFRSPITNZ PDD PRELKPAO PKMN PRELEZ PHUMPRELPGOV PARTM PGOVEAGRKMCAKNARBN PPEL PGOVPRELPINRBN PGOVSOCI PWBG PGOVEAID PGOVPM PBST PKEAID PRAM PRELEVU PHUMA PGOR PPA PINSO PROVE PRELKPAOIZ PPAO PHUMPRELBN PGVO PHUMPTER PAGR PMIN PBTSEWWT PHUMR PDOV PINO PARAGRAPH PACE PINL PKPAL PTERE PGOVAU PGOF PBTSRU PRGOV PRHUM PCI PGO PRELEUN PAC PRESL PORG PKFK PEPR PRELP PMR PRTER PNG PGOVPHUMKPAO PRELECON PRELNL PINOCHET PAARM PKPAO PFOR PGOVLO PHUMBA POPDC PRELC PHUME PER PHJM POLINT PGOVPZ PGOVKCRM PAUL PHALANAGE PARTY PPEF PECON PEACE PROCESS PPGOV PLN PRELSW PHUMS PRF PEDRO PHUMKDEM PUNR PVPR PATRICK PGOVKMCAPHUMBN PRELA PGGV PSA PGOVSMIGKCRMKWMNPHUMCVISKFRDCA PGIV PRFE POGOV PBT PAMQ

Browse by classification

Community resources

courage is contagious

Viewing cable 06BUENOSAIRES2808, AMBASSADOR HOSTS ELECTRICITY, GAS SECTOR U.S. INVESTOR

If you are new to these pages, please read an introduction on the structure of a cable as well as how to discuss them with others. See also the FAQs

Understanding cables
Every cable message consists of three parts:
  • The top box shows each cables unique reference number, when and by whom it originally was sent, and what its initial classification was.
  • The middle box contains the header information that is associated with the cable. It includes information about the receiver(s) as well as a general subject.
  • The bottom box presents the body of the cable. The opening can contain a more specific subject, references to other cables (browse by origin to find them) or additional comment. This is followed by the main contents of the cable: a summary, a collection of specific topics and a comment section.
To understand the justification used for the classification of each cable, please use this WikiSource article as reference.

Discussing cables
If you find meaningful or important information in a cable, please link directly to its unique reference number. Linking to a specific paragraph in the body of a cable is also possible by copying the appropriate link (to be found at theparagraph symbol). Please mark messages for social networking services like Twitter with the hash tags #cablegate and a hash containing the reference ID e.g. #06BUENOSAIRES2808.
Reference ID Created Released Classification Origin
06BUENOSAIRES2808 2006-12-21 20:11 2011-08-26 00:00 UNCLASSIFIED//FOR OFFICIAL USE ONLY Embassy Buenos Aires
VZCZCXYZ0000
RR RUEHWEB

DE RUEHBU #2808/01 3552011
ZNR UUUUU ZZH
R 212011Z DEC 06
FM AMEMBASSY BUENOS AIRES
TO RUEHC/SECSTATE WASHDC 6827
INFO RUEATRS/DEPT OF TREASURY WASHINGTON DC
RUCPDOC/USDOC WASHINGTON DC
RUEHRC/DEPT OF AGRICULTURE USD FAS WASHINGTON DC
RUEHC/DEPT OF LABOR WASHINGTON DC
RHMFIUU/HQ USSOUTHCOM MIAMI FL
RUEHAC/AMEMBASSY ASUNCION 5816
RUEHMN/AMEMBASSY MONTEVIDEO 6032
RUEHSG/AMEMBASSY SANTIAGO 0022
RUEHBR/AMEMBASSY BRASILIA 5671
RUEHSG/AMEMBASSY SANTIAGO 0023
RUEHLP/AMEMBASSY LA PAZ DEC SAO PAULO 3071
RUEHRI/AMCONSUL RIO DE JANEIRO 2081
UNCLAS BUENOS AIRES 002808 
 
SIPDIS 
 
SIPDIS 
SENSITIVE 
 
EB/ESC/IEC FOR SGALLOGLY, MMCMANUS,JIZZO 
WHA FOR WHA/BSC AND WHA/EPSC 
E FOR THOMAS PIERCE 
PASS NSC FOR JOSE CARDENAS 
PASS FED BOARD OF GOVERNORS FOR PATRICE ROBITAILLE 
PASS USTR FOR SUE CRONIN AND MARY SULLIVAN 
TREASURY FOR ALICE FAIBISHENKO 
USDOC FOR 4322/ITA/MAC/OLAC/PEACHER 
US SOUTHCOM FOR POLAD 
 
