Keep Us Strong WikiLeaks logo

Currently released so far... 143912 / 251,287

Articles

Browse latest releases

Browse by creation date

Browse by origin

A B C D F G H I J K L M N O P Q R S T U V W Y Z

Browse by tag

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
AORC AS AF AM AJ ASEC AU AMGT APER ACOA ASEAN AG AFFAIRS AR AFIN ABUD AO AEMR ADANA AMED AADP AINF ARF ADB ACS AE AID AL AC AGR ABLD AMCHAMS AECL AINT AND ASIG AUC APECO AFGHANISTAN AY ARABL ACAO ANET AFSN AZ AFLU ALOW ASSK AFSI ACABQ AMB APEC AIDS AA ATRN AMTC AVIATION AESC ASSEMBLY ADPM ASECKFRDCVISKIRFPHUMSMIGEG AGOA ASUP AFPREL ARNOLD ADCO AN ACOTA AODE AROC AMCHAM AT ACKM ASCH AORCUNGA AVIANFLU AVIAN AIT ASECPHUM ATRA AGENDA AIN AFINM APCS AGENGA ABDALLAH ALOWAR AFL AMBASSADOR ARSO AGMT ASPA AOREC AGAO ARR AOMS ASC ALIREZA AORD AORG ASECVE ABER ARABBL ADM AMER ALVAREZ AORCO ARM APERTH AINR AGRI ALZUGUREN ANGEL ACDA AEMED ARC AMGMT AEMRASECCASCKFLOMARRPRELPINRAMGTJMXL ASECAFINGMGRIZOREPTU ABMC AIAG ALJAZEERA ASR ASECARP ALAMI APRM ASECM AMPR AEGR AUSTRALIAGROUP ASE AMGTHA ARNOLDFREDERICK AIDAC AOPC ANTITERRORISM ASEG AMIA ASEX AEMRBC AFOR ABT AMERICA AGENCIES AGS ADRC ASJA AEAID ANARCHISTS AME AEC ALNEA AMGE AMEDCASCKFLO AK ANTONIO ASO AFINIZ ASEDC AOWC ACCOUNT ACTION AMG AFPK AOCR AMEDI AGIT ASOC ACOAAMGT AMLB AZE AORCYM AORL AGRICULTURE ACEC AGUILAR ASCC AFSA ASES ADIP ASED ASCE ASFC ASECTH AFGHAN ANTXON APRC AFAF AFARI ASECEFINKCRMKPAOPTERKHLSAEMRNS AX ALAB ASECAF ASA ASECAFIN ASIC AFZAL AMGTATK ALBE AMT AORCEUNPREFPRELSMIGBN AGUIRRE AAA ABLG ARCH AGRIC AIHRC ADEL AMEX ALI AQ ATFN AORCD ARAS AINFCY AFDB ACBAQ AFDIN AOPR AREP ALEXANDER ALANAZI ABDULRAHMEN ABDULHADI ATRD AEIR AOIC ABLDG AFR ASEK AER ALOUNI AMCT AVERY ASECCASC ARG APR AMAT AEMRS AFU ATPDEA ALL ASECE ANDREW
EAIR ECON ETRD EAGR EAID EFIN ETTC ENRG EMIN ECPS EG EPET EINV ELAB EU ECONOMICS EC EZ EUN EN ECIN EWWT EXTERNAL ENIV ES ESA ELN EFIS EIND EPA ELTN EXIM ET EINT EI ER EAIDAF ETRO ETRDECONWTOCS ECTRD EUR ECOWAS ECUN EBRD ECONOMIC ENGR ECONOMY EFND ELECTIONS EPECO EUMEM ETMIN EXBS EAIRECONRP ERTD EAP ERGR EUREM EFI EIB ENGY ELNTECON EAIDXMXAXBXFFR ECOSOC EEB EINF ETRN ENGRD ESTH ENRC EXPORT EK ENRGMO ECO EGAD EXIMOPIC ETRDPGOV EURM ETRA ENERG ECLAC EINO ENVIRONMENT EFIC ECIP ETRDAORC ENRD EMED EIAR ECPN ELAP ETCC EAC ENEG ESCAP EWWC ELTD ELA EIVN ELF ETR EFTA EMAIL EL EMS EID ELNT ECPSN ERIN ETT EETC ELAN ECHEVARRIA EPWR EVIN ENVR ENRGJM ELBR EUC EARG EAPC EICN EEC EREL EAIS ELBA EPETUN EWWY ETRDGK EV EDU EFN EVN EAIDETRD ENRGTRGYETRDBEXPBTIOSZ ETEX ESCI EAIDHO EENV ETRC ESOC EINDQTRD EINVA EFLU EGEN ECE EAGRBN EON EFINECONCS EIAD ECPC ENV ETDR EAGER ETRDKIPR EWT EDEV ECCP ECCT EARI EINVECON ED ETRDEC EMINETRD EADM ENRGPARMOTRASENVKGHGPGOVECONTSPLEAID ETAD ECOM ECONETRDEAGRJA EMINECINECONSENVTBIONS ESSO ETRG ELAM ECA EENG EITC ENG ERA