Viewing cable 06ROME2698, Edison Optimistic on Prospects of Turkey-Greece-Italy

If you are new to these pages, please read an introduction on the structure of a cable as well as how to discuss them with others. See also the FAQs

Understanding cables
Every cable message consists of three parts:
  • The top box shows each cables unique reference number, when and by whom it originally was sent, and what its initial classification was.
  • The middle box contains the header information that is associated with the cable. It includes information about the receiver(s) as well as a general subject.
  • The bottom box presents the body of the cable. The opening can contain a more specific subject, references to other cables (browse by origin to find them) or additional comment. This is followed by the main contents of the cable: a summary, a collection of specific topics and a comment section.
To understand the justification used for the classification of each cable, please use this WikiSource article as reference.

Discussing cables
If you find meaningful or important information in a cable, please link directly to its unique reference number. Linking to a specific paragraph in the body of a cable is also possible by copying the appropriate link (to be found at theparagraph symbol). Please mark messages for social networking services like Twitter with the hash tags #cablegate and a hash containing the reference ID e.g. #06ROME2698.
Reference ID Created Released Classification Origin
06ROME2698 2006-09-25 15:36 2011-08-24 01:00 UNCLASSIFIED Embassy Rome
VZCZCXRO9137
PP RUEHAG RUEHDF RUEHIK RUEHLZ
DE RUEHRO #2698/01 2681536
ZNR UUUUU ZZH
P 251536Z SEP 06
FM AMEMBASSY ROME
TO RUEHC/SECSTATE WASHDC PRIORITY 6045
INFO RUCNMEM/EU MEMBER STATES COLLECTIVE PRIORITY
RHEBAAA/DEPT OF ENERGY WASHDC PRIORITY
RUEHAK/AMEMBASSY ANKARA PRIORITY 3163
RUEHKB/AMEMBASSY BAKU PRIORITY 0085
RUEHSI/AMEMBASSY TBILISI PRIORITY 0208
RUEHMIL/AMCONSUL MILAN PRIORITY 7711
RUEHNP/AMCONSUL NAPLES PRIORITY 1873
RUEHFL/AMCONSUL FLORENCE PRIORITY 1760
UNCLAS SECTION 01 OF 02 ROME 002698 
 
SIPDIS 
 
SIPDIS 
 
E.O. 12958: N/A 
TAGS: EPET ENRG ETRD AJ AL RS TU GR IR IT
SUBJECT: Edison Optimistic on Prospects of Turkey-Greece-Italy 
Pipeline Completion, Requests Low-Profile USG Support 
 
REF: ROME 1667 
 
ROME 00002698  001.2 OF 002 
 
 
SUMMARY 
------- 
 
1.  In a meeting with A/Ecmin and ConGen Milan representatives, 
Roberto Poti, Vice President for Business Development of Edison, 
Italy's second largest energy company, expressed confidence that the 
natural gas pipeline connecting Greece and Italy will be completed 
by 2010.  Obstacles remaining include financing the Greek portion of 
the 300 million euro underwater pipeline connecting Greece and 
Italy, and clearly defining Turkey's role in the export of Azeri 
gas.  In Edison's view, Turkey would like to become a natural gas 
reseller, while Edison would prefer Turkey limit its role to that of 
a transit state.  Poti was emphatic that Turkey's selling Azeri gas 
would upset the "economics" of the project for Edison and would be a 
deal breaker.  End summary. 
 
2.  A/Ecmin and P/E Chief ConGen Milan met September 5 with Roberto 
Poti, the Edison official responsible for the company's 
participation in the Turkey-Greece-Italy (TGI) natural gas pipeline 
project.  A/Ecmin and Poti had previously met (reftel).  A/Ecmin 
reiterated the USG interest in Italy's energy security, and 
underscored that the USG views the TGI as a key project. 
 
3.  Poti expressed confidence the TGI project will be completed by 
2010-11. He also thought the pipeline connecting Azeri production 
fields to Turkey (via Georgia) should be operational by 2007, by 
which time the pipeline connecting Turkey to Greece should also be 
completed.  The final link between Greece and Italy, the 
Italy-Greece Interconnector, will be built by Edison and the Greek 
Public Gas Corporation (DEPA).  DEPA will be responsible for the 
Greek onshore portion of the pipeline, while an Edison/DEPA joint 
venture will carry out construction of the submerged pipeline 
connecting Italy and Greece (the "Poseidon" project). 
 