E.O. 12958: N/A 
TAGS: ENRG EPET ECON ETRD AR
SUBJECT: AMBASSADOR HOSTS ELECTRICITY, GAS SECTOR U.S. INVESTOR 
ROUNDTABLE 
 
Ref:  (A) Buenos Aires 2598 
      (B) Buenos Aires 2594 
      (C) Buenos Aires 2683 
 
------- 
Summary 
------- 
 
1. (SBU) Country managers of U.S. players in Argentina's electricity 
and natural gas sectors met with Ambassador to review constraints 
imposed by GoA regulations, uncertain natural gas supplies for 
generation, and frozen retail electricity and gas tariffs. 
Participants representing AES, CMS, Duke, Eton Park and E-On 
detailed company-specific stories about how GoA regulations and 
price controls imposed after the 2001 economic crisis had impacted 
their operations and strategic approach to the Argentine energy 
market.  They complained about unmet GoA contractual obligations 
(including late capacity payments electricity generators) and unmet 
GoA promises (including delays of promised 2006 tariff review until 
after October 2007 elections). 
 
2. (SBU) All participants agreed that electricity and gas regulatory 
authorities established during Argentina's 1990s privatization 
process were no longer independent.  They saw little in the way of 
long term vision in the GoA's energy policy mix, but rather a short 
term focus on maintaining below market consumer prices in this 
pre-election year.  They doubted that the GoA would - as it has 
promised - move to a less regulated electricity and gas pricing 
model by 2008.  Finally, most participants argued that, while they 
could adapt their operating and investment strategies to a 
suboptimal but stable policy mix, the GoA's penchant for changing 
the rules of the energy sector game preemptively and without 
consultation made it difficult for them to justify investments in 
expanded energy capacity the Argentine market needs.  Participants 
accepted Ambassador's offer to set up a roundtable meeting with 
Planning Minister De Vido to offer a forum for the GoA to address 
these issues.  END SUMMARY. 
 
--------------------------------------------- --------- 
Complaints: Politicized Regulation, Lack of GoA Vision 
--------------------------------------------- --------- 
 
3. (SBU) In the second in a series of sector-specific roundtables 
with U.S. investors (the first was held with upstream and downstream 
hydrocarbon investors - see Ref A), Amb met December 13 with 
representatives of U.S. electricity generation, transmission, and 
distribution as well as natural gas pipeline and distribution 
players.  Attendees included AES Country Manger Eduardo Dutrey; CMS 
CEO Bernardo Velar de Irigoyen; Duke Energy Country Manager 
Guillermo Fiad; E-On USA Country Manager Enrique Flaiban; and Eton 
Park consultant Federico Ravazzani.  Participants reviewed operating 
constraints imposed by the GoA's energy sector regulations, 
uncertain natural gas supplies for generation, frozen retail 
electricity and gas tariffs and discussed how these have affected 
their business strategy and investment decisions. 
 
4. (SBU) Participants detailed company-specific stories about how 
GoA regulations and price controls imposed following the 2001 
economic crisis, had impacted their profitability, operational 
viability and strategic approach to the Argentine energy market. 
Hydro and thermal electricity generators (AES, CMS and Duke) 
complained of GoA electricity pricing formulas for spot market sales 
that are roughly 65% below regulated rates charged by generators in 
neighboring countries.  Generators explained that these rates 
covered only their variable costs and characterized the GoA's 
below-market pricing formulas as broadly populist, inefficient 
(insofar as they subsidize users who can afford to pay more) and as 
"indirect expropriation" of generator investments.  Further, they 
 
 
 
noted that the GoA's regulated wholesaler CAMMESA has only made 
payments to them for spot electricity sales through July. 
 