EPSC ECONEINVETRDEFINELABETRDKTDBPGOVOPIC EIPR ELABPGOVBN EURFOR ETRAD EUE EISNLN ECONETRDBESPAR ELAINE EGOVSY EAUD EAGRECONEINVPGOVBN EINVETRD EPIN ECONENRG EDRC ESENV EB ENER ELTNSNAR EURN ECONPGOVBN ETTF ENVT EPIT ESOCI EFINOECD ERD EDUC EUM ETEL EUEAID ENRGY ETD EAGRE EAR EAIDMG EE EET ETER ERICKSON EIAID EX EAG EBEXP ESTN EAIDAORC EING EGOV EEOC EAGRRP EVENTS ENRGKNNPMNUCPARMPRELNPTIAEAJMXL ETRDEMIN EPETEIND EAIDRW ENVI ETRDEINVECINPGOVCS EPEC EDUARDO EGAR EPCS EPRT EAIDPHUMPRELUG EPTED ETRB EPETPGOV ECONQH EAIDS EFINECONEAIDUNGAGM EAIDAR EAGRBTIOBEXPETRDBN ESF EINR ELABPHUMSMIGKCRMBN EIDN ETRK ESTRADA EXEC EAIO EGHG ECN EDA ECOS EPREL EINVKSCA ENNP ELABV ETA EWWTPRELPGOVMASSMARRBN EUCOM EAIDASEC ENR END EP ERNG ESPS EITI EINTECPS EAVI ECONEFINETRDPGOVEAGRPTERKTFNKCRMEAID ELTRN EADI ELDIN ELND ECRM EINVEFIN EAOD EFINTS EINDIR ENRGKNNP ETRDEIQ ETC EAIRASECCASCID EINN ETRP EAIDNI EFQ ECOQKPKO EGPHUM EBUD EAIT ECONEINVEFINPGOVIZ EWWI ENERGY ELB EINDETRD EMI ECONEAIR ECONEFIN EHUM EFNI EOXC EISNAR ETRDEINVTINTCS EIN EFIM EMW ETIO ETRDGR EMN EXO EATO EWTR ELIN EAGREAIDPGOVPRELBN EINVETC ETTD EIQ ECONCS EPPD ESS EUEAGR ENRGIZ EISL EUNJ EIDE ENRGSD ELAD ESPINOSA ELEC EAIG ESLCO ENTG ETRDECD EINVECONSENVCSJA EEPET EUNCH ECINECONCS
KPKO KIPR KWBG KPAL KDEM KTFN KNNP KGIC KTIA KCRM KDRG KWMN KJUS KIDE KSUM KTIP KFRD KMCA KMDR KCIP KTDB KPAO KPWR KOMC KU KIRF KCOR KHLS KISL KSCA KGHG KS KSTH KSEP KE KPAI KWAC KFRDKIRFCVISCMGTKOCIASECPHUMSMIGEG KPRP KVPR KAWC KUNR KZ KPLS KN KSTC KMFO KID KNAR KCFE KRIM KFLO KCSA KG KFSC KSCI KFLU KMIG KRVC KV KVRP KMPI KNEI KAPO KOLY KGIT KSAF KIRC KNSD KBIO KHIV KHDP KBTR KHUM KSAC KACT KRAD KPRV KTEX KPIR KDMR KMPF KPFO KICA KWMM KICC KR KCOM KAID KINR KBCT KOCI KCRS KTER KSPR KDP KFIN KCMR KMOC KUWAIT KIPRZ KSEO KLIG KWIR KISM KLEG KTBD KCUM KMSG KMWN KREL KPREL KAWK KIMT KCSY KESS KWPA KNPT KTBT KCROM KPOW KFTN KPKP KICR KGHA KOMS KJUST KREC KOC KFPC KGLB KMRS KTFIN KCRCM KWNM KHGH KRFD KY KGCC KFEM KVIR KRCM KEMR KIIP KPOA KREF KJRE KRKO KOGL KSCS KGOV KCRIM KEM KCUL KRIF KCEM KITA KCRN KCIS KSEAO KWMEN KEANE KNNC KNAP KEDEM KNEP KHPD KPSC KIRP KUNC KALM KCCP KDEN KSEC KAYLA KIMMITT KO KNUC KSIA KLFU KLAB KTDD KIRCOEXC KECF KIPRETRDKCRM KNDP KIRCHOFF KJAN KFRDSOCIRO KWMNSMIG KEAI KKPO KPOL KRD KWMNPREL KATRINA KBWG KW KPPD KTIAEUN KDHS KRV KBTS KWCI KICT KPALAOIS KPMI KWN KTDM KWM KLHS KLBO KDEMK KT KIDS KWWW KLIP KPRM KSKN KTTB KTRD KNPP KOR KGKG KNN KTIAIC KSRE KDRL KVCORR KDEMGT KOMO KSTCC KMAC KSOC KMCC KCHG KSEPCVIS KGIV KPO KSEI KSTCPL KSI KRMS KFLOA KIND KPPAO KCM KRFR KICCPUR KFRDCVISCMGTCASCKOCIASECPHUMSMIGEG KNNB KFAM KWWMN KENV KGH KPOP KFCE KNAO KTIAPARM KWMNKDEM KDRM KNNNP KEVIN KEMPI KWIM KGCN KUM KMGT KKOR KSMT KISLSCUL KNRV KPRO KOMCSG KLPM KDTB KFGM KCRP KAUST KNNPPARM KUNH KWAWC KSPA KTSC KUS KSOCI KCMA KTFR KPAOPREL