Financing 
--------- 
 
4.  Poti said Edison has the necessary 150 million euros to fund its 
portion of the Poseidon pipeline.  DEPA, however, will need EU 
funding.  Poti believes EU funding will be forthcoming due to strong 
Greek government support and because it has been identified as a 
"Project of European Interest." Under its agreement with DEPA, 
Edison will pay transit fees to DEPA for 20 years and thus guarantee 
cash flow for DEPA to repay its EU financing.  Marco Margheri, 
Edison's Brussels representative, indicated it might be helpful if 
the USG expressed support for the project as part of the greater 
U.S.-EU energy security dialogue. 
 
Italy-Greece (IGI) Pipeline "Purely a Commercial Venture" 
--------- ----------------- -------------------- -------- 
 
5.  Poti said that while sensitive to energy security matters, 
Edison is committed to the IGI for commercial purposes only and not 
by a desire to stop Gazprom's westward expansion.  He explained that 
because it is not a big energy company, like ENI, Edison must find 
alternative cheaper sources of natural gas to remain competitive. 
 
Azerbaijan 
---------- 
 
6.  Poti said PM Prodi had written the Government of Azerbaijan to 
support the Edison-Socar collaboration to extract natural gas from 
Azeri gas fields and that Edison had "no problems" with Azerbaijan. 
He was also unaware of any Russian pressures on Azerbaijan to block 
the project. 
 
7.  However, Poti said Edison cannot negotiate dates, volumes, and 
prices until the BP-Statoli-led consortium completes the Shah Deniz 
technical study. Edison believes the USG could help by urging BP (as 
the most "friendly" partner in the consortium) to complete the 
technical study as soon as possible. One key question for Edison is 
whether the Shah Deniz gas field can produce sufficient natural gas 
to allow Azerbaijan to export through the TGI.  (Note:  Edison 
expects to import approximately eight BCMs per year through the IGI; 
Greece, three BCMs per year.  See reftel.  End note.) 
 
8.  Poti does not think a USG direct intervention with the GOA is 
needed at this stage, although he would welcome the USG letting the 
GOA know of USG interest in the project. 
 
Turkey 
------ 
 
ROME 00002698  002.2 OF 002 
 
 
 
9.  Poti expressed concern over Turkey's desire to become an Azeri 
natural gas distributor, rather than only a transit country.  If 
Turkey becomes a gas reseller, Poti sees two negative results: 
Edison would have to pay Turkey additional fees, thus raising the 
cost of natural gas to Edison; and Turkey could pump other natural 
gas (Gazprom) into the TGI.  Poti said that the USG could help by 
urging Turkey to commit to the project as currently designed, with 
Turkey providing only transit services.  Edison would also like the 
USG to urge Turkey to sign onto the Italy-Greece intergovernmental 
agreement to make it a trilateral agreement.  To avoid collapse of 
the TGI project, Poti said Edison could agree to Turkey's Botas 
becoming a partner, but he did not specify how. 
 
Russia 
------ 
 
10.  Poti thinks Russia is no longer trying to block TGI 
construction and that Russian might see the pipeline as another 
means to export Gazprom gas to Europe. Poti related that during 
Russian President Putin's recent visit to Greece, Putin asked the 
Greeks if Russian gas could be pushed through the IGI and the Greeks 
told him that Gazprom should deal with Edison directly. 
 
Iran 
---- 
 
11.  Poti hinted at, but did not elaborate on, possible problems 
between Iran and Turkey, but he said Iran was not "hostile" to the 
project. 
 
Albania 
------- 
 
12.  Poti said there is EU political pressure to route the TGI 
through Albania.  Edison is vigorously opposed to this idea because 
there is no reason to route the gas through an additional country. 
"There must be no confusion between the concept of Albania's 
receiving natural gas, with which we agree, and Albania's 
transporting natural gas, which we do not," Poti said.  Edison is 
willing to provide Albania with natural gas and has offered to build 
a TGI spur pipeline to Albania, but sees no need for the entire 
pipeline to pass through Albania.  He said the pipeline goes through 
enough "problem states" and that Edison does not want to be 
Albania's hostage in the future.  Alluding to USG interest in 
enhancing EU energy security, Poti noted the USG could help by 
advocating with the EU that the IGI continue the route as planned. 
 
TGI and Nabucco 
--------------- 
 
13.  Poti believes the TGI and Nabucco projects (the latter linking 
Turkey and Austria via Bulgaria, Romania, and Hungary) are not 
incompatible.  To the contrary, he said, the two pipelines will 
complement each other, if the situation in Iraq and Iran stabilize. 
However, given the TGI's smaller scale and relative simplicity, Poti 
believes that the TGI is more likely to be completed first. 
 
SPOGLI