5. (SBU) Electricity distributor AES noted that it was only 
partially allowed to implement industrial and wholesale end-user 
tariff rate increases negotiated with the GoA and that a full tariff 
review for one of its distributors promised by the GoA in 2006 had 
been delayed until after October 2007 elections as a matter of 
"political expediency."  Gas transportation company CMS called 
favorable an ICSID ruling directing the GoA to pay it $130 million 
in compensation for contractual breaches in CMS' investment in one 
of the national gas pipelines.  However, CMS complained that the 
GoA's ongoing diversion of gas supplies to the domestic market had 
forced it to default on contacted natural gas sales to Chile.  Gas 
distribution company E-On complained that retail gas tariffs it is 
able to charge Argentine end consumers are roughly 10 times lower 
than rates normally charged in Brazil and Chile and argued that the 
GoA was "not respecting the contractual rules of the game" by 
failing to approve the pass through of increased costs to consumers. 
 
 
6. (SBU)  All participants agreed that independent electricity and 
gas regulatory authorities established during Argentina's 1990s 
privatization process had long since been subordinated to the 
post-crisis political process and were no longer independent.  They 
saw little in the way of long term vision in the GoA's energy policy 
mix, but rather a short term focus on maintaining below market 
consumer prices in this pre-election year.  They doubted that the 
GoA would - as it has promised - move to a substantially less 
regulated electricity and gas pricing model by 2008.  Finally, 
participants argued that, while they could adapt their operating and 
investment strategies to a suboptimal but stable policy mix, the 
GoA's penchant for changing the rules of the energy sector game 
preemptively and without consultation made it difficult for them to 
justify to their Boards of Directors investments in expanded 
capacity that the Argentine market needs. 
 
7. (SBU) Ambassador noted that Planning Minister De Vido had earlier 
offered to co-host sector-specific roundtables with the Ambassador 
to address U.S. investor concerns.  Participants agreed that such a 
roundtable would offer a forum for the GoA to address broad 
regulatory inconsistencies and asked the Ambassador to request a 
meeting in January. 
 
------------------------------ 
Argentina's Electricity Sector 
------------------------------ 
 
8. (SBU) Argentina has the third-largest power market in Latin 
America, relying mostly on hydropower and natural gas-fired thermal 
plants for most of its electricity supply.  With approximately 28 
gigawatts of installed generation capacity, 61% of Argentina's 
electricity production capacity is fossil fuel-based (primarily 
natural gas) and 35% is hydroelectric.  Subsidized domestic demand 
has raised generating capacity utilization to internationally 
accepted limits, and experts are projecting power shortages this 
austral summer. 
 
9. (SBU) Following the 2001/2002 economic crisis, the GoA pessified 
capacity payments to generators, reducing them to roughly 40% of 
their earlier dollar value, and changed the structure of electricity 
spot pricing so as to make investments in generation, particularly 
in marginal capacity, much less attractive.  These interventions 
resulted in an electricity sector pricing mechanism for the 
wholesale generation market that provides few incentives for new 
greenfield investment.  Private electricity sector players charge 
that, over the last four years, the GoA has undermined the 
electricity sector by freezing energy prices, manipulating the 
 
 
 
methodology used to set market prices, and effectively confiscating 
funds owed to private companies.  The GoA has committed to 
"normalize" electricity sector tariffs by 2008. 
 
10. (SBU) FONINVENMEM (Fondo de Inversiones en Mercado Electrico 
Mayorista:) With voluntary private investment in new electricity 
generating capacity limited by GoA price controls and investor 
concerns over rapid GoA shifts in sector regulation, the GoA created 
a fiduciary fund, FONINVENMEM, to "encourage" new investment in two 
new 800 MW combined cycle plants in Buenos Aires and Santa Fe 
provinces.  The plants will cost $1.2 billion, of which $450 million 
is being funded by the swap of outstanding CAMMESA (the GoA's 
regulated electricity wholesaler) debt to generators into 
FONIMVENMEM equity.  The GoA has stated that the remaining $750 
million will be funded via a 3-4% surcharge on medium and large 
electricity users over the next 5 years, via private pension fund 
financing and via new investors. 
 
11. (SBU) Generators' share of FONINVENMEM investment is roughly 
based on their share of domestic generating capacity, though the 
GoA's participation formula favors both higher margin hydroelectric 
producers and those generators who sell onto the spot market rather 
than through long term supply contracts.  Of U.S. generation 
players, AES holds 20% and Duke 5%.  France's Total (which announced 
the sale of its Argentine generating assets to a local group and to 
Merrill Lynch) holds 28%, Spain's Endessa 23%, and Petrobras 10%. 
In exchange for this investment, the GoA has committed to (1) have 
the GoA's regulated wholesale distributor, CAMESA, sign a power 
purchase agreement to guaranty the profitability of the two new 
plants; (2) secure dedicated gas supplies for the new plants; and 
(3) eventually transition to a free market in energy after the two 
new plants are on line. 
 