KNNPCH KWGB KSTT KNUP KPGOV KUK KMNP KPAS KHMN KPAD KSTS KCORR KI KLSO KWNN KNP KPTD KESO KMPP KEMS KPAONZ KPOV KTLA KPAOKMDRKE KNMP KWMNCI KWUN KRDP KWKN KPAOY KEIM KGICKS KIPT KREISLER KTAO KJU KLTN KWMNPHUMPRELKPAOZW KEN KQ KWPR KSCT KGHGHIV KEDU KRCIM KFIU KWIC KNNO KILS KTIALG KNNA KMCAJO KINP KRM KLFLO KPA KOMCCO KKIV KHSA KDM KRCS KWBGSY KISLAO KNPPIS KNNPMNUC KCRI KX KWWT KPAM KVRC KERG KK KSUMPHUM KACP KSLG KIF KIVP KHOURY KNPR KUNRAORC KCOG KCFC KWMJN KFTFN KTFM KPDD KMPIO KCERS KDUM KDEMAF KMEPI KHSL KEPREL KAWX KIRL KNNR KOMH KMPT KISLPINR KADM KPER KTPN KSCAECON KA KJUSTH KPIN KDEV KCSI KNRG KAKA KFRP KTSD KINL KJUSKUNR KQM KQRDQ KWBC KMRD KVBL KOM KMPL KEDM KFLD KPRD KRGY KNNF KPROG KIFR KPOKO KM KWMNCS KAWS KLAP KPAK KHIB KOEM KDDG KCGC
PGOV PREL PK PTER PINR PO PHUM PARM PREF PINF PRL PM PINS PROP PALESTINIAN PE PBTS PNAT PHSA PL PA PSEPC POSTS POLITICS POLICY POL PU PAHO PHUMPGOV PGOG PARALYMPIC PGOC PNR PREFA PMIL POLITICAL PROV PRUM PBIO PAK POV POLG PAR POLM PHUMPREL PKO PUNE PROG PEL PROPERTY PKAO PRE PSOE PHAS PNUM PGOVE PY PIRF PRES POWELL PP PREM PCON PGOVPTER PGOVPREL PODC PTBS PTEL PGOVTI PHSAPREL PD PG PRC PVOV PLO PRELL PEPFAR PREK PEREZ PINT POLI PPOL PARTIES PT PRELUN PH PENA PIN PGPV PKST PROTESTS PHSAK PRM PROLIFERATION PGOVBL PAS PUM PMIG PGIC PTERPGOV PSHA PHM PHARM PRELHA PELOSI PGOVKCMABN PQM PETER PJUS PKK POUS PTE PGOVPRELPHUMPREFSMIGELABEAIDKCRMKWMN PERM PRELGOV PAO PNIR PARMP PRELPGOVEAIDECONEINVBEXPSCULOIIPBTIO PHYTRP PHUML PFOV PDEM PUOS PN PRESIDENT PERURENA PRIVATIZATION PHUH PIF POG PERL PKPA PREI PTERKU PSEC PRELKSUMXABN PETROL PRIL POLUN PPD PRELUNSC PREZ PCUL PREO PGOVZI POLMIL PERSONS PREFL PASS PV PETERS PING PQL PETR PARMS PNUC PS PARLIAMENT PINSCE PROTECTION PLAB PGV PBS PGOVENRGCVISMASSEAIDOPRCEWWTBN PKNP PSOCI PSI PTERM PLUM PF PVIP PARP PHUMQHA PRELNP PHIM PRELBR PUBLIC PHUMKPAL PHAM PUAS PBOV PRELTBIOBA PGOVU PHUMPINS PICES PGOVENRG PRELKPKO PHU PHUMKCRS POGV PATTY PSOC PRELSP PREC PSO PAIGH PKPO PARK PRELPLS PRELPK PHUS PPREL PTERPREL PROL PDA PRELPGOV PRELAF PAGE PGOVGM PGOVECON PHUMIZNL PMAR PGOVAF PMDL PKBL PARN PARMIR PGOVEAIDUKNOSWGMHUCANLLHFRSPITNZ PDD PRELKPAO PKMN PRELEZ PHUMPRELPGOV PARTM PGOVEAGRKMCAKNARBN PPEL PGOVPRELPINRBN PGOVSOCI PWBG PGOVEAID PGOVPM PBST PKEAID PRAM PRELEVU PHUMA PGOR PPA PINSO PROVE PRELKPAOIZ PPAO PHUMPRELBN PGVO PHUMPTER PAGR PMIN PBTSEWWT PHUMR PDOV PINO PARAGRAPH PACE PINL PKPAL PTERE PGOVAU PGOF PBTSRU PRGOV PRHUM PCI PGO PRELEUN PAC PRESL PORG PKFK PEPR PRELP PMR PRTER PNG PGOVPHUMKPAO PRELECON PRELNL PINOCHET PAARM PKPAO PFOR PGOVLO PHUMBA POPDC PRELC PHUME PER PHJM POLINT PGOVPZ PGOVKCRM PAUL PHALANAGE PARTY PPEF PECON PEACE PROCESS PPGOV PLN PRELSW PHUMS PRF PEDRO PHUMKDEM PUNR PVPR PATRICK PGOVKMCAPHUMBN PRELA PGGV PSA PGOVSMIGKCRMKWMNPHUMCVISKFRDCA PGIV PRFE POGOV PBT PAMQ