12. (SBU) Electricity Generators Collections from CAMMESA:   U.S. 
electricity generators project continued difficulty collecting full 
payment from the GoA/CAMMESA for 2007 power sales.   These concerns 
are based on the growing CAMMESA deficit due to the mismatch between 
regulated prices and power production costs.  According to a report 
prepared by CAMMESA, a cash deficit of about US$ 580 million is 
expected for the November 2006 - March 2007 period. As of November 
2006, only payments owed for July 2006 had been paid in full, 
leaving August, September and October unpaid. 
 
13. (SBU)  ICSID Arbitration Claims:  Numerous electricity sector 
players in Argentina have filed ICSID claims seeking compensation 
for some combination of (1) the GoA's pre-crisis de-linking of power 
tariffs from the U.S. PPI; and (2) post-emergency law pesification 
of generation capacity cost and variable cost payments by regulated 
wholesaler CAMMESA.  Pre-crisis capacity payments to generators were 
roughly US$10 /MW while current payments total ARP 12/MW. 
 
-------------------------------------------- 
AES: Electricity Generation and Distribution 
-------------------------------------------- 
14. (U) With over $1 billion invested since 1993 and over 1,600 
employees, AES operates 6 hydro and gas-fired power plants in Salta, 
San Juan, Neuquin and Buenos Aires provinces with the capacity to 
produce 2.8 GW, 12% of Argentina's total installed capacity.  AES is 
the third largest private generator, behind ENDESA (Spain) and 
TotalFina/Elf (France).  AES also owns three distribution companies, 
EDELAP, EDEN and EDES, all in the province of Buenos Aires that 
provide energy to more than 750,000 customers. 
 
15. (SBU) AES holds a $60 million in the two new FONIMVENMEM 
generation plants.  AES filed an ICSID claim in 2002 seeking 
compensation for the GoA's post-emergency law pesification of 
capacity and variable cost payments to generators and the 
pesification and freezing of end-user electricity fees paid to 
 
 
 
distributors.  In August 2005, AES agreed to suspend this ICSID suit 
in exchange for a GoA promise to permit a tariff increases in 
distributor AES' EDELAP electricity rates for rural industrial and 
commercial (but not politically sensitive residential) clients and 
to follow-on with a February 2006 full renegotiation of EDELAP's 
rate base.  According to AES country manager Dutrey, the GoA 
ultimately allowed only a partial implementation of this agreed rate 
increase and the promised February 2006 rate base renegotiation was 
postponed until after October 2007 elections. 
 
------------------------------------------- 
CMS: Electricity Generation & Gas Pipelines 
------------------------------------------- 
 
16. (U) CMS entered the Argentine market in 1993 in electricity 
generation, gas transportation and trading services.  Its assets 
include three power plants totaling 2000 MW installed capacity, CMS 
Ensneada, Centrales Termicas Mendoza and Hidroelectrica El Chocon, 
as well as stakes in three gas pipelines, Transportadora de Gas del 
Norte (TGN) , Transportador de Gas del Mercosur and the Atacama gas 
pipeline from Salta province to Chile. 
 
17. (SBU) In July 2001, CMS filed an ICSID case regarding its 
investment in TGN, one of the two privatized Argentine gas 
transportation companies, charging that the GoA violated US BIT 
obligations via its unilateral modification of the legal and 
regulatory framework governing TGN including the pre-crisis 
de-linking of gas tariffs from the U.S. PPI and the post-emergency 
law pesification and freezing of natural gas pipeline tariffs. In 
May 2005, an ICSID tribunal found in favor of CMS and awarded the 
company damages of approximately US$ 150 million.  This was the 
first final award issued of the xx claims pending.  The GoA has 
filed an appeal to nullify the ruling and the Foreign Ministry has 
since publicly pledged to respect final ICSID rulings after the 
appeals process has been completed. 
 
----------------------------------- 
Duke Energy: Electricity Generation 
----------------------------------- 
 
18. (SBU) Duke Argentina owns two power generating assets are 
located in Neuquen province:  The Planicie Banderita hydroelectric 
power station produces 479 MW and the Alto Valle gas-fired thermal 
station produces 80 MW.  Duke also conducts licensed trading and 
marketing in the wholesale electric and natural gas markets as of 
late 2000. 
 
19. (SBU) In discussions with the GoA, Duke has committed to upgrade 
its Alto Valle gas-fired plant to bring 17 MW of unused capacity on 
line.  In return, Duke has asked the GoA to lock-in scarce natural 
gas supplies for this plant.  Duke has also submitted plans to 
invest roughly $60 million to add 40MW of new generating turbines to 
its Neuquen hydro plant if an appropriate package of federal and 
provincial tax incentives can be negotiated. 
 
----------------------------------- 
Eton Park: Electricity Transmission 
----------------------------------- 
 
20. (SBU) Eton Park, a U.S. investment firm managing over US$5.5 
billion, signed in August 2006 a contract with Brazil's Petrobras 
Energia Argentina to purchase its 50% stake in Citilec SA, the 
company that holds a 52.7% majority share in Argentine power 
transporter Transener.  Petrobras's earlier takeover of independent 
Argentine energy group Perez Companc in 2003 was subject by GoA 
anti-trust authorities to Petrobras's sale of Perez Companc's stake 
in Transener.  Transener is the largest electrical power 
transmission company in Argentina.  The formerly state-owned company 
 
 
 
was privatized in 1993 with a 95 year concession and is considered 
to be one of the leading players internationally in long-distance 
power transmission.  It owns the national high-voltage transmission 
network, with over 8,800 kilometers of transmission lines, as well 
as the 5,500 kilometer network of its controlled subsidiary Transba. 
 In addition, Transener's Brazilian division separately operates 
over 2,300 kilometers of 500kV lines.  Transener's combined networks 
are one of the longest 500kV systems in the world, as well as 
extensive 125kV and 250kV lines. Eton Park's purchase is not yet 
finalized. 
 
--------------------------- 
E-On U.S.: Gas Distribution 
--------------------------- 
 
21. (SBU) E-On US, a U.S. subsidiary of Germany leading energy 
provider, acquired LG&E Energy in 2001.  Through this purchase, E-On 
now owns interests in three Argentine gas distribution companies: 
Distribuidora de Gas del Centro S.A.; Distribuidora de Gas Cuyana 
S.A.; and Gas Natural BAN S.A. These three gas distribution 
companies in which E.ON US has interests provide 33% of the natural 
gas consumed in Argentina, reaching a customer base of over 2.2 
million. 
 
22. (SBU) In late 2001, LG&E filed an ICSID suit against the GoA's 
pre-crisis de-linking of gas tariffs from the U.S. PPI and later 
amended the case to include the GoA's post-crisis pesification and 
freezing of these same tariffs.  In an October 3, 2006, ruling, an 
ICSID tribunal did hold that the GoA violated provisions of the US 
BIT.  However, at the same time, the tribunal exempted the GoA from 
liability for a 17 month December 1 2001 to April 26, 2003 emergency 
"state of necessity" period of the Duhalde presidency.  While 
damages have yet to be calculated by the tribunal, the precedent 
this ruling sets is troubling to many ICSID claimants. 
 
------- 
Comment 
------- 
 
23. (SBU) That U.S. electricity and gas sector players see little in 
the way of long term vision in the GoA's energy policy mix is 
consistent with views expressed earlier by U.S. upstream and 
downstream hydrocarbon players (Ref A).  Their doubt that the GoA 
will keep its promise to move a substantially less regulated 
electricity and gas pricing model by 2008 is troubling given the 
manifest need to expand domestic generating capacity to meet 
burgeoning demand.  While the potential for ongoing energy shortages 
and blackouts during the peak summer season has been a media staple 
for some time, most analysts believe the GoA will be able to muddle 
through -- perhaps with some rationing -- until October 2007 
elections.  But the reluctance of electricity sector players to 
invest in new capacity in the face of the GoA's heavy handed energy 
policy mix will eventually force the GoA to consider reforms.  The 
question is when and the only certainty is that substantive reforms 
will not be implemented before October 2007 elections. 
 
WAYNE