Browse by classification

Community resources

courage is contagious

Viewing cable 03TEGUCIGALPA1645, AES Attempts to Salvage 200MW Energy Contract and

If you are new to these pages, please read an introduction on the structure of a cable as well as how to discuss them with others. See also the FAQs

Understanding cables
Every cable message consists of three parts:
  • The top box shows each cables unique reference number, when and by whom it originally was sent, and what its initial classification was.
  • The middle box contains the header information that is associated with the cable. It includes information about the receiver(s) as well as a general subject.
  • The bottom box presents the body of the cable. The opening can contain a more specific subject, references to other cables (browse by origin to find them) or additional comment. This is followed by the main contents of the cable: a summary, a collection of specific topics and a comment section.
To understand the justification used for the classification of each cable, please use this WikiSource article as reference.

Discussing cables
If you find meaningful or important information in a cable, please link directly to its unique reference number. Linking to a specific paragraph in the body of a cable is also possible by copying the appropriate link (to be found at theparagraph symbol). Please mark messages for social networking services like Twitter with the hash tags #cablegate and a hash containing the reference ID e.g. #03TEGUCIGALPA1645.
Reference ID Created Released Classification Origin
03TEGUCIGALPA1645 2003-07-11 22:08 2011-08-26 00:00 UNCLASSIFIED//FOR OFFICIAL USE ONLY Embassy Tegucigalpa
This record is a partial extract of the original cable. The full text of the original cable is not available.
UNCLAS SECTION 01 OF 03 TEGUCIGALPA 001645 
 
SIPDIS 
 
SENSITIVE 
 
GUATEMALA FOR COMATT 
STATE FOR WHA/CEN 
 
E.O. 12958: N/A 
TAGS: ENRG EPET EINV ECON HO
SUBJECT: AES Attempts to Salvage 200MW Energy Contract and 
El Faro Project 
 
REF:  a) 01 TEGUCIGALPA 2872, b) 02 TEGUCIGALPA 02207, c) 02 
 
TEGUCIGALPA 02857, d) 02 TEGUCIGALPA 03184, e) 02 
TEGUCIGALPA 03273, f) 02 TEGUCIGALPA 03416, g) 02 
TEGUCIGALPA 03479 
 
THIS CABLE CONTAINS PROPRIETARY BUSINESS INFORMATION THAT 
SHOULD BE KEPT CLOSE HOLD. 
 
1. (SBU) AES Honduras' efforts to salvage its 200MW energy 
contract, awarded and signed Christmas day, 2002 (ref g) 
despite having overcome an unfair government procurement 
process and political influence, may be reaching the end of 
the road this month.  Apparently, due to financial and 
management restructuring, the company leadership have 
directed staff to cease any spending on the El Faro project 
in Honduras and instead find partners willing and able to 
meet conditions of the contract.  Although a U.S. oil and 
gas company with substantial interest in the Central 
American region is currently studying potential partnership 
in the LNG-powered project, any final decisions are months 
away.  Closing of an interim deal and payment of the 
required performance bond by a potential local partner, the 
Larach Group, has been delayed by Larach's concerns over the 
liability of committing to a project of this size.  On July 
3, AES requested authorization for a contingency plan that 
allows the project to be scaled down and use bunker fuel if 
financing for the LNG plant is not forthcoming in the next 
six months.  On July 9, the GOH refused to grant this 
authorization.  The GOH is threatening to cancel the 
contract and begin legal proceedings by mid July if AES does 
not pay the five million dollar performance bond.  End 
summary. 
 
--------------------------------------------- 
AES' Battle to Build Project and Win Contract 
--------------------------------------------- 
 
2. (SBU) For more than three years, AES has sought to build 
a regional 540 MW gas-turbine electric power project fueled 
with liquefied natural gas in Puerto Cortes.  The El Faro 
project was designed to provide power not only to Honduras 
but also El Salvador and other Central American countries. 
Throughout the process, AES requested and received extensive 
advocacy from the Embassy and US agencies in Washington. 
Post has treated this advocacy case as a priority because of 
the U.S. commercial interest, the important contribution of 
the project to lowering electricity costs in Honduras, and 
the potential for spurring investment and regional 
integration.  The Embassy has been in constant contact with 
decision-makers in the Honduran government at the highest 
level.  A contract to supply 200 MW of electricity by 2006, 
using natural gas, to the Honduran electric power utility 
ENEE was finally awarded in late 2002 and ratified in 
February. 
 
3. (SBU) To win this contract, AES had to overcome several 
obstacles including political influence stalling the 
processing of the project's environmental permit, several 
modifications to the bid specifications favoring local 
companies, six delays in the bid opening date (from January 
until July, 2002) and indications of an unfair evaluation 
process after the bid opening.  The "winning" local company, 
Lufussa was not disqualified despite the incompleteness in 
its offer related to transmission capacity.  The Ambassador 
and Embassy staff supported the company in insisting that 
the government acknowledge the flaws in the award process. 
This advocacy contributed to the government's eventual 
decision in early December 2002 to invalidate the tender and 
subsequently provide awards to both Lufussa (210 MW contract 
deliverable within two years) and AES (200 MW contract 
deliverable within four years) (Ref f, g).  Once the 
decision was made, the GOH rushed AES Honduras into a take- 
it-or-leave-it deal, insisting that the contract presented 
on December 24 be signed by December 27, without changes or 
time to send it in for corporate review, which AES Honduras 
President Carlos Pineda did.   Subsequently, the AES 
contract became a political football in the Honduran 
Congress, but eventually was approved, signed by the 
President in February and published in March. 
 
4. (SBU) In the meantime, AES Corporation in the US was 
undergoing financial and management restructuring.  A 
December settlement with creditors did not include any 
capital financing for the Honduras project.  Gas prices 
spiked in the run-up to the war in Iraq and have stayed 
relatively high since, complicating financing arrangements. 
AES' newly appointed chief of the Central American region 
visited Honduras to explore the possibilities of switching 
to a coal-fired plant.  He concluded it was unfeasible both 
legally and politically (especially since the company had 
spent three years pushing the benefits of bringing gas to 
Central America).  The company then directed the manager of 
AES Honduras to find partners to assume the development 
costs of the project.  AES has emphasized in conversations 
with Econoffs that the company had lost confidence in 
Honduras and its investment climate. 
 
--------------------------- 
AES Strategy for Next Steps 
--------------------------- 
 
5. (SBU) Thus, since February, AES Honduras has sought to 
find both a local partner and an international energy 
company to buy into the project.  These deals have not 
closed as quickly as hoped, and the company appears to be 
running out of time. 
 
6. (SBU) One US oil and gas company, active in Central 
America, is seriously studying a major investment (with 
majority control) in the El Faro project, and has begun its 
own internal studies of the project.  The company would 
bring to the table sufficient funding for the project 
(avoiding the need for a financing package) and its own gas 
reserves.  Investment by this multinational, or one like it, 
would allow the El Faro project to proceed in its original 
form using LNG and meeting all specifications of the 
original emergency contract.  A final decision will not be 
forthcoming, however, until at least November 2003. 
 
7. (SBU) To meet the immediate needs of providing a 
performance bond and final paperwork for an operating 
permit, AES is negotiating to sell a large majority of its 
shares now (up to 90 percent) to the Honduran Larach Group. 
Larach has been interested in participation in El Faro for 
quite some time, but realization of the difficult financing 
prospects for the LNG terminal has delayed the completion of 
the deal.  Recent news of high gas prices and a violent 
kidnapping attempt in June of Luis Larach, one of the 
principal negotiators, also affected the timing. 
 
8. (SBU) To square the circle, on July 3, AES proposed to 
ENEE and the GOH that the government agree that the 
investors would have the flexibility to build a thermal 
plant based on bunker fuel, if financing for the entire LNG 
project could not be found in the next six months.  The 
proposal would give the comfort level to the Larach group to 
sign its deal with AES and put down the five million dollar 
performance bond immediately. 
 
------------- 
GOH Reactions 
------------- 
 
9. (SBU) Since March, President Ricardo Maduro, Minister of 
the Presidency Luis Cosenza and a number of presidential 
advisors have approached the Ambassador and other Emboffs 
with strong concerns about the delays in payment of the 
performance bond and news that AES was not planning on 
maintaining a significant interest in the project.  The GOH 
perceives, probably correctly, a big political risk that 
AES' exit strategy will be seized upon by political 
opponents who have criticized Maduro for months for bowing 
to pressure (read interference) from the USG in ultimately 
supporting the AES project.  Note: GOH authorities are deaf 
to any suggestion that they brought these problems on 
themselves by badly mishandling the 2002 tender process, 
forcing an unfinanceable contract down AES' throats over 
Christmas, or refusing to provide the flexibility that would 
allow the company time to bring in a multinational energy 
partner into the equation.  End Note. 
 
10. (SBU) By June, the government began sending letters to 
AES insisting on compliance with the contract and laying the 
groundwork for legal proceedings against AES for breach of 
contract.   In early July, AES received some encouragement 
to provide the details of the contingency plan for bunker 
fuel.  However, on July 9, a negative reply was received 
from the General Manager of ENEE. 
 
11. (SBU) Upon receipt of the letter, AES requested Embassy 
advocacy with President Maduro and his top advisors to 
reconsider the decision.  Without taking a formal position, 
Econcouns participated in a conference call with AES 
officials in Honduras and the U.S. late on July 9 to explain 
our understanding of the GOH's view of the picture and 
Embassy limitations in defending the company's decision on 
an exit strategy immediately after contract signature. 
 
--------------- 
Embassy Comment 
--------------- 
12. (SBU) This is not necessarily the end of the project, 
but the July 9 decision bodes badly.  The GOH apparently 
decided that if AES is exiting the project and proposing 
that a conventional thermal project be substituted for the 
gas version, there is no need for the GOH to respect its 
side of the contract, especially with other well connected 
domestic electricity producers willing to pick up the 
contract.  Time will tell over the next few weeks if the 
Larach Group investors can convince the GOH otherwise.  If 
the contract is lost and the GOH does sue AES Honduras, that 
will also complicate (if not doom) the efforts to continue 
attracting a sizable investor for the gas project itself. 
While the Embassy believes the July 3 AES proposal was 
probably the best possible given the exit-strategy decision, 
we do not recommend any formal advocacy for AES at this 
time. 
 
PALMER